GA 1290-2016 English PDF
Basic dataStandard ID: GA 1290-2016 (GA1290-2016)Description (Translated English): Rules for examination of building fire safety design Sector / Industry: Public Security (Police) Industry Standard Classification of Chinese Standard: C82 Classification of International Standard: 13.220.20 Word Count Estimation: 24,234 Date of Issue: 2016-04-08 Date of Implementation: 2016-07-08 Quoted Standard: GB/T 5907.1; GB/T 5907.2; GB/T 5907.3; GB/T 5907.4; GB/T 5907.5; GB 50016; GB 50084; GB 50116; GB 50222; GB 50974 Issuing agency(ies): Ministry of Public Security Summary: This standard stipulates the terminology and definition, general requirements, content of examination, judgment of results and archives management of the fire protection design review of construction projects. This standard is applicable to fire protection design auditing and record inspection of construction projects such as new construction, expansion and alteration (including indoor and outdoor decoration, building insulation and change of use) according to law; fire prevention design unit self-examination, construction drawing examination institution Fire design documents technical review, can refer to the implementation. GA 1290-2016: Rules for examination of building fire safety design---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Rules for examination of building fire safety design ICS 13.220.20 C82 People 's Republic of China Public Security Industry Standard Rules for the design of fire protection design for construction projects 2016-04-08 release 2016-07-08 implementation Issued by the Ministry of Public Security of the People 's Republic of China Directory Preface I Introduction II 1 Scope 1 2 normative reference document 1 3 Terms and definitions 1 4 General requirements 2 5 review content 2 6 result judgment 3 Archives Management 4 Appendix A (Normative Appendix) Record Form 5 Appendix B (Normative Appendix) Construction Project Fire Protection Design Document Review Points 10 References 19 ForewordChapter 4,5,6 of this standard is mandatory and the rest is recommended. This standard is drafted in accordance with the rules given in GB/T 1.1-2009. This standard is proposed by the Ministry of Public Security Fire Department. This standard is owned by the National Fire Safety Standardization Technical Committee (SAC/TC113/SC9). This standard is responsible for drafting units. Ministry of Public Security Fire Department. This standard involved in the drafting unit. the Ministry of Public Security Tianjin Fire Research Institute, the Guangdong Provincial Public Security Fire Corps, Sichuan Province Public Security Fire Corps. The main drafters of this standard. Qi Yanchun, Liu Jiyang, Li Yanjun, Han Zizhong, Wu Hejun, Ni Zhaopeng, Xue Yaqun, Li Yue, Yang Qing, Wang Xin, Yang Dong, Huang Tao.IntroductionConstruction project fire design review is an important responsibility given by the law to the public security organs of fire agencies is to prevent the formation of congenital fire hidden To ensure that the construction of fire safety measures important. To standardize the construction project fire design review behavior, to ensure the quality of the review work, according to the existing fire laws and regulations and national construction Anti-technical standards, the development of this standard. Rules for the design of fire protection design for construction projects1 ScopeThis standard specifies the terms and definitions of fire engineering design review for construction projects, general requirements, review contents, results judgments and archives And so on. This standard applies to the public security organs of fire agencies in accordance with the law on the new, expansion, alteration (including indoor and outdoor decoration, building insulation, use change) Set fire control design audit and record inspection; fire design unit self-examination, construction drawings review the implementation of the fire design documents technical review Check, can refer to the implementation.2 normative reference documentsThe following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article Pieces. For undated references, the latest edition (including all modifications) applies to this document. GB/T 5907 (all parts) Fire words Code for fire protection of building design GB 50016 Code for design of automatic sprinkler system GB 50084 Code for design of automatic fire alarm system GB 50116 Code for fire protection in interior decoration design of buildings GB 50222 Technical specification for fire water supply and fire hydrant system GB 509743 terms and definitionsGB/T 5907, GB 50016, GB 50084, GB 50116, GB 50222, GB 50974 Definitions and definitions of the following terms and definitions For use in this document. 3.1 Construction project fire design review examination ofbuildingfiresafetydesign Mainly including the construction project fire design audit and construction project fire design record inspection, can also include fire design units since the review, Shi Technical review of fire protection design documents for construction drawings. 3.1.1 Construction project fire design audit auditing ofbuildingfiresafetydesign According to fire laws and regulations and national engineering construction fire technical standards, according to the law to apply for fire administrative license construction projects related to Materials and fire design documents, to review, assess and make an administrative licensing decision process. 3.1.2 Construction project firefighting design record inspection inspection ofbuildingfiresafetydesignfiledforrecord According to the fire laws and regulations and national engineering construction fire technical standards, the record for the inspection of the object to determine the construction of the phase Customs information and fire design documents, to review, assess and make a review of the process. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GA 1290-2016_English be delivered?Answer: Upon your order, we will start to translate GA 1290-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically in 9 seconds (download/delivered in 9 seconds). The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GA 1290-2016_English with my colleagues?Answer: Yes. The purchased PDF of GA 1290-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |