US$299.00 · In stock · Download in 9 secondsGB/T 19054-2025: General technical conditions for fuel oil cremator
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See
step-by-step procedureStatus: Valid
GB/T 19054: Historical versions
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| GB/T 19054-2025 | English | 299 |
Add to Cart
|
3 days [Need to translate]
|
General technical conditions for fuel oil cremator
|
| GB 19054-2003 | English | 239 |
Add to Cart
|
3 days [Need to translate]
|
[GB/T 19054-2003] General technical conditions for fuel oil cremator
|
Click to Preview a similar PDF
Basic data
| Standard ID | GB/T 19054-2025 (GB/T19054-2025) |
| Description (Translated English) | General technical conditions for fuel oil cremator |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | J88 |
| Classification of International Standard | 13.030.40 |
| Word Count Estimation | 14,190 |
| Date of Issue | 2025-12-31 |
| Date of Implementation | 2026-04-01 |
| Older Standard (superseded by this standard) | GB/T 19054-2003 |
| Issuing agency(ies) | State Administration for Market Regulation, Standardization Administration of China |
GB/T 19054-2025: General technical conditions for fuel oil cremator
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 13.030.40
CCSJ88
National Standards of the People's Republic of China
Replaces GB/T 19054-2003
General technical conditions for oil-fired cremator
Published on 2025-12-31
Implemented on April 1, 2026
State Administration for Market Regulation
The State Administration for Standardization issued a statement.
Table of contents
Preface III
1.Scope 1
2 Normative References 1
3.Terms and Definitions 1
4.Technical Requirements 2
4.1 Environmental Conditions 2
4.2 Usage Performance 3
4.3 Safety Requirements 3
4.4 Environmental Protection Requirements 3
4.5 Appearance Requirements 4
4.6 Material Requirements 4
4.7 Installation process requirements 4
5.Test Methods 4
5.1 Environmental Conditions 4
5.2 Usage Performance 4
5.3 Safety Requirements 5
5.4 Environmental protection requirements 6
5.5 Appearance Requirements 6
5.6 Installation process requirements 6
6 Inspection Rules 6
6.1 Inspection Classification 6
6.2 Acceptance Inspection 6
6.3 Type Testing 7
7.Paint, packaging, marking, and acceptance documents
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1.Structure and Drafting Rules of Standardization Documents".
Drafting.
This document replaces GB/T 19054-2003 "General Technical Conditions for Oil-Fired Cremators". Compared with GB/T 19054-2003, the following changes are made.
Aside from structural adjustments and editorial changes, the main technical changes are as follows.
---The definition of the term "Taiwanese cremator" has been changed (see 3.12,.2003 edition);
---Two new terms and definitions have been added. "cremation time" and "shutdown insulation performance" (see 3.13 and 3.14);
---The technical specifications and requirements for cremation time, fuel consumption, service life, refractory temperature of brick structures, and refractory surface have been revised (see [link]).
4.2.1~4.2.6 (4.2.1~4.2.6 in the.2003 edition);
---Added requirements for the height of the cremator operating door (see 4.2.8);
---The provision that "the gauge of the ground rails for transporting corpses is set at 1850mm" has been deleted (see section 4.2.9 of the.2003 edition);
---Technical requirements for the ash removal door and observation port of the cremator have been revised (see 4.2.12, 4.2.13, and 4.2.13 in the.2003 edition);
---Added requirements for flue gas emission pipelines within the cremation chamber (see 4.2.14);
---The requirement to install inspection ports on the exhaust system duct has been removed (see 4.2.15 of the.2003 edition);
---Added technical requirements for the operation of the body loading system, the raising and lowering of the flue damper, and burner ignition (see 4.2.17, 4.2.18, and 4.2.19);
---Added technical requirements for the thermal insulation performance of the cremator during shutdown (see 4.2.20);
---The technical requirements for the control system have been increased (see 4.3.7);
---The technical requirements for the main combustion chamber operating pressure have been revised (see 4.4.3,.2003 version 4.4.3);
---Technical requirements for flue gas waste heat recovery devices have been added (see 4.4.4);
---The appearance requirements have been changed (see 4.5,.2003 version 4.5);
---The installation process requirements have been changed (see 4.7, 4.7 and 4.8 in the.2003 edition);
---A method for detecting cremation time has been added (see 5.2.1);
---A method for testing the fire resistance temperature of brick structures in the main combustion chamber and secondary combustion chamber that are in direct contact with the flame has been added (see 5.2.5);
---Added a method for inspecting the refractory surface of the furnace body after cremating 300 bodies (see 5.2.6);
---Added detection methods for the main combustion chamber length, width and height of the main combustion chamber and the mortuary entrance (see 5.2.8);
---Added operational reliability testing methods for the lifting and lowering of the mortuary vehicle, furnace door, and flue damper (see 5.2.16~5.2.18);
---Added a method for detecting burner ignition success rate (see 5.2.19);
---Added a method for testing the insulation performance during boiler shutdown (see 5.2.20);
---The content of the acceptance inspection has been changed (see 6.2, 5.2~5.6 of the.2003 edition).
Please note that some content in this document may involve patents. The issuing organization of this document assumes no responsibility for identifying patents.
This document was proposed by the Ministry of Civil Affairs of the People's Republic of China.
This document is under the jurisdiction of the National Technical Committee on Standardization of Funeral Services (SAC/TC354).
This document was drafted by. the 101 Research Institute of the Ministry of Civil Affairs, the China Funeral Association, the Shanghai Funeral Service Center, and the Shanghai Yishan Funeral Home.
Guangzhou Municipal Funeral Service Center, Anqing Municipal Funeral Management Office, Xiamen Kaimu Management Consulting Co., Ltd., and Xiamen Minyu Holdings Co., Ltd.
The main drafters of this document are. Meng Hao, Gao Yuan, Fang Xiang, Sun Chenglong, Tian Lin, Wang Wei, Wang Lishuan, Cheng Jian, Xiao Chenglong, Gao Shandong, and Wang Guiling.
Li Bingjie, Shi Feng, Qian Gao, Guo Chan, Mou Yu, Guo Lei, Yong Guoxiang, Zhang Yiping, Xu Fuhai, Duan Pingru, Liu Yong, Hu Rongzhong, Ren Liwei, Lü Liangwu
Zeng Weipeng.
The release history of this document and the document it replaces is as follows.
---First published in.2003 as GB/T 19054-2003;
---This is the first revision.
General technical conditions for oil-fired cremator
1 Scope
This document specifies the technical requirements and inspection rules for fuel-fired crematoriums, and describes the relevant test methods.
This document applies to fuel-fired crematoriums.
2 Normative references
The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included.
For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies.
This document.
GB/T 2888 Noise Measurement Method for Fans and Roots Blowers
GB/T 7251.1 Low-voltage switchgear and controlgear assemblies – Part 1.General principles
GB/T 10233-2016 Basic Test Methods for Low-Voltage Switchgear and Electrical Control Equipment
GB/T 10325 Sampling Inspection Rules for Acceptance of Shaped Refractory Products
GB/T 10326 Inspection methods for dimensions, appearance and cross-section of shaped refractory products
GB 13801 Air Pollutant Emission Standard for Crematoriums
GB/T 16618 General Technical Specifications for Thermal Insulation of Industrial Furnaces and Kilns
GB/T 24343 Test Specification for Insulation Resistance of Electrical Equipment for Industrial Machinery
GB 50211 Code for Construction and Acceptance of Industrial Furnace Masonry
GB 50254 Code for Construction and Acceptance of Low-Voltage Electrical Equipment in Electrical Installations
GB 50309 Standard for Acceptance of Quality of Industrial Furnace Masonry Engineering
GB 50575 Construction and Acceptance Specification for Wiring Engineering of 1kV and Below
JC/T 532 General Technical Requirements for Welded Components of Building Materials and Machinery Steel
NB/T 10939 Rules for Acceptance Inspection of Materials Used in Boilers
NB/T 47055 General Technical Requirements for Boiler Painting and Packaging
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
fueloil cremator
It is a specialized device for cremating remains, which uses oil as fuel and consists of a furnace body, a blower-oil system, an electrical control system, an exhaust system, and a body loading system.
3.2
furnace body
The main body of the cremator consists of the main combustion chamber, the re-combustion chamber, the brick structure, and the external structure.
3.3
The space inside the furnace used for the direct cremation of remains.
...