HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

SJ/T 11711-2018 PDF English

US$290.00 · In stock · Download in 9 seconds
SJ/T 11711-2018: Acceptance specification for indoor LED display screen multimedia system
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
SJ/T 11711-2018English290 Add to Cart 0-9 seconds. Auto-delivery Acceptance specification for indoor LED display screen multimedia system Valid

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: SJ/T 11711-2018
      

Similar standards

GB/T 19954.2   GB/T 19954.1   SJ/T 11710   

SJ/T 11711-2018: Acceptance specification for indoor LED display screen multimedia system

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/SJT11711-2018
SJ ELECTRONIC INDUSTRY STANDARD ICS 33.160.25 M 74 Filling No.. Acceptance Specification for Indoor LED Display Screen Multimedia System Issued on: APRIL 30, 2018 Implemented on: JULY 1, 2018 Issued by. Ministry of Industry and Information Technology of the People’s Republic of China.

Table of Contents

Foreword... 3 1 Scope... 4 2 Normative References... 4 3 Terms and Definitions... 4 4 Requirements... 6 4.1 Normal Operating Conditions... 6 4.2 Interface Requirements... 6 4.3 Supported Computer Display Signal Formats... 6 4.4 Functional Requirements... 7 4.5 Performance Requirements... 7 4.6 Power Adaptability... 8 4.7 Safety... 8 4.8 System Stability... 8 5 Acceptance Process... 9 6 Acceptance Inspection Conditions... 10 6.1 Environmental Requirements for Acceptance Inspection Sites... 10 6.2 Acceptance Conditions... 11 6.3 Optical Measuring Instruments... 11 7 Acceptance Inspection Methods... 11 7.1 Technical Document Inspection... 11 7.2 Configuration Inspection... 11 7.3 Engineering Inspection... 11 7.4 Interface Inspection... 15 7.5 Support Signal Format Inspection... 15 7.6 Functional Inspection... 15 7.7 Performance Measurement... 16 7.8 Power Adaptability... 20 7.9 Safety... 20 7.10 System Stability... 21 8 Acceptance Rules... 21 8.1 Acceptance Inspection Items... 21 8.2 Judgment Rules... 21 Acceptance Specification for Indoor LED Display Screen Multimedia System

1 Scope

This Standard specifies the requirements, acceptance process, acceptance inspection conditions, acceptance inspection methods and acceptance rules for indoor light-emitting diode (LED) display screens (hereinafter referred to as “LED display screens”) and LED display multimedia systems (hereinafter referred to as “display systems”). This Standard is applicable to the design, procurement, construction and acceptance of LED display screens and display systems.

2 Normative References

The following documents are indispensable to the application of this document. In terms of references with a specified date, only versions with a specified date are applicable to this document. In terms of references without a specified date, the latest version (including all the modifications) is applicable to this document. GB 4943.1-2011 Information Technology Equipment - Safety - Part 1.General Requirements GB 50311-2007 Code for Engineering Design of Generic Cabling System GB 50312-2007 Code for Engineering Acceptance of Generic Cabling System SJ/T 11141-2012 Generic Specification for LED Panels SJ/T 11281 Measure Methods of Light Emitting Diode (LED) Displays

3 Terms and Definitions

The terms and definitions defined in SJ/T 11141-2012 and the following ones are applicable to this document. 3.1 LED Display Unit LED Display Assembly Display Assembly An independent device consisting of several display modules, control circuits, power converters and corresponding structural parts. 3.2 Pixel Pitch Pixel Pitch The distance between the center points of two adjacent pixels on an LED display screen. 3.3 LED Display Screen A device spliced with one or more LED display units that displays text, images, videos and other information. 3.4 Splicing Processor A digital processing device that divides a complete picture or image signal into several areas, assigns them to corresponding display units according to a certain logical relationship, and controls the display screen to display the pictures or images required by the user. 3.5 LED Display Multimedia System A display system consisting of an LED display screen and a splicing processor. 3.6 Open Window Window Display specified information in a specified area within the display range of the LED display screen. 3.7 Window Superpose Two or more windows overlap in the display section. 3.8 Desktop A computer graphics display interface used in a display system with a resolution that matches the LED display screen. 3.9 Roaming The window can be moved to any position on the LED display screen. 3.10 Physical Gap The gap between the edges of adjacent display units in the LED display screen. a) Continuous operating time. The display system shall be able to ensure trouble-free operation for no less than 7×24 h; b) The display system can operate normally after startup or restart; c) During the operation of the display system with redundant design, if one of the modules fails, the corresponding redundant module can operate normally and the system remains in normal operation.

5 Acceptance Process

The acceptance shall meet the following requirements. a) The acceptance process of the display system shall be carried out according to Figure 1; b) After the display system is constructed, it shall be put into trial operation, and the trial operation time shall be agreed upon by both parties; c) After the trial operation, the construction organization shall conduct self-inspection; after the self-inspection is qualified, the construction organization shall submit an application report for project completion acceptance to the construction organization; d) The acceptance shall be carried out by the acceptance team organized by the construction organization, and the acceptance team members shall formulate an acceptance protocol before the acceptance; e) The acceptance content includes the following. data inspection, display system configuration inspection, engineering inspection, functional performance acceptance, acceptance review, acceptance filing and handover; f) For display systems that fail the acceptance, the acceptance team shall clearly record it in the acceptance conclusion, and the construction organization shall submit an acceptance application again after rectification; g) After the acceptance review is passed, filing and handover shall be carried out. --- Ambient light. When conducting visual observation, it shall be carried out under the ambient light conditions on site. The ambient light can be fully turned on or off or partially turned on as needed. When using optical measuring instruments for measurement, the ambient light illumination shall not exceed 10 lx. 6.2 Acceptance Conditions The requirements for acceptance conditions are as follows. --- Visual distance. If the space of the acceptance site is 3 to 4 times greater than the screen height, human eye observation shall be performed at 4 times the distance; if this condition is not met, the maximum distance on site shall be used as the observation distance; --- Acceptance status. The display system shall be turned on and run, and acceptance shall be carried out after normal continuous operation for 30 min. 6.3 Optical Measuring Instruments Optical measuring instruments used for on-site acceptance should preferably be contact instruments.

7 Acceptance Inspection Methods

7.1 Technical Document Inspection The contents of technical document inspection are as follows. a) Technical documents include third-party test reports, user manuals, operation manuals, management and maintenance manuals, parameter configuration documents for installation and commissioning, and project completion acceptance documents; b) Check the completeness and correctness of the accompanying documents and materials provided by the manufacturer, including the packing list and other materials. 7.2 Configuration Inspection Check the model, specification, quantity, appearance and label of each equipment. 7.3 Engineering Inspection 7.3.1 Structure The structural requirements are as follows. a) The appearance of the structure shall be free of serious scratches, color difference, coating shedding, etc.; b) The connecting bolts of the structure shall be firm; c) The connection between the structure and the anchors, and between the wall fixtures shall be firm. 7.3.2 Screen The requirements for the screen are as follows. a) The appearance of the screen shall be neat, and the surface shall not have defects such as bumps, scratches, cracks, burrs, mildew spots, etc.; the surface coating shall be free of blistering, cracking, or shedding; b) Metal parts shall not have rust or other mechanical damage, and the perfusion matter shall not overflow; c) The operation of switches, buttons and knobs shall be flexible and reliable, and the parts shall be tight and not loose; d) There shall be no obvious installation gaps, and the whole shall have sufficient mechanical stability; e) The text and graphic symbols that describe the function shall be correct, clear, upright and firm, and the indication shall be correct; f) The screen shall have no obvious light leakage. 7.3.3 Cable laying requirements 7.3.3.1 General requirements The general requirements for cable laying are as follows. a) Cable laying shall comply with the relevant provisions of GB 50311-2007 and GB 50312-2007; b) Cables shall be laid straight without twisting, crossing, or looping; c) The laid cables shall be intact, with no damage to the outer skin, and labels shall be affixed to both ends of the cables; the labels shall be correct, complete and clear; d) Signal cables, video cables, power cables, and mouse and keyboard extension cables shall be firmly connected and beautiful. 7.3.3.2 Requirements for indoor cable laying The laying of indoor cables shall comply with the following provisions. a) The clearance between signal lines and electrical equipment with strong magnetic and electric fields shall comply with the following provisions. 1) When non-shielded cables are laid through metal protective pipes or in closed metal cable ducts, the length shall be 0.8 m; when laid directly, it shall be greater than 1.5 m; 2) The length of shielded cables shall be greater than 0.8 m. b) When laying cables, the minimum bending radius of multi-core cables shall be greater than 6 times their outer diameter; the minimum bending radius of coaxial cables shall be greater than 15 times their outer diameter; the minimum bending radius of optical cables shall be greater than 20 times their outer diameter. c) The cross-sectional utilization rate of cable ducts shall not be greater than 50%; the cross-sectional utilization rate of cables laid through pipes shall not be greater than 40%. d) When laying cables along brackets or in cable ducts, the following provisions shall be met. 1) When the cables are arranged vertically or the slope exceeds 45º, the cables shall be firmly fixed on each bracket; 2) When the cables are arranged horizontally or the slope does not exceed 45º, the cables shall be firmly fixed every 1 to 2 brackets; 3) The cables shall be firmly fixed 150 mm to 300 mm before the introduction of the junction box and the distribution box. e) Junction boxes or pull boxes shall be installed in the following situations, and the installation position shall be convenient for threading. 1) For non-curved pipelines, when the pipeline length exceeds 30 m, one shall be installed every 30 m; 2) There is one turn between two cable pulling points and the length of the pipeline does not exceed 20 m; 3) There are two turns between two cable pulling points and the length of the pipeline does not exceed 15 m; 4) There are three turns between two cable pulling points, and the length of the pipeline does not exceed 8 m. f) Fixed cable clamps shall be installed at the turns of the pipeline or every 1.5 m in the straight line distance. g) For vertically laid conduits, a junction box for fixing the cables shall be installed every 10 m according to the size of the cross-sectional area of the conductors inserted, and the conductors shall be fixed in the box with insulated cable clamps. 7.4 Interface Inspection Use visual method to check. 7.5 Support Signal Format Inspection Input the video signal or computer signal into the display system, and the system shall be able to display normally. 7.6 Functional Inspection 7.6.1 Open window, window scaling, window superpose, full screen display signal roaming, full screen display, desktop output Perform corresponding operations through the control software. The LED display screen shall display operations or signals such as open window, window scaling, window superpose, full screen signal roaming, full screen display and desktop output. 7.6.2 Full screen synchronization The LED display screen plays the motion image on the full screen. Observe the motion image screen, the screen shall be coherent, without freezing, frame loss, frame asynchronization, etc. 7.6.3 Computer display function and graphic display function Send computer signals and graphic signals to the LED display screen, and observe that the corresponding screen or image shall be displayed on the screen. 7.6.4 Signal input Send the video signal of the corresponding format (VIDEO, RGB, IP video, etc.) to the display system, and observe that the LED display screen shall display the corresponding screen or image. 7.6.5 Color temperature selection Select the corresponding color temperature through the corresponding control software, and observe that the color temperature of the LED display screen shall change accordingly. If necessary, the color temperature can be measured with a measuring instrument. 7.6.6 Real-time monitoring The information of the main components of the display system can be called up through the corresponding control software, and the monitored data and information shall be able to be ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of SJ/T 11711-2018 be delivered?

Answer: The full copy PDF of English version of SJ/T 11711-2018 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of SJ/T 11711-2018_English with my colleagues?

Answer: Yes. The purchased PDF of SJ/T 11711-2018_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- SJ/T 11711-2018 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

How to buy and download a true PDF of English version of SJ/T 11711-2018?

A step-by-step guide to download PDF of SJ/T 11711-2018_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "SJ/T 11711-2018".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9