GB/T 17215.941-2012 English PDFUS$374.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 17215.941-2012: Electricity metering equipment -- Dependability -- Part 41: Reliability prediction Status: Valid
Similar standardsGB/T 15284 GB/T 17215.321 GB/T 34067.2 GB/T 17215.241 GB/T 17215.301 GB/T 17215.302Basic dataStandard ID: GB/T 17215.941-2012 (GB/T17215.941-2012)Description (Translated English): Electricity metering equipment -- Dependability -- Part 41: Reliability prediction Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: N22 Classification of International Standard: 17.220.20 Word Count Estimation: 19,184 Quoted Standard: GB/T 2900.13-2008; GB/T 17215.911-2011; GB/T 17215.921-2012; IEC 61709-1996 Adopted Standard: IEC 62059-41-2006, IDT Regulation (derived from): National Standards Bulletin No. 41 of 2012 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the method for reliability analysis and forecasting. For IEC/TC 13 range for energy measurement and load control static electricity measuring equipment of all types. GB/T 17215.941-2012: Electricity metering equipment -- Dependability -- Part 41: Reliability prediction---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. ICS17.220.20 N22 National Standards of People's Republic of China GB/T 17215.941-2012/IEC 62059-41.2006 Electrical measuring equipment credibility Part 41. Reliability prediction Part 41. Reliabilityprediction (IEC 62059-41.2006, IDT) Issued on. 2013-06-01 2012-12-31 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released Table of ContentsPreface Ⅰ Introduction Ⅱ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 General Information 4 5 5 Reliability Analysis Method Parts Stress Method 6 5 Reliability Prediction 7 7 Other considerations credibility 8 to expiration of the service life of components 8 Appendix A (normative) Reliability Prediction - Scheme 9 Annex B (informative) Other reliability analysis and prediction methods Overview 10 References 13 GB/T 17215.941-2012/IEC 62059-41.2006ForewordGB/T 17215 series of standards is made up of several parts of the GB/T 17215 "electronic measuring equipment credibility" to be covered by the following Components. --- Part 11. General concepts (IEC /TR62059-11); --- Part 21. Field data collection instruments credibility (IEC /TR62059-21); The first part --- 31-1. temperature and humidity accelerated reliability test (IEC 62059-31-1); --- Part 32-1. accelerated endurance test (IEC 62059-32-1); --- Part 41. Reliability prediction (IEC 62059-41); --- Part 51. Software dependability (IEC 62059-51). This part is Part 41 GB/T 17215 in. Rules in this section in accordance with GB/T 1.1-2009 given draft. This section uses the translation method is equivalent to using IEC /TR62059-41.2006 "credibility electrical measuring equipment Part 41. Reliability Pre Test "(in English). For ease of use, this section made the following editorial changes. a) instead of as a decimal by decimal comma ",". ","; b) "IEC 62059 this section," the word changed to "this part of GB/T 17215 of"; c) Remove the IEC /TR62059-41.2006 Foreword. Please note that some of the content of this document may involve patent issuing authority of this document does not assume responsibility for the identification of these patents. This part is proposed by China Machinery Industry Federation. This part of the National Electrical Instrument Standardization Technical Committee (SAC/TC104) centralized. This section is drafted. Harbin Electrical Instrument Research Institute, Chongqing Electric Power Test & Research Institute, North China Electric Power Research Institute, Jiangsu Province Institute of Metrology, Shanghai EF Electronics Technology Co., Ltd., Shenzhen Clou Electronics Technology Co., Ltd. Holley Metering Unit Parts Limited, Hangzhou PAX Electronic Technology Co., Ltd., Xi'an flags Electronics Co., Ltd. Wei Sheng Group Co., Ltd., Chint Instrument has Limited liability company, Ningbo Sanxing Electric Co., Ltd., Jiangsu Caio million Hong Electronics Co., Ltd., Heilongjiang Province electrical instrumentation engineering technology Art Research Center Co., Ltd., Shenzhen Aerospace Electronics Co., Terry, Czech Republic. The main drafters of this section. Cheng Ho, Houxing Zhe, Zhang Lihua, Chenke Chang Sit Jin, Wang Huiwu, Shaofeng Yun, Zhou holes are, Leihui Bo, High technology fields, Chen Hongbo, Shengquan roots, Hu Ning, Zhou Zhongxiang, Li Xianhuai, Wang Sitong, Li Xiangfeng, Dao-liter, mangrove wish, Yao this ceremony, Xu Maolin, LI Jun-ming, Hung Yuan stretch, Li Yifei. GB/T 17215.941-2012/IEC 62059-41.2006IntroductionThis section contains GB/T 17215 series of standards related to electrical measuring devices credibility part of the problem. Its main purpose is to provide a About a reliability analysis and prediction methods overview, select and standardize the measuring device is used to calculate the predicted failure rate of component count. When the failure rate of the basic parameters of the forecast to know if the behavior of the instrument also know that the maintenance operator, the metering function metering end users Availability of energy can determine it. GB/T 17215.941-2012/IEC 62059-41.2006 Electrical measuring equipment credibility Part 41. Reliability prediction1 ScopeThis section GB/T 17215 requirements regarding reliability analysis and prediction methods applicable to electricity used in the IEC /TC13 range All types of measurement and load control static electricity measuring device.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated edition applies to this article Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 2900.13-2008 Electrotechnical terminology credibility and quality of service (IEC 60050 (191).1990, Amend.1.1999 AndAmend.2.2002, IDT) GB/T 17215.911-2011 credibility electrical measuring equipment - Part 11. General concepts (IEC /TR62059-11.2002, IDT) GB/T 17215.921-2012 Part 21 credibility electrical measuring equipment. the credibility of the data collection field instrument (IEC 62059-21.2002, IDT) IEC 61709.1996 reference conditions Electronic Component reliability failure rate and stress models (Electronic components-Reliability-Referenceconditionsforfailureratesandstressmodelsforconversion)3 Terms and DefinitionsThe following terms and definitions apply to this section. For ease of use, the following list is repeated in GB/T 2900.13-2008 some terms and definitions. Note. This is only a list of GB/T 17215.911 but not included with this topic-related terms. 3.1 Accelerated test acceleratedtest To shorten the observation period required for product stress response to stress response or enlarge the given time period, is applied over the reference conditions specified in the The stress level of a test. NOTE. For the validity of the results of accelerated tests do not change the basic failure modes and failure mechanisms, or primary and secondary relative relationship between them. [IEV-191-14-07] 3.2 Management delay (for calibration service) administrativedelay (forcorrectivemaintenance) Because of management without the implementation of the cumulative time correction service behavior of a defective product. [IEV-191-08-09] 3.3 Aging failure, loss failure ageingfailure, wearoutfailure The probability of failure increases with time, it is the result of processes inherent in the product. [IEV-191-04-09] GB/T 17215.941-2012/IEC 62059-41.2006 ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 17215.941-2012_English be delivered?Answer: Upon your order, we will start to translate GB/T 17215.941-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 17215.941-2012_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 17215.941-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |