GB/T 18916.32-2017 English PDFUS$119.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 18916.32-2017: Norm of water intake -- Part 32: Iron ore mineral processing Status: Valid
Basic dataStandard ID: GB/T 18916.32-2017 (GB/T18916.32-2017)Description (Translated English): Norm of water intake -- Part 32: Iron ore mineral processing Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: P41 Classification of International Standard: 13.060.25 Word Count Estimation: 6,629 Date of Issue: 2017-09-29 Date of Implementation: 2018-04-01 Regulation (derived from): National Standard Announcement 2017 No. 23 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China GB/T 18916.32-2017: Norm of water intake -- Part 32: Iron ore mineral processing---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Norm of water intake-Part 32. Iron ore mineral processing ICS 13.060.25 P41 National Standards of People's Republic of China Water quota - Part 32. Iron ore beneficiation 2017-09-29 Posted 2018-04-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released ForewordGB/T 18916 "water quota", has been or plans to release The following section. --- Part 1. Thermal power generation; --- Part 2. Steel and iron joint ventures; --- Part 3. Oil refining; --- Part 4. Textile dyeing and finishing products; --- Part 5. Paper products; --- Part 6. Beer manufacturing; --- Part 7. Alcohol manufacturing; --- Part 8. Synthetic ammonia; --- Part 9. MSG manufacturing; --- Part 10. Medical products; --- Part 11. Coal preparation; --- Part 12. Alumina production; --- Part 13. Ethylene production; --- Part 14. Wool textile products; --- Part 15. Liquor manufacturing; --- Part 16. Electrolytic aluminum production; --- Part 17. Stacked bauxite production; --- Part 18. Copper smelting production; --- Part 19. Lead smelting production; --- Part 20. Chemical fiber filament woven products; --- Part 21. True silk products; --- Part 22. Starch sugar manufacturing; --- Part 23. Citric acid manufacturing; --- Part 24. Ma textile products; --- Part 25. Viscose fiber products; --- Part 26. Soda ash; --- Part 27. Urea; --- Part 28. Industrial sulfuric acid; --- Part 29. Caustic soda; --- Part 30. Coking; --- Part 31. Steel industry sintering/pellets; --- Part 32. Iron ore beneficiation. This section GB/T 18916 Part 32. This section drafted in accordance with GB/T 1.1-2009 given rules. This section in accordance with GB/T 18820 "industrial enterprise water quota preparation rules" established by the principle. This part is proposed by the Ministry of Water Resources and the National Development and Reform Commission. This part by the National Water Standardization Technical Committee (SAC/TC442) and the National Iron Ore and Direct Reduction Iron Standardization Technical Committee Will (SAC/TC317) centralized. This part of the drafting unit. Anshan Iron and Steel Group Mining Co., Ltd., Anshan Iron and Steel Group Mining Design and Research Institute Co., Ltd., Metallurgical Industry Information Standards Research Institute, China National Institute of Standardization, Ministry of Water Resources Water Management Center. The main drafters of this section. Mk Wei, Zhu Bo, Chen Jianli, Gao Jingjun, Wang Jiangwei, Qiu Jinhui, Wang Yujie, Hu Zongheng, Bai Zhenhe, Zhai Anfu, Li Changliang, Zhang Shuling, Hu Mengting. Water quota - Part 32. Iron ore beneficiation1 ScopeGB/T 18916 This section gives the iron ore beneficiation water quota terms and definitions, calculation methods and water quota. This section applies to the existing, new and renovation and expansion of iron ore processing enterprises to take over the management of water.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest version (including all changes) applies to this document. GB/T 12452 business water balance and testing rules GB/T 18820 industrial products water quota preparation rules GB/T 21534 industrial water-saving terms GB 24789 water units of water measuring instruments and management of general rules3 Terms and definitionsGB/T 18820 and GB/T 21534 defined terms and definitions apply to this document.4 calculation method4.1 General Provisions 4.1.1 water withdrawal range The range of water withdrawal refers to the amount of water the enterprise extracts from various conventional sources of water, including those taken from surface water (measured by the water supply of the water treatment plant), groundwater, Urban water supply projects, and other water or water products (such as steam, hot water, geothermal water, etc.) purchased by the enterprise from the market. The amount of water should be added to factories and mines that send the concentrate to pipelines in different places and no longer reclaim the filtered water. 4.1.2 water supply range Iron ore beneficiation The scope of water supply to the mine, including the main production (including crushing, screening, beneficiation, concentrate production within the concentrator, etc.), auxiliary Production (including water treatment, boiler room, mechanical repair, inspection and transportation, etc.) and subsidiary production (including office, afforestation, factory canteen, bathroom and toilet Etc.); does not include the water withdrawal of enterprises owned power plants (including power plants for their own use of chemical water) and dry process water consumption. 4.1.3 Measurement of water withdrawal Take the amount of water to a business meter measurement shall prevail. 4.2 tons of ore to take water Tons of raw water withdrawal according to formula (1) calculation. Vui = Vi (1) ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 18916.32-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 18916.32-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 18916.32-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 18916.32-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |