HOME   Cart(0)   Quotation   About-Us Tax PDFs Standard-List Powered by Google www.ChineseStandard.net Database: 189760 (26 Jul 2025)

TB/T 2897-1998 PDF English

US$120.00 · In stock · Download in 9 seconds
TB/T 2897-1998: Sub-ballast on railway gravel ballast bed
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status:  
Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
TB/T 2897-1998English120 Add to Cart 0-9 seconds. Auto-delivery Sub-ballast on railway gravel ballast bed  

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: TB/T 2897-1998                   
      


Similar standards

TB/T 2140.2   TB/T 2328.5   TB/T 3568.2   

TB/T 2897-1998: Sub-ballast on railway gravel ballast bed

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/TBT2897-1998
TB PROFESSIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA Sub-ballast for ballast bed of railways Issued on: FEBRUARY 24, 1998 Implemented on: SEPTEMBER 1, 1998 Issued by. Ministry of Railways of the People’s Republic of China

Table of Contents

Foreword ... 3 1 Scope ... 4 2 References ... 4 3 Terms ... 4 4 Technical requirements ... 4 5 Inspection rules ... 6 6 Transportation, storage ... 8

Foreword

Sub-ballast is an important part of the ballast bed of railways and is located between the ballast layer of the ballast bed and the surface layer of the subgrade bed. It plays the role of transmitting and distributing the train loads, preventing mutual penetration of top-ballast and surface layer particles of subgrade bed, water seepage transition and antifreeze-and-insulation. In the past, China borrowed the experience of using river sands as sub-ballast from the former Soviet Union. Since there is no material standard, the above-mentioned functions of the sub-ballast cannot be guaranteed and the material source of the sub-ballast is limited. On the basis of reference to the relevant standards such as the sub-ballast material standards of the United States Railway Engineering Association (AREA), Japan railway subgrade bed surface layer (JISA5001 particle size transitional gravel layer) material standards, combining China's national conditions and railway situation, this Standard is developed. This Standard is proposed by Railway Engineering Research Institute of China Academy of Railway Sciences. This Standard is under the jurisdiction of Institute of Standard Metrology of National Railway Administration of the People’s Republic of China. Railway Engineering Research Institute of China Academy of Railway Sciences is responsible for the drafting of this Standard. Main drafters of this Standard. Zeng Shugu, Zhang Wensheng, Xu Yongxian, Wang Hong, Liu Zengjie. Sub-ballast for ballast bed of railways

1 Scope

This Standard specifies the technical requirements, inspection rules and transportation, storage of sub-ballast for ballast bed of railways (hereinafter referred to as sub-ballast). This Standard applies to national railways; local railways and industrial enterprise railways may also refer to this Standard.

2 References

The following standards contain provisions which, through reference in this text, constitute provisions of this standard. At time of publication, the editions indicated were valid. All standards are subject to revision, and parties to agreements based on this standard are encouraged to investigate the possibility of applying the most recent editions of the standards indicated below. TB/T 2140-90 Railway ballast TB/T 2328.1~18-92 Test method for railway ballast

3 Terms

The plasticity index Ip. the plasticity index is equal to the difference between the liquid limit LL and the plastic limit PL. Ip = LL - PL

4 Technical requirements

4.1 Sub-ballast material may be taken from natural gravel material, or may be taken from rocks or natural pebbles, gravels by crushing, screening. 4.2 Sub-ballast material’s particle size grading shall comply with the provisions of Table 1, and the particle content of fine aggregate below 0.5 mm sieve that pass through the 0.075 mm sieve shall be less than or equal to 66 %. The matching of the particle size grading of sub-ballast material with the particle size grading of the ballast layer in the ballast bed and the surface layer of the subgrade bed is shown in Figure1. 4.4.4 The mass percentage of clay and other impurities is less than or equal to 0.5 %.

5 Inspection rules

Sub-ballast material shall be subjected to type inspection and production inspection. The type inspection is a ministerial level, and the production inspection is a bureau level. 5.1 Type inspection 5.1.1 When establishing the sub-ballast material mining and processing base, the particle size grading and material property inspection of the finished product shall be carried out by the designated organization of the National Railway Administration of the PRC according to the requirements of 4.2 to 4.4. Approved by the competent department of the National Railway Administration of the PRC and issued sub-ballast mining qualification certificate before production. 5.1.2 Sampling Divide the mining resource zone by the commissioned mine organization, and develop appropriate mining and processing procedures by the construction organization. In each given resource zone, 400 kg of representative samples are processed according to the developed mining and processing procedures, which is submitted to the designated organization of the National Railway Administration of the PRC for inspection 5.1.3 When the resource zone changes significantly, and the quality of sub-ballast cannot meet the requirements of this Standard, it shall carry out type inspection again. 5.2 Production inspection 5.2.2 According to the requirements of 4.2 to 4.4, the production organization carries out an inspection when every 4 × 104 m3 of sub-ballast are produced. If the annual output is less than 4 × 104 m3, the inspection shall be carried out once a year. 5.2.2 Sampling Sub-ballast material samples are taken from the finished product discharge port or finished product transport belt. Take four sub-samples at intervals, with each sub- sample weigh about 100 kg and total weight of 400 kg, to send to the inspection department for inspection. 5.2.3 For sub-ballast material’s particle size grading and clay content indicators, in addition to inspect once a week, each production shift shall be monitored by visual inspection. If any problem is found, it shall inspect and handle promptly. Monitoring and inspection results shall be filled in the production diary, as the basis for the ......