Home   Cart   Quotation   Policy   About-Us
www.ChineseStandard.net
SEARCH

GB/T 20818.12-2020 English PDF

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 20818.12-2020RFQ ASK 3 days Industrial-process measurement and control - Data structures and elements in process equipment catalogues - Part 12: Lists of properties (LOPs) for flow measuring equipment for electronic data exchange Valid

Similar standards

GB/T 20438.5   GB/T 20438.4   GB/T 20438.6   GB/T 20818.15   GB/T 20818.16   GB/T 20818.14   

Basic data

Standard ID: GB/T 20818.12-2020 (GB/T20818.12-2020)
Description (Translated English): Industrial-process measurement and control - Data structures and elements in process equipment catalogues - Part 12: Lists of properties (LOPs) for flow measuring equipment for electronic data exchange
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: N10
Classification of International Standard: 25.040
Word Count Estimation: 462,438
Date of Issue: 2020-09-29
Date of Implementation: 2021-04-01
Regulation (derived from): National Standard Announcement No. 20 of 2020
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 20818.12-2020: Industrial-process measurement and control - Data structures and elements in process equipment catalogues - Part 12: Lists of properties (LOPs) for flow measuring equipment for electronic data exchange



---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Industrial-process measurement and control - Data structures and elements in process equipment catalogues - Part 12.Lists of properties (LOPs) for flow measuring equipment for electronic data exchange ICS 25.040 N10 National Standards of People's Republic of China Industrial process measurement and control Data structure and elements in the process equipment catalog Part 12.Electronic data of flow measurement equipment List of Exchange Attributes (LOPs) 2020-09-29 released Implementation on 2021-04-01 State Administration for Market Regulation Issued by the National Standardization Management Committee

Table of contents

Foreword Ⅰ Introduction Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 Overview 1 4.1 Summary 1 4.2 OLOP and DLOP 2 4.3 Example of DLOP block usage 5 Appendix A (Normative Appendix) List of Operating Attributes of Flow Measurement Devices 12 Appendix B (Normative Appendix) List of Equipment Attributes of Flow Measuring Devices 28 B.1 Flow Transmitter 28 B.2 Coriolis Mass Flow Transmitter 84 B.3 Electromagnetic flow transmitter 243 Appendix C (Normative Appendix) Property Library 380 Appendix D (normative appendix) Block library for the device type under consideration 438 References 456

Foreword

GB/T 20818 "Data Structure and Elements in the Catalog of Industrial Process Measurement and Control Process Equipment" is currently divided into the following 6 parts. ---Part 1.Measuring equipment with analog and digital output; ---Part 10.Basic Principles of Attribute Lists (LOPs) for Industrial Process Measurement and Control Electronic Data Exchange; ---Part 11.General structure of attribute lists (LOPs) for electronic data exchange of measuring equipment; ---Part 12.Attribute Lists (LOPs) for Electronic Data Exchange of Flow Measuring Equipment; ---Part 13.Attribute Lists (LOPs) for Electronic Data Exchange of Pressure Measuring Equipment; ---Part 21.General structure of attribute list (LOP) for automatic valve electronic data exchange. This part is Part 12 of GB/T 20818. This section was drafted in accordance with the rules given in GB/T 1.1-2009. This part uses the redrafting method to modify the data in the IEC 61987-12.2016 "Industrial Process Measurement and Control Process Equipment Catalog" Data structure and elements. Part 12.Attribute Lists (LOPs) for Electronic Data Exchange of Flow Measuring Equipment. The technical differences between this part and IEC 61987-12.2016 and the reasons are as follows. ---Regarding normative reference documents, this section has made adjustments with technical differences to adapt to my country's technical conditions and adjustments. The situation is collectively reflected in Chapter 2 "Normative Reference Documents", and the specific adjustments are as follows. ● GB/T 17564 (all parts) is used instead of IEC 61360 (all parts). The degree of consistency between the parts of the two standards is as follows. ◆ GB/T 17564.1-2011 Standard Data Element Types and Related Classification Models of Electrical Projects Part 1.Definition Principles and methods (IEC 61360-1.2009, IDT); ◆ GB/T 17564.2-2013 Standard Data Element Types and Related Classification Models of Electrical Components Part 2. EXPRESS dictionary mode (IEC 61360-2.2012, IDT); ◆ GB/T 17564.3-1999 Standard Data Element Types and Related Classification Models of Electrical Components Part 3. Maintenance and validation procedures (eqvIEC 61360-3.1995); ◆ GB/T 17564.4-2009 Standard Data Element Types and Related Classification Models of Electrical Components Part 4. IEC standard data element type and component category benchmark set (IEC 61360-4.2005, IDT); ---In order to adapt to my country's national conditions and better reflect the core technical content, appendix A, Appendix B, and Appendix C in IEC 61987-12.2016 The link to the attribute list in Appendix D gives the attribute list in table form; ---In order to adapt to my country's technical conditions, B.3, B.4, B.5, B.6, B.7, B.8, B.3, B.4, B.5, B.6, B.7, B.8, and B.3 of Appendix B of IEC 61987-12.2016 have been deleted. B.10, B.11, B.12, B.13, B.14, B.15, B.16, change B.9 of Appendix B of IEC 61987-12.2016 to B.3. This part was proposed by China Machinery Industry Federation. This part is under the jurisdiction of the National Industrial Process Measurement and Automation Standardization Technical Committee (SAC/TC124). Drafting organizations of this section. Institute of Comprehensive Technology and Economics of Mechanical Industry Instrumentation, Chongqing Chuanyi Automation Co., Ltd., Hunan Branch University of Technology, Southwest University, China Instrument and Control Society, Shanghai Institute of Industrial Automation Instrumentation Co., Ltd., Beijing Machinery Industry Automation Research Institute, Shanghai Automation Instrumentation Co., Ltd., Beijing Aviation Precision Machinery Research Institute of Aviation Industry Corporation of China, Electric Power Planning Institute Co., Ltd. Company, Qingdao Automation Instrument Co., Ltd., Xi’an Dongfeng Electric Co., Ltd., Hangzhou Pangu Automation System Co., Ltd., Xiamen Yudian Donghua Technology Co., Ltd., Chongqing Weian Detector Manufacturing Co., Ltd., Tsinghua University, Tianjin University, Chongqing University of Posts and Telecommunications, Beijing Advantech Xingye Electronic Technology Co., Ltd., Shenzhen Jiyang Intelligent Technology Co., Ltd., Siemens (China) Co., Ltd., Rockwell Automation (China) Co., Ltd., Chongqing Institute of Industrial Automation Instrumentation, Shenzhen Wanxun Automation Co., Ltd., Beibei District Kemeng Instrument Co., Ltd., Changzhou University School, Beijing Ruipu Sanyuan Metering Technology Co., Ltd., Hubei Nankong Instrument Technology Co., Ltd., Jiangsu Hongguang Instrument Factory Co., Ltd., Hangzhou Zhenhua Purcell Instrument Co., Ltd., Tianjin Xuner Instrument Technology Co., Ltd., Xi'an Shaangu Power Co., Ltd. The main drafters of this section. Wang Chunxi, Wang Shuo, Lu Tielin, Tian Yingming, Cheng Jixun, Zhou Xuelian, Zhang Ying, Liu Feng, Zhang Xinguo, Yu Meimei, Tu Xuan, Li Baihuang, Zhang Qingjun, Zhang Tan, Cheng Shuang, Zhang Jinbin, Dou Jianjun, Zhang Peng, Guo Haojie, Zhou Yu, Jiang Yanfang, Ou Wenhui, Wang Xue, Dong Feng, Wang Heng, Xie Haofei, Zhang Yan, Liu Xuedong, Yang Rukun, Xu Bin, Hua Rong, Liu Qin, Yuan Fei, Yan Legang, Zou Ling, Li Zhenzhong, Guan Rongtao, Cui Shanchao, Xing Weiji, Li Hongsuo, Tian Weirong.

Introduction

Products between companies, business systems, engineering tools, collaborative data systems, and future control systems (electrical, measurement and control technology) The smooth progress of data exchange depends on the clear definition of the information exchanged and the purpose of the information. In the past, when users asked suppliers or manufacturers for suitable equipment, they put forward different requirements for measurement and control equipment. Supplier in When describing these devices, they use their own document solutions, often using different terminology, structures, and carriers (paper files, databases, CDs, Electronic samples, etc.). In the planning and development process, there are similar situations where equipment information is frequently copied to different information technology departments. In order to answer the user’s inquiry. Any method that can record all existing information during the plan planning and ordering process and can be used for subsequent processing can be provided to all relevant parties. Provide a way to focus on these elements. The prerequisite is the standardization of target description and data exchange. This section focuses on smart flow meters and specifies a list of operational attributes of flow meters, which can be used for various types of quotation requirements, for example. The device attribute lists of different flow transmitter types provided in this section can be used in different ways. ---Used to install in the computer systems of manufacturers and suppliers; --- Used in CAE (Computer Aided Engineering) and similar systems of EPC (General Contracting for Engineering) contractors and other engineering companies; --- Especially used in different workshop maintenance systems of workshop owners. Industrial process measurement and control Data structure and elements in the process equipment catalog Part 12.Electronic data of flow measurement equipment List of Exchange Attributes (LOPs)

1 Scope

This part of GB/T 20818 stipulates. ● Operational attribute list (OLOP) used to describe the operating parameters of the flow measurement device and a collection of requirements for the flow measurement device; ● A list of device attributes (DLOP) used to describe different types of flow measurement devices. The structure of OLOP and DLOP conforms to the general structure defined in GB/T 20818.11-2018, and conforms to GB/T 20818.10- The basic principles for building LOPs defined in.2017. Other aspects other than OLOP required in the different electronic data exchange processes described in GB/T 20818.10-2017 will be Published in IEC 61987-92. This section applies to the description of the properties of flow measurement equipment in the process of electronic data exchange.

2 Normative references

The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article Pieces. For undated references, the latest version (including all amendments) applies to this document. GB/T 17564 (all parts) Electrical standard data element types and related classification modes [IEC 61360 (all parts)] GB/T 20818.10-2017 Part 10 of Data Structure and Elements in Process Equipment Catalog for Industrial Process Measurement and Control Points. Basic principles of attribute lists (LOPs) used for industrial process measurement and control electronic data exchange (IEC 61987-10.2009, IDT) GB/T 20818.11-2018 Industrial Process Measurement and Control Process Equipment Catalog Data Structure and Elements Part 11. General structure of attribute lists (LOPs) for electronic data interchange of measuring equipment (IEC 61987-11.2012, IDT)

3 Terms and definitions

The terms and definitions defined in GB/T 20818.10-2017 and GB/T 20818.11-2018 apply to this document.

4 overview

4.1 Summary The LOPs provided in this section are used in the electronic data exchange process performed by any two computer systems. Such as GB/T 20818.10- As described in Appendix C in.2017, computer systems can belong to the same company or different companies. The OLOP of the flow measurement device family is shown in Appendix A, and the DLOP of different flow device types is shown in Appendix B. See Appendix C and Appendix D for the attribute library and block library used by LOPs in this section. The structural elements defined in this section such as LOP types, blocks and attributes are in the IEC public data dictionary in the field of "automation devices" (CDD) available in the spreadsheet.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 20818.12-2020_English be delivered?

Answer: Upon your order, we will start to translate GB/T 20818.12-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 20818.12-2020_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 20818.12-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.