Path:
Home >
MISC >
Page53 > DBT93.2-2022
Price & Delivery
US$369.00 · In stock · Download in 9 secondsDBT93.2-2022: Active fault survey--Requirements of achievement reports - Part 2: General reports
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See
step-by-step procedureStatus: Valid
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| DB/T 93.2-2022 | English | 369 |
Add to Cart
|
4 days [Need to translate]
|
Active fault survey--Requirements of achievement reports - Part 2: General reports
|
Click to Preview a similar PDF
Basic data
| Standard ID | DB/T 93.2-2022 (DB/T93.2-2022) |
| Description (Translated English) | Active fault survey--Requirements of achievement reports - Part 2: General reports |
| Sector / Industry | Chinese Industry Standard (Recommended) |
| Classification of Chinese Standard | P15 |
| Classification of International Standard | 91.120.25 |
| Word Count Estimation | 16,125 |
| Date of Issue | 2022-12-29 |
| Date of Implementation | 2023-05-01 |
| Issuing agency(ies) | China Earthquake Administration |
DBT93.2-2022: Active fault survey--Requirements of achievement reports - Part 2: General reports
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 91:120:25
CCSP15
Seismic Industry Standard of the People's Republic of China
Compilation rules for reports on active fault detection results
Part 2: Project General Report
Part 2:Generalreports
Released on 2022-12-29
2023-05-01 Implementation
Released by the China Earthquake Administration
table of contents
Preface I
Introduction II
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 General 1
5 Project Completion Report 1
6 Project Technical Report 3
7 Brief version of project results 9
Reference 11
foreword
This document is in accordance with the provisions of GB/T 1:1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules for Standardization Documents"
drafting:
This document is part 2 of DB/T 93 "Rules for Compilation of Active Fault Exploration Results Report": DB/T 93 has issued the following
part:
--- Part 1: Basic provisions;
--- Part 2: General project report:
This document is proposed by the China Earthquake Administration:
This document is under the jurisdiction of the Earthquake Disaster Prevention Standardization Technical Committee:
This document was drafted by: Jiangsu Earthquake Administration, China Earthquake Disaster Prevention Center, Ningxia Hui Autonomous Region Earthquake Administration, Fujian Earthquake Administration,
Institute of Earthquake Prediction, China Earthquake Administration, National Academy of Natural Disaster Prevention and Control, Ministry of Emergency Management, Institute of Geology, China Earthquake Administration, Beijing Transportation
University, Geophysical Exploration Center of China Earthquake Administration:
The main drafters of this document: Xu Xu, Li Yishi, Xu Hangang, Li Limei, Chai Chizhang, Liu Jianda, Tian Qinjian, Zhang Shimin, Yu Guihua,
Zhao Boming, Lu Haiyan, Liu Baojin, Yang Xiaoping, Zhang Jingfa, Feng Shaoying, Qin Jingjing, Wang Yin, Wang Fan, Fang Yi, Wang Xiu:
Introduction
A large number of earthquake cases at home and abroad show that active faults are the source of earthquake disasters: Identify the distribution of active faults and their properties and seismic hazards
It is the basic work of earthquake prevention and disaster reduction to make an evaluation of the nature of the disaster: Since the "Ninth Five-Year Plan" period, my country has gradually promoted the detection of active faults:
More than 130 active fault mappings have been completed, and active fault detection has been carried out in more than 100 cities:
Site exploration and fault avoidance of buildings (structures), earthquake disaster risk assessment and earthquake prediction are playing an increasingly important role:
In order to standardize the application of technical methods, ensure the scientific and orderly development of active fault detection work, and improve the quality and practicality of output results:
In recent years, the Seismic Department has carried out practical cases of active fault detection, clarifying the work process, work content, technical methods and work results:
On this basis, a series of standard frameworks were constructed, and GB/T 36072-2018 "Active Fault Detection" and "Active Fault Detection" were formulated successively:
Its supporting series of standards, but so far no relevant standards have been formulated for the requirements of output and expression: Currently, active fault exploration
Reports of test results vary in form, content and structure, and vary in complexity: The lack of relevant standards has brought great harm to the acceptance of projects and the promotion and application of achievements:
To influence and restrict the healthy development of active fault detection work:
DB/T 93 "Rules for Compiling Active Fault Exploration Results Report" is precisely to overcome the lack of rules, projects and topics in the preparation of results reports
It is formulated for the unclear technical points of acceptance: DB/T 93 is proposed to be composed of three parts:
--- Part 1: Basic provisions: Establish the basic rules and requirements for the form and logic of active fault detection results report preparation:
Provides general rules and requirements for Parts 2 and 3:
--- Part 2: General project report: It specifies the contents of the completion report, technical report, and abbreviated results of the active fault detection project and their
Hierarchical framework: Part 2 is used in conjunction with part 1:
--- Part 3: Special work report: The content and hierarchical structure framework of each special work report of the active fault detection project are stipulated:
Part 3 is used in conjunction with Part 1:
This part of DB/T 93 is based on the actual situation of compiling reports on active fault detection results in my country over the years, and with reference to other
Compiled according to relevant industry standards: This part strives to be in the framework of the project completion report, project technical report and project results abbreviation
The basic requirements are given in terms of structure and content composition to provide guarantee for the professionalism, systematization and popularization of the results report, so as to promote the exploration of active faults:
The monitoring work is carried out in an orderly manner, and the disaster reduction efficiency and scientific value of the output results are improved:
Rules for compiling reports on active fault exploration results
Part 2: Project General Report
1 Scope
This document stipulates the framework structure and necessary content for the completion report, project technical report and short version of project results of the active fault detection project:
Content and basic formatting requirements:
This document is applicable to the preparation of the achievement report and the technical review of the achievement report of active fault detection and seismic hazard assessment:
2 Normative references
The contents of the following documents constitute the essential provisions of this document through normative references in the text: Among them, dated references
For documents, only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to
this document:
GB 17741 Seismic Safety Evaluation of Engineering Sites
GB/T 18207 (all parts) Terminology for Earthquake Prevention and Disaster Mitigation
GB/T 36072 active fault detection
DB/T 93:1-2022 Active fault exploration results report compilation rules Part 1: Basic provisions
3 Terms and Definitions
The following terms and definitions are defined in GB/T 18207 (all parts), GB/T 36072, GB 17741 and DB/T 93:1-2022
terms apply to this document:
4 General
4:1 The general project report is divided into project completion report, project technical report and abbreviated project results:
4:2 This document should be used in conjunction with DB/T 93:1-2022: Regarding the project completion report, project technical report, and abbreviated project results
Provisions on language, text, diagrams, tables, formulas, types and bindings, as well as report structure and attributes of constituent elements, etc:, are stipulated by DB/T 93:1-2022
give:
5 Project Completion Report
5:1 Properties
Completion report of active fault detection project is a written report on project organization, implementation and completion:
5:2 Front section
The front part of the project completion report shall be included:
a) Cover: The constituent elements include all the content specified in 6:2:1 of DB/T 93:1-2022, where the report name consists of the full name of the project
...