DL/T 634.56-2010 English PDF

US$374.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
DL/T 634.56-2010: Telecontrol equipment and system. Part 5-6: Guidelines for conformance testing for the IEC 60870-5 companion standards
Status: Valid

DL/T 634.56: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
DL/T 634.56-2010374 Add to Cart 3 days Telecontrol equipment and system. Part 5-6: Guidelines for conformance testing for the IEC 60870-5 companion standards Valid
DL/T 634.56-2004RFQ ASK 3 days Telecontrol equipment and systems Part 5-6: Test procedures for IEC 60870-5 protocols series

Similar standards

GB/T 33605   GB/T 33593   DL/T 437   DL/T 634.5101   DL/T 634.5601   DL/T 634.5104   

Basic data

Standard ID: DL/T 634.56-2010 (DL/T634.56-2010)
Description (Translated English): Telecontrol equipment and system. Part 5-6: Guidelines for conformance testing for the IEC 60870-5 companion standards
Sector / Industry: Electricity & Power Industry Standard (Recommended)
Classification of Chinese Standard: F21
Classification of International Standard: 27.100
Word Count Estimation: 20,243
Date of Issue: 2010-05-24
Date of Implementation: 2010-10-01
Older Standard (superseded by this standard): DL/Z 634.56-2004
Quoted Standard: GB/T 18657.1-2002; GB/T 18657.2-2002; GB/T 18657.3-2002; GB/T 18657.4-2002; GB/T 18657.5-2002; ISO/IEC 9646-1; ISO/IEC 9646-2; ISO/IEC 9646-3; ISO/IEC 9646-4; ISO/IEC 9646-5; ISO/IEC 9646-6; ISO/IEC 9646-7
Adopted Standard: IEC 60870-5-6-2006, IDT
Regulation (derived from): National Energy Board Notice 2010 No. 1; industry standard filing Notice 2010 No. 7 (Total 127)
Issuing agency(ies): National Energy Administration
Summary: This standard specifies the remote equipment, substation automation systems and remote systems (including SCADA pre- function) conformance testing methods. This part of the test protocol by providing a standard way to make interoperability more convenient, but does not guarantee interoperability of equipment. Used during the test methods provided in this section will reduce the risk of non- interoperability. The purpose of this section is to be able to EEC 60870-5 companion standards give clear and standard protocol evaluation. This section describes the test environment and conditions for guidance. Each matching criteria detailed test cases, each of the basic application functions include mandatory and optional test cases, ASDU and transport processes will provide technical specification IEC 60870-5-60 ��. Other functional test cases beyond the scope of this part. This section mainly deals with communication conformance testing, it does not include other requirements such as security or the IOC. These requirements are specified by the other applicable standards and in accordance with those standards for testing.
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of DL/T 634.56-2010_English be delivered?

Answer: Upon your order, we will start to translate DL/T 634.56-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of DL/T 634.56-2010_English with my colleagues?

Answer: Yes. The purchased PDF of DL/T 634.56-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version DL/T 634.56-2010?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version DL/T 634.56-2010 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.