GB 30079.3-2013 English PDFUS$579.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB 30079.3-2013: Safety specification for aluminium and aluminium alloys plates, sheets, strips and foils production -- Part 3: Cold rolling Status: Valid
Basic dataStandard ID: GB 30079.3-2013 (GB30079.3-2013)Description (Translated English): Safety specification for aluminium and aluminium alloys plates, sheets, strips and foils production -- Part 3: Cold rolling Sector / Industry: National Standard Classification of Chinese Standard: H09 Classification of International Standard: 13.100 Word Count Estimation: 25,239 Quoted Standard: GB 30078-2013; GB 30079.2-2013; AQ/T 9002-2006; Production Safety Law of People's Republic of China in 2002; People's Republic of China Fire Services Act 2008; People's Republic of China Occupational Diseases Act 2011 Regulation (derived from): National Standards Bulletin No. 25 of 2013 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the aluminum and aluminum alloy cold rolled sheet, strip, foil production of basic safety requirements, safety requirements of the job production equipment, facilities, emergency plans and emergency measures. This standard applies GB 30079.3-2013: Safety specification for aluminium and aluminium alloys plates, sheets, strips and foils production -- Part 3: Cold rolling---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Safety specification for aluminium and aluminium alloys plates, sheets, strips and foils production.Part 3. Cold rolling ICS 13.100 H09 National Standards of People's Republic of China Aluminum and aluminum alloy sheet, strip, foil production safety norms Part 3. Cold rolled plates, sheets, stripsandfoilsproduction-Part 3. Coldroling Issued on. 2013-12-17 2014-11-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released ForewordGB 30079 Part 4 of Chapter 5, Chapter 6, are mandatory, the rest are recommended. GB 30079 "aluminum and aluminum alloy sheet, strip, foil production safety norms" is divided into three parts. --- Part 1. Casting; --- Part 2. Hot; --- Part 3. cold rolling. This is Part 3 GB 30079's. This section drafted in accordance with GB/T 1.1-2009 given rules. This part is proposed by the State Administration of Work Safety. This part of the National Production Standardization Technical Committee on Security (SAC/TC288) national non-ferrous metals Standardization Technical Committee (SAC/TC243) centralized. This section is drafted. Southwest Aluminum (Group) Co., Ltd., China Nonferrous Metals Industry Institute of Standards Metrology and Quality, Northeast Light Alloy Co., Ltd. Xiashun aluminum foil, aluminum Ruimin Co., Ltd. The main drafters of this section. Chenshou Hui, Lee Shui-shan, Zhang Lihua, PAPTY, Chen Siren, Zhu days, Lin Yaoguang, Wang, Guo Yiqing, Li Wenbo, Ti Liu, Deng Xiaohua, the former win, a long pass Wei, Hou. Aluminum and aluminum alloy sheet, strip, foil production safety norms Part 3. Cold rolled1 ScopeGB This section 30079 specifies the basic safety requirements for aluminum and aluminum alloy cold-rolled sheet, strip, foil production, safety equipment, facilities Full operational requirements, emergency response plans and emergency measures. This section applies to aluminum and aluminum alloy cold-rolled sheet, strip, foil production safety.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB 30078-2013 deformable aluminum and aluminum alloy ingot production safety norms GB 30079.2-2013 aluminum and aluminum alloy sheet, strip, foil production safety specifications - Part 2. Hot AQ/T 9002-2006 production and business units of production safety accident emergency response plan guidelines Production Safety Law of People's Republic of China (June 29, 2002 announcement) Fire Control Law of People's Republic of China (October 28, 2008 announcement) People's Republic of China Occupational Disease Prevention Law (published December 31, 2011)3 Terms and DefinitionsTerms and definitions defined in GB 30078-2013 apply to this document.4 Basic Safety Requirements4.1 Enterprises should develop hazard identification refer to this section in Appendix A, risk assessment and risk control survey. 4.2 mill before starting, make sure that fire extinguishing system is normal. 4.3 scrap coiling, are not allowed to stand on its fence, does not permit the passage of traction scrap. 4.4 When the unwinding roll strip cut bundles, the operator should stand on the side of the shear volume of billet steel. Threading cited material shall be used special tools. 4.5 Qing roll, you should use a special tool, the operator should stand in the opposite direction roller cleaning operation, low running machine column, console should keep people guardianship. 4.6 Other basic safety requirements should be consistent with the provisions of Chapter 4 GB 30078-2013 GB 30079.2-2013 Chapter 4.5 job security equipment and facilities requirements5.1 Cold Rolling Mill 5.1.1 before rolling should be cracking roll end face side, bumps inspection, according to the split side, bumps situation to take appropriate measures to prevent the broken belt fire. 5.1.2 should roll on roll confirm the correct position to prevent overturning. 5.1.3 Folder sprues taken after shearing, should prevent hand injury. 5.1.4 clean up debris, and burrs, use special tools. 5.1.5 Mill normal cutting, trimming area is not permitted to stand on. 5.1.6 gage runtime, not allowed near the gage emission hole should be kept a safe distance. 5.1.7 rolling, it was not allowed to move into the active region within the stent. 5.1.8 unloading, are not allowed to stand on the activities of the mobile cover job. 5.1.9 to have hidden sheet feed head pop up, before artificial bundle volumes should be expected to suppress the head, open wrapper, a roll after the interlock switch into before Line bundle volume. 5.1.10 When loading sleeve, you should stand in a safe place, to prevent the sleeve roll wounding. 5.1.11 clear roll, the thickness should be closed, people should stand on the delivery side of the roll, use special tools or special equipment clearing roller, console keep people guardianship. 5.1.12 mill fume hood Fire hydrants should be checked regularly. 5.2 Foil Mill 5.2.1 threading, using special tools should lead material. 5.2.2 Maintenance foil before breaking knife, locking should take effective measures. 5.2.3 should be consistent with the provisions of 5.1. 5.3 Tank Ultra-volume oil tank is not permitted, the box should be installed ground wire. 5.4 mill basement 5.4.1 Mill basement shall be provided with clear signs of emergency escape routes, emergency exit signs, the mill basement exits is prohibited Occupied or blocked. 5.4.2 basement should maintain good ventilation. 5.4.3 mill overhaul, which takes carbon dioxide into the protected area should be carbon dioxide fire extinguishing system, switching to manual mode. 5.4.4 rolling out of the basement, there should be safety measures. 5.4.5 grounding resistance should be tested periodically depot pipeline. 5.4.6 does not permit the oil into the trench, should be cleared of waste oil. 5.5 panel filter 5.5.1 plate filter should be provided with overpressure alarms, explosion-proof electrical equipment should be taken to deal with, the agitator should be installed at a fall protection device. 5.5.2 Replacing the filter paper should be depressurized after the shutdown performed. 5.5.3 overpressure pressure pipe is not permitted to run. 5.5.4 Plate filter drip pan should be cleared up. 5.6 co-reeler 5.6.1 feeding the car moves, the car is not allowed to enter the feeding operation zone. 5.6.2 wear material should be slow, not allowed to put his hand into the driving roller and the tension between the rollers, trimming knife hand contact is not permitted. 5.6.3 loading or unloading operation, the operator shall trace and observe the operation of the whole process. After the run is completed, before leaving. 5.6.4 equipment operation, are not allowed to touch the surface of the aluminum foil and the edges are not allowed to cross from the unwinding foil and the lower part of the machine running the column. 5.6.5 After the operator confirms the arbor area no other personnel before operating the tool axis operation. 5.6.6 together around a fire winder job, are not allowed to start doublet pump. 5.6.7 combined roll over, or I need to exit the sleeve material, the sleeve should be observed in symmetrical positions on whether to support or unloading trucks skip arm is raised, if not Symmetry, should immediately stop operation, to prevent the sleeve wounding. 5.6.8 at the time of inspection and cleaning guide rollers, the staff should work in the opposite direction of rotation of the guide rollers. 5.7 Heat Treatment Equipment 5.7.1 bath quenching furnace GB 30079.2-2013 executed according to the provisions in 5.9.1. 5.7.2 annealing furnace, aging furnace 5.7.2.1 When put aluminum foil on the oven loading platform or vehicle equipped with an aluminum foil roll feeder, you should put a positive stable place to prevent falling. 5.7.2.2 annealing furnace, aging furnace operations other security requirements to perform in accordance with the provisions GB 30079.2-2013 5.10. 5.7.3 air quenching, annealing machine column 5.7.3.1 When cutting thick head, do not permit the hand pull the first material, the use of special tools should lead material. 5.7.3.2 When trimming jobs, not allowed to hand pull or scrap feeding, only use special tools. 5.7.3.3 When stitching, does not allow the head, the hand into the sewing machine. 5.7.3.4 broken side conveyor runs, are not allowed to clean up debris. 5.7.3.5 feed at run time, not allowed to touch the plate or remove scrap metal or other foreign objects. 5.7.3.6 When feeding, do not permit the flammable and explosive materials into the furnace. 5.7.3.7 furnace during operation, do not allow over-temperature heating operation. 5.7.3.8 work should check the operation of the furnace tour furnace, cooling water, circulating fan, electronic control equipment and safety interlock device. for Gas furnace, you should also check the district burner combustion. 5.7.3.9 When winding, coiling does not allow personnel to enter the site and guides the audience. 5.7.3.10 cleaning hot tub, the water temperature should be controlled at room temperature, ventilation should be prepared to work to prevent suffocation. 5.7.3.11 wipe squeeze water roller, tension roller, roller when cited, should be shut down, the console should keep people care. 5.7.3.12 production line in the opposite direction when the need polishing rolls should be entered in the strip between the rolls when operated under. 5.7.3.13 cleanup roll straightening machine should be listed without board running or stopping state belt, console should keep people care. 5.7.4 Vacuum annealing furnace 5.7.4.1 each installed furnace, and the furnace blower should be opening, the cooling chamber aluminum shavings and dirt removed. 5.7.4.2 feed, baked before, you should check the furnace charging car track and the track is connected, and does not permit the rim pressed on track. 5.7.4.3 annealing process, should always check whether the instrument is sensitive, accurate, avoid running temperature and over-temperature, damage to the annealing furnace. 5.7.4.4 When the protective gas charge should be slowly inflated, does not permit the rapid gas into a vacuum furnace. 5.7.4.5 inflated, the operator can not stand or stand facing the door rebound direction of the door, so as not to cause a sudden increase in pressure inside the furnace door Rebound. 5.7.4.6 When using vaporization bottle, wear protective gloves to prevent frostbite. 5.7.4.7 not allow random touching the cylinder valve and safety devices before use, check the seals of the valves, a leak is detected, it shall promptly deal with. After 5.7.4.8 Use carburetor, should be promptly booster valve is closed. 5.7.4.9 is not permitted to replace the booster pump oil when the device is running or high vacuum pump oil. 5.8 finisher column 5.8.1 Length Machine 5.8.1.1 When unwinding, you should put the pressure roller, after cutting steel, not being permitted to feed head cut strip. When cited material should be used special tools. 5.8.1.2 When straightening, do not allow foreign matter to clean hands on the sheet, do not allow ultra straightening equipment specifications. 5.8.1.3 Strip blocked by the shears should be used when handling special tools. 5.8.1.4 When trimming jobs, not allowed to hand pull or scrap feeding, only use special tools. When 5.8.1.5 Aluminium deviation should stop processing. 5.8.1.6 The residual material before artificial bundle volume, it should first put down the pressure roller pressed aluminum coil unloading car will rise against the aluminum sheet head, open roll, wrapper After the device, unloading car, lock switch support activities, party permission of staff to the winding of the bundle volume. 5.8.1.7 clear roll, you should use a special tool, people standing in the opposite direction roller runs clean and let the leveler low reverse, console should keep people guardianship. 5.8.1.8 check scissors, wipe clean lubricating oil, it should stop, adjustment and replacement of cutting edge, you should cut off the power. 5.8.2 slitting machine 5.8.2.1 When the car is running, the lid is not permitted to stand on. 5.8.2.2 feed roller is rotated, not allowed to touch. 5.8.2.3 When unwinding cited material, use special tools feed. 5.8.2.4 When Looper column (pit) operations, should take security measures. 5.8.2.5 clear when rolls should stand roller reverse direction were not allowed to bring clean sheet roll. 5.8.2.6 column machine is running, the sleeve is not permitted to stand on the recovery tank. 5.8.3 rewinding machine column 5.8.3.1 expected after a small car, do not allow people to stay in the reel below. 5.8.3.2 When the lead material, are not allowed to stand between the reel and the blade unwinding, not allowed to touch the rotating feed roll. 5.8.3.3 When unloading, are not allowed to stand on the cover and coil car unloaded, are not allowed to stand in the second arm rotary table movement range. 5.8.3.4 clear rolls, the roll should be lifted and placed beneath the roller bearing plate, roll down automatically to prevent the hydraulic pressure is low, console Should keep people care, people should stand in the opposite direction and clear the running roller roll, are not allowed with clear sheet roll. 5.8.4 roller leveler Shall comply with the provisions in 5.11.1 of GB 30079.2-2013. 5.8.5 straightening machine 5.8.5.1 When unwinding, you should put the pinch roller, after cutting steel, not being permitted to feed head cut strip. 5.8.5.2 When the lead material, use special tools feed. 5.8.5.3 When straightening, special tools should be used to clean up foreign matter on the sheet. 5.8.5.4 Strip blocked by the shears should be used when handling special tools. 5.8.5.5 When trimming jobs, not allowed to hand pull or scrap feeding, only use special tools. When 5.8.5.6 Aluminium deviation should stop processing. After 5.8.5.7 scrap winder start, not allowed to stand on its fence. It does not permit the passage of traction scrap. 5.8.5.8 bundle before artificial volumes should first roll down pressed aluminum coil unloading car will rise against the aluminum sheet head, open roll, wrapper and unscrewer Volume car, the activities supported by the lock switch after the party to permit an officer to the winding down of the bundle volume. 5.8.6 Foil Slitter column 5.8.6.1 confirm the direction of the obstacle-free, before starting the transporter. 5.8.6.2 After the cone has been confirmed and the clamping sleeve before starting uncoiler. 5.8.6.3 Handling, adjust the tool, the tool should prevent injuries. 5.8.6.4 lacing should be slow, not allowed to hand in contact with the blade, to prevent injury, while preventing the guide rollers pinch. 5.8.6.5 When the winding machine operation, do not allow contact with parts of the body parts of the running guide rollers, chains, belts, and other gear. 5.8.6.6 When automatic unloading, are not allowed to walk into the inner rail car unloading area or route. Semi-automatic unloading, unloading area should be protected material Volume wounding. 5.8.6.7 cleanup should guide rollers, suction tube parking equipment, and someone custody. 5.8.6.8 After the stop, do not allow hand, foot brake the rotation of the guide rollers. 5.8.7 shears thick, thin shears 5.8.7.1 when adjustment or replacement of the tool, do not allow contact with the blade to prevent cuts. 5.8.7.2 using a small car or unloading material from the cone, the sleeve should observe whether the support arm is raised in a symmetrical position of the car, if fall risk Insurance, should stop processing. 5.8.7.3 before running arbor, arbor to deal with safe operating area to confirm. 5.8.7.4 When wearing materials, are not allowed into the drive rolls and put his hand between the tensioning rollers. Unloading aluminum foil or reel 5.8.7.5, the two should complement each other, is placed securely. 5.8.7.6 operation pull shaft seat, do not permit the hand near the clamping head; Discover Card is not tight or unstable operation should be stopped. 5.8.7.7 When the equipment operation, the operator is not allowed to leave; high-speed operation, are not allowed to touch foil edges and surfaces. 5.8.7.8 Each function when the car is running, do not allow people on the line running through, do not allow people to pause on the line to run the job. 5.8.7.9 When wiping roller or clear foreign material on the aluminum plate, you should use special tools. 5.8.8 trimming unit 5.8.8.1 Shear, scrap waste material guiding channel blockage occurs, you should stop, should cover Removal after treatment. 5.8.8.2 outer uncoiler and coiler supported on the volume, the next volume, the operator should stand outside the safety fence. When 5.8.8.3 scrap winding work, workers should control the hydraulic valve scrap coiling station closed. 5.8.8.4 When static electricity Oiler work, do not permit the door open, the need to deal with the problem after the work is completed, should be tested only after the static-free enter. 5.8.9 calender Shall comply with the provisions in 5.11.2 GB 30079.2-2013. 5.8.10 stretcher Shall comply with the provisions in 5.11.3 of GB 30079.2-2013. 5.8.11 sheet cleaning machine Shall comply with the provisions in 5.11.5 of GB 30079.2-2013. 5.8.12 polishing laminating machine Shall comply with the provisions in 5.11.6 of GB 30079.2-2013. 5.9 Column packing machine 5.9.1 oiled packaging machine Shall comply with the provisions in 5.12.1 of GB 30079.2-2013. 5.9.2 oiled machine rolls Shall comply with the provisions in 5.12.2 GB 30079.2-2013. 5.9.3 aluminum coil packing machine column Process 5.9.3.1 column packing machine is running, it is not allowed to stand on the transport mechanism and the moving mechanism. 5.9.3.2 not allow Stepping overloaded transport, transport operation, the personnel should leave nothing to transport. 5.9.3.3 presses when wrapped around your work, close the protective door. 5.9.3.4 When the volume delivered to the saddle aluminum roller table, insert the cardboard, should prevent pinching hands. 5.9.3.5 reversing machine work, are not allowed across the device. 5.9.4 Artificial packaging Shall comply with the provisions in 5.12.3 of GB 30079.2-2013. 5.10 Waste balers 5.10.1 waste packaging, are not allowed within the package containing glass, water and foreign matter such as lighters. 5.10.2 lid when pressed, are not allowed to feed the bin. 5.10.3 baler operation, do not allow their feet pedaling waste. Baler operating region, spout and waste pits are not allowed to stand on. 5.10.4 cover is stuck, do not permit the use of lifting equipment to force open. 5.10.5 Cleanup baler bin of waste material should cover safety leash plug. 5.11 bay storage 5.11.1 stacker operation, shall take the necessary measures to ensure that no one in the high-bay warehouse. 5.11.2 When a fault occurs within the high-bay warehouse, need to enter the high-bay warehouse, it shall take the necessary measures to prevent others from starting stack Stack machine. 5.12 grinder 5.12.1 When the roll grinding is not allowed to touch dangerou......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB 30079.3-2013_English be delivered?Answer: Upon your order, we will start to translate GB 30079.3-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB 30079.3-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB 30079.3-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |