Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 20907-2024 English PDF

US$519.00 · In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 20907-2024: Technical specification for automatic fare collection system of urban rail transit
Status: Valid

GB/T 20907: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 20907-2024519 Add to Cart 5 days Technical specification for automatic fare collection system of urban rail transit Valid
GB/T 20907-2007339 Add to Cart 3 days Technical requirements for automatic fare collection system of urban rail transportation Valid

Similar standards

QB/T 2590   GB/T 40258   GB 16410   GB/T 14227   GB/T 12758   

Basic data

Standard ID: GB/T 20907-2024 (GB/T20907-2024)
Description (Translated English): Technical specification for automatic fare collection system of urban rail transit
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: Q84
Classification of International Standard: 93.080.30
Word Count Estimation: 26,242
Date of Issue: 2024-09-29
Date of Implementation: 2025-04-01
Older Standard (superseded by this standard): GB/T 20907-2007
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 20907-2024: Technical specification for automatic fare collection system of urban rail transit


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
National Standard of the People's Republic of China ICS 93.080.30CCS Q 84 Technical requirements for automatic ticket vending and checking system for urban rail transit 2024-09-29 Release 2025-04-01 Implementation State Administration for Market Regulation The National Standardization Administration issued Replace GB/T 20907-2007

Table of Contents

Preface Ⅲ 1 Scope...1 2 Normative references ...1 3 Terms and Definitions 2 4 Abbreviations 3 5 General Rules 4 6 System Architecture ...4 7 Tickets for boarding... 5 8 Station terminal equipment...7 9 Station Computer System...11 10 Line Central Computer System...13 11 Line Network Center System...14 12 Network Security...16 13 Inspection and testing 17

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting is required. This document replaces GB/T 20907-2007 "Technical Requirements for Automatic Ticketing and Checking Systems for Urban Rail Transit" and is compatible with GB/T 20907- Compared with.2007, in addition to structural adjustments and editorial changes, the main technical changes are as follows. a) Added the terms "Internet ticketing platform", "line network center system", "ticket", "biometric credential", and "self-service ticketing terminal" “Portable ticket verification machine”, “reader/writer”, “key”, “QR code scanner” and their definitions (see Chapter 3,.2007 Edition) Chapter 3); b) the term “ticket checking machine” is changed to “automatic ticket checking machine” (see 3.14, 3.8 of the.2007 edition); c) Added content such as system functions, standardization, internal and external interfaces, and new technology applications (see 5.1, 5.6, 5.7, and 5.13); d) Change “system structure diagram” to “business logic architecture diagram” (see 6.1, 4.2 of the.2007 edition); e) Added requirements for different network architectures for system convergence settings (see 6.2); f) Changed “ticket” to “boarding voucher” (see Chapter 7, Chapter 5 of the.2007 edition), and added the classification of boarding vouchers (see 7.1); g) Added application file requirements for financial IC cards, QR code tickets, and NFC cards (see 7.5.5, 7.5.6, 7.5.7, and 7.5.8); h) Changed the working environment requirements for terminal equipment (see 8.2.3, 6.2.3 of the.2007 edition); i) Changed the requirements for the interval time for uploading file data of terminal equipment [see 8.2.7 b), 6.2.8.3 of the.2007 edition]; j) Added the equipment composition requirements for terminal equipment (see 8.3.1, 8.4.1, 8.5.1, 8.6.1, 8.7.1); k) Changed the performance requirements for the physical ticket issuing time of the automatic ticket vending machine (see 8.3.3.1, 6.3.2.2 of the.2007 edition); l) The performance requirements for the total ticket and coin storage capacity of automatic ticket vending machines have been changed (see 8.3.3.2, 6.3.2.2 of the.2007 edition); m) The basic functional requirements of semi-automatic ticket vending machines have been changed (see 8.4.2, 6.3.1.1 of the.2007 edition); n) Changed the performance requirements for the processing time of a single boarding pass and the total ticket storage capacity of the automatic ticket gate (see 8.5.3.1, 8.5.3.3, 2007 version 6.4.2), added the door opening time of the gate ticket machine, the maximum impact force during movement, and the minimum distance between passengers following Performance indicators such as alarm value and minimum door closing distance for passengers following behind (see 8.5.3.4, 8.5.3.5, 8.5.3.6, 8.5.3.7); o) Added the functional and performance technical requirements for two terminal devices. self-service ticket terminals and portable ticket inspection machines (see 8.6.2, 8.6.3, 8.7.2, 8.7.3); p) Changed the station computer system composition, added network security equipment and system software system composition, and added server cloud rack New optional configuration methods for architecture and virtualization, uninterruptible power supply configuration, and linkage functions for emergency button controllers (see 9.1, 7.1 of the.2007 edition); q) The basic functions of the station computer system have been changed (see 9.2, 7.2 of the.2007 edition); r) The main performance of the station computer system has been changed, including the parameter delivery feedback time, real-time report query and return time, and traffic Requirements on storage time of data (see 9.3.2, 9.3.4, 9.3.6, 7.3 of the.2007 edition); s) The central computer system of the line was changed, storage devices, network security equipment and system software were added, and service New optional configuration methods for server cloud architecture and virtualization (see 10.1, 8.1 of the.2007 edition); t) The basic functions of the line central computer system have been changed (see 10.2, 8.2 of the.2007 edition); u) Added performance requirements for transaction data processing, storage, backup, etc. of the line central computer system (see 10.3.2, 10.3.4, 10.3.9); v) Added the relevant content of “Line Network Center System” (see Chapter 11); w) Added network security related requirements (see Chapter 12); x) Added inspection and testing related requirements (see Chapter 13). Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed by the Ministry of Housing and Urban-Rural Development of the People's Republic of China. This document is under the jurisdiction of the National Technical Committee on Standardization of Urban Rail Transit (SAC/TC 290). This document was drafted by. China Urban Construction Research Institute Co., Ltd., Shanghai Shentong Metro Group Co., Ltd., Nanjing Metro Group Co., Ltd. Company, Tianjin Rail Transit Group Co., Ltd., China Railway Fourth Survey and Design Institute Group Co., Ltd., Shanghai Tunnel Engineering Rail Transit Design Research Institute, Guangzhou Metro Group Co., Ltd., Shenzhen Metro Group Co., Ltd., Shanghai China Railway Communication Signal Testing Co., Ltd., Putian Rail Road Traffic Technology (Shanghai) Co., Ltd., Nanjing Panda Information Industry Co., Ltd., Shanghai Public Transport Card Co., Ltd., Shanghai Huaming Intelligent Energy Terminal Equipment Co., Ltd., China Academy of Railway Sciences Group Co., Ltd., Shanghai Yidian Wulian Technology Co., Ltd., Zhejiang Zhejiang University Network New Zhonghe Rail Transit Engineering Co., Ltd., Beijing Institute of Technology. The main drafters of this document are. Zhang Zidong, Cai Jiani, Wang Jian, Xu Daoqiang, Yang Chengdong, Shi Huilin, Guo Jingfan, Zhou Shishuang, Feng Juan, Zhao Xiaorong, Wei Qiang, Zhang Peng, Xu Zhenyu, Cheng Mingshuo, Song Zekun, Wang Chunhua, Zhang Ming, Cao Jiayu, Xu Zhijun, Cao Li, Wang Jiong, Qin Guodong, Wang Yuxin, Quan Liangchen, Ye Desheng, Qian Honghua, Gao Shen, Gao Hongbo, Chen Peiwen, He Jie, Li Jiang, Cheng Haipeng, Zhang Zhengrong. This document was first published in.2007 and this is the first revision. Technical requirements for automatic ticket vending and checking system for urban rail transit

1 Scope

This document establishes the general principles and system architecture of the Urban Rail Transit Automatic Ticketing and Checking System (hereinafter referred to as the "Automatic Ticketing and Checking System"), and stipulates The system includes boarding vouchers, station terminal equipment, station computer systems, line central computer systems, line network center systems, network security, inspection and Testing requirements. This document is applicable to the production and operation management of the automatic ticket vending and checking system for urban rail transit, and to the urban area interconnected with urban rail transit. (Suburban) railway and other systems shall follow this practice.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 2828.1 Sampling procedures for inspection by attributes Part 1.Sampling plans for batch inspection based on acceptance quality limit (AQL) GB 4943.1 Audio, video, information technology and communication technology equipment Part 1.Safety requirements GB/T 9254.1 Electromagnetic compatibility of information technology equipment, multimedia equipment and receivers Part 1.Emission requirements GB/T 9254.2 Electromagnetic compatibility of information technology equipment, multimedia equipment and receivers Part 2.Immunity requirements GB/T 14916 Physical characteristics of identification cards GB/T 16649.1 Identification cards - Integrated circuit cards with contacts - Part 1.Physical characteristics GB/T 17554.1 Identification card test method Part 1.General characteristics test GB 17625.1 Electromagnetic compatibility limits Part 1.Harmonic current emission limits (equipment input current per phase ≤ 16 A) GB/T 18284 Quick Response Matrix Code GB/T 22239 Information security technology Network security level protection basic requirements GB/T 22240 Information security technology - Guidelines for classification of network security protection levels GB/T 25000.51 Systems and Software Engineering System and Software Quality Requirements and Evaluation (SQuaRE) Part 51.Readiness Quality requirements and test specifications for RUSP GB/T 28210 Thermal paper GB/T 38674 Information security technology application software security programming guide GB/T 40660 Information security technology Basic requirements for biometric identification information protection CJ/T 166 Technical requirements for the application of integrated circuit (IC) cards in the construction industry CJJ/T 162 Technical Specification for Testing of Automatic Ticketing and Checking Systems for Urban Rail Transit JR/T 0025.12 China Financial Integrated Circuit (IC) Card Specification Part 12.Contactless IC Card Payment Specification JT/T 978.2 Technical Specifications for Urban Public Transport IC Cards Part 2.Cards JT/T 1179 Transportation Card QR Code Payment Technical Specification ISO /IEC 14443-2 Contactless proximity of objects for personal identification cards and security devices Part 2.Radio frequency power and signal interface (Cards and security devices for personal identification-Contactless proximity objects-Part 2.Radio frequency power and signal interface)
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 20907-2024_English be delivered?

Answer: Upon your order, we will start to translate GB/T 20907-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 20907-2024_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 20907-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 20907-2024?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 20907-2024 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.