GB/T 17215.311-2008 English PDFUS$459.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 17215.311-2008: Electricity metering equipment (a.c.) -- Particular Requirements -- Part 11: Electromechanical meter for active energy (classes0.5, 1and2) Status: Valid
Similar standardsGB/T 15284 GB/T 17215.321 GB/T 34067.2 GB/T 17215.301 GB/T 17215.302 GB/T 17215.303Basic dataStandard ID: GB/T 17215.311-2008 (GB/T17215.311-2008)Description (Translated English): Electricity metering equipment (a.c.) -- Particular Requirements -- Part 11: Electromechanical meter for active energy (classes0.5, 1and2) Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: N22 Classification of International Standard: 17.220.20 Word Count Estimation: 20,240 Date of Issue: 2008-06-30 Date of Implementation: 2009-01-01 Older Standard (superseded by this standard): GB/T 15283-1994 Quoted Standard: GB/T 3925-1983; GB/T 11150-2001; GB/T 17215.211-2006 Adopted Standard: IEC 62053-11-2003, MOD Regulation (derived from): Announcement of Newly Approved National Standards No. 11 of 2008 (No. 124 overall) Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard applies to newly manufactured for 50Hz or 60Hz AC active energy measurement network level is 0. 5, 1 and 2 of the electromechanical watthour meter and type testing. This section applies to the measuring element and one or more counters and housed in the same case within which consists of indoor and outdoor electromechanical energy meter, also applies to one or more work indicators and one or more test output. If the meter has a measuring element measuring more than one power, or when other functional elements, such as the maximum demand indicators, electronic tariff of degrees, time switches, ripple control receivers, data communication interfaces are also enclosed in the instrument case, of course, with these components have to apply the relevant standards, this standard applies to the metering section. GB/T 17215.311-2008: Electricity metering equipment (a.c.) -- Particular Requirements -- Part 11: Electromechanical meter for active energy (classes0.5, 1and2)---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Electricity metering equipment (ac) Particular Requirements Part 11. Electromechanical meter for active energy (classes0.5, 1and2) ICS 17.220.20 N22 National Standards of People's Republic of China Replacing GB/T 15283-1994 AC measuring equipment - Specific requirements Part 11. Electromechanical meters for active energy (0.5, 1 and 2) (IEC 62053-11.2003, MOD) Posted 2008-06-30 2009-01-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released Table of ContentsIntroduction Ⅲ Introduction Ⅳ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 standard power value 1 5 1 mechanical requirements 5.1 Overview 2 5.2 meter Indexer (register) 2 5.3 rotor rotation direction and mark 2 2 6 climatic conditions 2 7 Electrical requirements Power consumption 2 7.1 7.2 Short-term impact of the current 2 7.3 Influence of self heating 3 7.4 AC voltage test 3 8 accuracy requirements 4 8.1 Error current limit change amount changes caused 4 8.2 errors caused by other changes affect the amount of the limit 4 8.3 Starting and creeping test 5 8.4 meter constant 5 8.5 Accuracy test conditions of 5 8.6 Description of test results 7 9 7 Adjustment Pulse output devices Annex A (informative) electromechanical meter 9 A. 1 Scope 9 A. Division 2 9 A. 3 Technical requirements 9 A. 4 Test Method 12 Annex B (informative) Recommended test sequence table 14 Figure A. A pulse signal waveform 10 Table 1 voltage circuit power consumption 2 Table 2 Current circuit power consumption 3 Table 3 errors by the amount of change caused by short-time overcurrent 3 Changing the amount of error from Table 4 due to heat 3 Table 5 AC voltage test 4 Table 6 percentage error limits (single-phase meters and polyphase meter with balanced loads) 5 Table 7 percentage error limit (with a multiphase meter, line voltage applied load balancing single-phase multiphase voltage) 5 Table 8 Effect of the amount of 6 Table 9 starting current 7 Table 10 Voltage and current balance requirements 7 Table 11 Reference conditions 8 Table 12 Error zero line parallel movement limit 8 Table 13 lowest range adjustment 8 Table A. Error 1 means the instrument limit the impact of 11ForewordThe partial modification of the use of IEC 62053-11.2003 "electrical measuring equipment (AC) - Particular requirements Part 11. Electromechanical meters for active energy Table (0.5, 1 and 2) ", this part of the GB/T 17215.211-2006" AC measuring equipment General requirements, tests and test strips Member Part 11. Measuring Device "together constitute electromechanical energy meter type test requirements. This Part replaces GB/T 15283-1994. This section (including General requirements) and the main difference between GB/T 15283-1994 are as follows. --- Clear and standardized product name. electromechanical meter. --- Clear classification and the use of environmental requirements, increasing the test content. --- Increase the mechanical performance requirements. --- The assessment of the error range of direct access to the meter and access via the transformer meter (current) were prescribed. --- Consider China's actual situation and ease of use of a pulse output function electromechanical meter pulse in Appendix A Output means given requirements. This section in Appendix A and Appendix B is an informative annex. The recommended test sequence given in Appendix B. This part is proposed by China Machinery Industry Federation. This part of the National Electrical Instrument Standardization Technical Committee. This section is drafted. Harbin Electrical Instrument Research Institute, Zhejiang Chint Instrument Co., Ltd., State Grid Corporation of Shandong Electric Force Research Institute, Samsung Electronics Co., Ltd. Ningbo, Holley Instrument Corporation, Shenzhen Clou Electronics Technology Co., Ltd., Hangzhou, China Long Electronic Technology Co., Ltd. Changsha Weisheng, Delixi Group, Beijing Intelligent Instrument Co., Ltd. Gulf. The main drafters of this section. Linbing Hai, Xu Min, Leihui Bo, Wang Zhaohong, Han Dong, Li Xianhuai, Liling Sen, Xia Yali, Zhang Xianliang, Zhang Lihua. This part of the standard replaces the previous release case. --- Power (D) 28-1959; --- JB793-1966; --- JB793-1978; --- GB 3924-1983; --- GB/T 15283-1994.IntroductionMenu is also applicable to one or more work or more indicators and a test output. If the meter has a measuring element to measure one On power (multi-power meter), or when other functional elements, such as maximum demand indicators, electronic tariff counters and time switches, ripple control Receivers, data communication interfaces, etc. are enclosed in the meter case, of course, these elements have to apply the relevant standards, this standard applies only to Metering section. This section does not apply to. a) terminal voltage across more than 600V (polyphase meter of line to line voltage) of the instrument; b) Portable instruments; c) instrument counters and data interface. Acceptance inspection in accordance with GB/T 3925-1983 "2.0 grade AC power meter inspection method" (eqv IEC 60514. 1975) group given This policy. Reliability accordance with the contents of IEC 62059 "AC measuring equipment reliability" series of documents.2 Normative referencesThe following documents contain provisions which, through reference GB/T 17215 in this section constitute provisions of this section. For dated reference documents Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this section. GB/T 3925-1983 2.0 grade AC power meter inspection method (eqv IEC 60514. 1975) GB/T 11150-2001 energy meter testing device (neqIEC 60736. 1982) GB Part 11/T 17215.211-2006 AC measuring equipment General requirements, tests and test conditions. measuring equipment (IEC 62052-11.2003, IDT)3 Terms and DefinitionsGB/T 17215.211-2006 in Chapter 3 of the terms and definitions apply to this section.4 standard power valueThe provisions of GB/T 17215.211-2006 Chapter 4 values \u200b\u200bapply to this section.5 mechanical requirementsIn addition to the mechanical requirements of GB/T 17215.211-2006 in Chapter 5, the instrument shall meet the following requirements. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 17215.311-2008_English be delivered?Answer: Upon your order, we will start to translate GB/T 17215.311-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 17215.311-2008_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 17215.311-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |