GB/T 24566-2009 English PDFUS$139.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 24566-2009: Monitoring and testing for energy saving of power convertor equipment Status: Valid
Basic dataStandard ID: GB/T 24566-2009 (GB/T24566-2009)Description (Translated English): Monitoring and testing for energy saving of power convertor equipment Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: F01 Classification of International Standard: 27.010 Word Count Estimation: 6,633 Date of Issue: 2009-10-30 Date of Implementation: 2010-05-01 Quoted Standard: GB/T 3485 Regulation (derived from): Announcement of Newly Approved National Standards No. 12 of 2009 (No. 152 overall) Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the rectifier equipment energy monitoring project, monitoring methods and assessment indicators. This standard applies to the number of pulse wave rectifier 6 and above devices. GB/T 24566-2009: Monitoring and testing for energy saving of power convertor equipment---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Monitoring and testing for energy saving of power convertor equipments ICS 27.010 F01 National Standards of People's Republic of China Rectifier equipment energy monitoring Posted 2009-10-30 2010-05-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released ForewordAppendix A of this standard is a normative appendix. This standard by the National Standardization Technical Committee for Energy Management and focal points. This standard was drafted. Tianjin energy monitoring four points, Tianjin Institute of Energy Technology. The main drafters of this standard. Liu Feng, Jia Jun, Ren Changqing, Huoquan Lan, Wangjing Liang, Shangke Wu, Wang Jinxiang, review sheets, Zhu Tianli, Sun Jincheng, Chen Shan, Yao Jiaying. Rectifier equipment energy monitoring1 ScopeThis standard specifies the energy monitoring project rectifier equipment, monitoring methods and assessment indicators. This standard applies to the number of pulse rectifier device 6 and above.2 Normative referencesThe following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard. GB/T 3485 evaluating the rationality of electricity Technical Guidelines3 Terms and DefinitionsThe following terms and definitions apply to this standard. 3.1 By the one or more groups fairing together with rectifier transformers, circuit breakers and other auxiliary equipment consisting of, for rectifying the operation of the equipment unit.4 rectifier equipment energy monitoring projectCheck item 4.1 Location 4.1.1 rectifier equipment shall be GB/T 3485 requirements placed DC power supply network operation mode to be reasonable. 4.1.2 rectifier equipment to be used in place of the transformer load tap induction regulator, in order to improve the rectification efficiency and natural power factor. 4.1.3 rectifier equipment should be configured DC current, voltage and electrical measuring instruments and test cycle. 4.2 Test Project Rectifier power utilization equipment.5 monitoring methods5.1 Conditions and Monitoring time Monitoring should be monitored in rectifier equipment is working properly, the DC load rating of more than 70% 2h. 5.2 Monitoring Instruments Monitoring instruments in good condition, the measurement range and resolution should be adapted to measure the project, its accuracy is not less than the requirements of Table 1 and Unit Within a given period. Table 1 Monitoring Instruments No. Monitoring Project Title instrumentation accuracy 1 electric energy measuring instrument or instruments 2.0 online 2 DC voltmeter 1.0 3 DC current ammeter 1.0 ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 24566-2009_English be delivered?Answer: Upon your order, we will start to translate GB/T 24566-2009_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 24566-2009_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 24566-2009_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |