Path:
Home >
GB/T >
Page738 > GB/T 17389-2026
Price & Delivery
US$539.00 · In stock · Download in 9 secondsGB/T 17389-2026: Manufacture, inspection and application of electric submersible pump cable
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See
step-by-step procedureStatus: Valid
GB/T 17389: Historical versions
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| GB/T 17389-2026 | English | 539 |
Add to Cart
|
5 days [Need to translate]
|
Manufacture, inspection and application of electric submersible pump cable
|
| GB/T 17389-2013 | English | 649 |
Add to Cart
|
5 days [Need to translate]
|
Recommended practice for the application of electrical submersible cable system
|
| GB/T 17389-1998 | English | 999 |
Add to Cart
|
4 days [Need to translate]
|
Recommended practice for application of ESP submersible cable systems
|
Click to Preview a similar PDF
Basic data
| Standard ID | GB/T 17389-2026 (GB/T17389-2026) |
| Description (Translated English) | Manufacture, inspection and application of electric submersible pump cable |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | E92 |
| Classification of International Standard | 75.180.10 |
| Word Count Estimation | 26,296 |
| Date of Issue | 2026-02-27 |
| Date of Implementation | 2026-09-01 |
| Older Standard (superseded by this standard) | GB/T 18050-2000, GB/T 17389-2013 |
| Issuing agency(ies) | State Administration for Market Regulation, Standardization Administration of China |
GB/T 17389-2026: Manufacture, inspection and application of electric submersible pump cable
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 75.180.10
CCSE92
National Standards of the People's Republic of China
Replaces GB/T 17389-2013 and GB/T 18050-2000
Manufacturing, Inspection and Application of Submersible Electric Pump Cables
Published on 2026-02-27
Implemented on 2026-09-01
State Administration for Market Regulation
The State Administration for Standardization issued a statement.
Table of contents
Preface III
1.Scope 1
2 Normative References 1
3.Terms and Definitions 1
4.Classification and Structure 2
4.1 Classification 2
4.2 Structure 2
5 Manufacturing 3
5.1 General Requirements 3
5.2 Materials 3
5.3 Dimensions 4
5.4 Factory Inspection 5
6 Applications 5
6.1 General Rules 5
6.2 Material Selection 5
6.3 Connection 6
6.4 Termination 6
6.5 Fixes 6
7.On-site inspection 7
7.1 Detection Classification 7
7.2 Testing Items 7
7.3 Detection Methods 7
7.4 Detection Judgment Rule 13
Appendix A (Normative) Minimum Insulation Resistance of Commonly Used Cables 14
Appendix B (Informative) Electricity Cost Analysis 17
B.1 General Provisions 17
B.2 Voltage and Current 17
B.3 Conductor size 17
B.4 Analytical Methods 17
Appendix C (Informative) Cable Repair Diagram 18
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1.Structure and Drafting Rules of Standardization Documents".
Drafting.
This document supersedes GB/T 17389-2013 "Application of Submersible Electric Pump Cable Systems" and GB/T 18050-2000 "Submersible Electric Pump Cables".
This document, "Test Methods," is based primarily on GB/T 17389-2013, and incorporates content from GB/T 18050-2000.It is consistent with GB/T 17389-
Compared to.2013, aside from structural adjustments and editorial changes, the main technical changes are as follows.
---The scope has been changed (see Chapter 1, Chapter 1 of the.2013 edition);
---Terms and definitions such as "US wire diameter, current carrying capacity, and antioxidants" have been removed (see Chapter 3 of the.2013 edition);
---Added terms and definitions such as "submersible pump cable, lead cable, and cable head" (see Chapter 3);
---Added the requirement of "categorization" (see 4.1);
---The conductor configuration and typical cable unit structure have been changed (see Figures 1 and 2, Figure 1 in the.2013 version);
---The metric standard for cable conductor dimensions has been revised (see Tables 1 and 3, Table 1 in the.2013 edition);
---The imperial standard for cable conductor dimensions has been removed (see Table 2 in the.2013 edition);
---Added requirements for the manufacture of submersible electric pump cables (see Chapter 5);
---Added conditions for the application of submersible electric pump cables (see Chapter 6);
---The requirement for cable bending radius has been increased (see 6.1.3);
---Added methods for on-site testing of submersible pump cables (see Chapter 7);
---The section "Woven Layers and Protective Layers" has been removed (see Chapter 8 in the.2013 edition);
---The section "Cable Auxiliary Equipment" has been removed (see Chapter 10 of the.2013 edition);
---The minimum insulation resistance of commonly used cables has been increased (see Appendix A).
Please note that some content in this document may involve patents. The issuing organization of this document assumes no responsibility for identifying patents.
This document was proposed and is under the jurisdiction of the National Technical Committee on Standardization of Petroleum Drilling Equipment and Tools (SAC/TC96).
This document was drafted by. Daqing Oilfield Lishen Pump Industry Co., Ltd., Shengli Oilfield Shengli Pump Industry Co., Ltd., and Bohai Petroleum Equipment.
(Tianjin) Zhongcheng Machinery Manufacturing Co., Ltd., Daqing Oilfield Oil Production Technology Research Institute, Daqing Oilfield Bidding Center Co., Ltd., Shandong Wanda
Cable Co., Ltd., Anhui Huining Electric Instrument Group Co., Ltd., and Hebei Huatong Cable Group Co., Ltd.
The main drafters of this document are. Li Jing, Yang Bin, Zhang Baozhu, Li Yaling, Wang Chaoyang, Wang Guiquan, Xing Houwei, Wang Chao, Yu Hongying, and Zhang Naiyuan.
Pan Zongjiang, Yin Bin, Li Jie, Li Pengchao, Zhang Yu, Zhou Changfu, Niu Tongmao, Jiang Baojun, Li Ping, Diao Zhangguo, Wang Peng, Liu Yukun, Wang Weijun, Zhao Jia
Zhang Yan.
This document was first published in.1998, revised for the first time in.2013, and this is the second revision, incorporated into GB/T 18050-2000.
Contents of "Test Methods for Submersible Electric Pump Cables".
Manufacturing, Inspection and Application of Submersible Electric Pump Cables
1 Scope
This document specifies the classification and structure, manufacturing, application, and field testing requirements for submersible pump cables.
This document applies to the testing, acceptance, and application of cables used in submersible electric pumps, submersible screw pumps, submersible plunger pumps, and submersible diaphragm pump units.
2 Normative references
The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included.
For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies.
This document.
GB/T 16750 Submersible Electric Pump Unit
JB/T 5332.1 Cables for electric submersible pumps with rated voltage of 3.6/6kV and below - Part 1.General Provisions
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Cables that power downhole submersible pumps.
3.2
Motor-lead extension cable
A cable used to connect and enable a smooth transition between the downhole motor and the submersible pump cable.
3.3
cable head
The component that connects the submersible pump's lead cable to the motor and isolates the motor oil from the well fluid.
3.4
Acceptance testing
The user conducts tests on the new cable and its connecting devices that he/she receives.
3.5
Diagnostic testing
Tests to determine the location of the fault, analyze the cause of the fault, and assess the performance of the repaired cable before putting it back into use.
3.6
maintenance testing
Testing of used cables before reuse.
3.7
Wellsite testing
Tests to detect whether the cable system is damaged during and after its deployment into the well.
...