HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (12 Oct 2025)

SJ/T 11340-2015 PDF English

US$455.00 · In stock · Download in 9 seconds
SJ/T 11340-2015: General specification for front projector
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid

SJ/T 11340: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
SJ/T 11340-2015English455 Add to Cart 0-9 seconds. Auto-delivery General specification for front projector Valid
SJ/T 11340-2006EnglishRFQ ASK 6 days General specification for LCD front projectors Obsolete

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: SJ/T 11340-2015
      

Similar standards

GB/T 19954.2   GB/T 19954.1   SJ/T 11346   

SJ/T 11340-2015: General specification for front projector

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/SJT11340-2015
SJ ELECTRONIC INDUSTRY STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 33.160.25 M 74 File No.: Replacing SJ/T 11340-2006 General specification for front projector ISSUED ON: APRIL 30, 2015 IMPLEMENTED ON: OCTOBER 01, 2015 Issued by: Ministry of Industry and Information Technology of the People's Republic of China

Table of Contents

Foreword ... 3 1 Scope ... 5 2 Normative references ... 5 3 Terms, definitions and abbreviations ... 6 4 General requirements ... 7 5 Technical requirements ... 8 6 Test methods ... 12 7 Inspection rules ... 14 8 Marks, packaging, transportation, storage ... 21 9 Requirements for preparation of product instruction manual ... 22 Annex A (normative) Unpacking inspection content and criteria for nonconformity . 23 Annex B (normative) Technique assembly inspection content and criteria for nonconformity ... 27 Annex C (normative) Environmental test content and criteria for nonconformity ... 28 Annex D (normative) Content of inspection for performance at room temperature and criteria for nonconformity ... 30 Annex E (normative) Contents of product instruction manual ... 31 General specification for front projector

1 Scope

This Specification specifies the function and performance, test methods, inspection rules, marks, packaging, transportation, storage, etc. for front projectors. This Specification applies to front projectors with liquid crystal (LCD), liquid crystal on silicon (LCoS), and digital optical processing (DLP) projection methods. It is the main basis for product design, production finalization and inspection. Other projection methods and front projectors used in different occasions can use this Specification as a reference.

2 Normative references

The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB/T 191, Packaging and storage marks GB/T 2828.1, Sampling procedures for inspection by attributes -- Part 1: Sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection GB/T 2829, Sampling procedures and tables for periodic inspection by attributes (apply to inspection of process stability) GB 4943.1, Audio/video, information and communication technology equipment - Part 1: Safety requirements GB 5296.1, Instructions for use of products of consumer interest - Part 1: General principles GB/T 5465.2, Graphical symbols for use on electrical equipment - Part 2: Graphical symbols GB 9254, Information technology equipment - Radio disturbance characteristics - Limits and methods of measurement GB/T 14960, Technical requirements and measurement methods of infrared remote- control radiation unit for television broadcast receivers GB 17625.1, Electromagnetic compatibility - Limits - Part 1: Limits for harmonic current emissions (equipment input current ≤16 A per phase) SJ/T 10514-1994, Technical requirements and methods of measurement on infrared remote control unit for television broadcast receivers SJ/T 10919, Packaging of color broadcasting TV receiver SJ/T 11324, Terminology of digital television receiving equipment SJ/T 11325, Reliability test methods for digital television receiver and display equipment SJ/T 11326, Environmental testing methods for digital television receiver and display equipment SJ/T 11329, Specification of interfaces for digital television receiving equipment. Part 3: Video interface of composite video blanking synchronization SJ/T 11330, Specification of interfaces for digital television receiving equipment. Part 4: Video interface of S-Video SJ/T 11331, Specification of interfaces for digital television receiving equipment. Part 5: Analog audio interface SJ/T 11332, Specification of interfaces for digital television receiving equipment - Part 6: Analog video interface of RGB SJ/T 11333, Specification of interfaces for digital television receiving equipment - Part 7: Interface of video component YPBPR SJ/T 11346-2015, Methods of measurement for electronic projectors SJ/T 11348-2016, Methods of performance measurement for flat panel displays

3 Terms, definitions and abbreviations

3.1 Terms and definitions For the purposes of this document, the terms and definitions defined in SJ/T 11324 as well as the followings apply. 3.1.1 front projector A projector that allows users to view projected images normally on the same side as the projector. 3.1.2 passive standby mode A low power state in which the projector is connected to mains power and does not provide primary functionality. The projector can only enter this mode after receiving external excitation signals such as remote control and buttons. The projector can return to the working mode from this mode through the excitation of the remote control device, internal signal, etc. 3.1.3 passive standby power The active power measured by the projector in passive standby mode. NOTE: The unit is watts (W). 3.1.4 unit quality The overall quality of the projector including working lens. NOTE: The unit is kilograms (kg). 3.1.5 ratio of all white and all black Under standard working conditions, the ratio of the average illuminance of a full white field image to a full black field image. 3.2 Abbreviations The following abbreviations apply to this document. UQ: Unit Quality.

4 General requirements

4.1 Normal use conditions Normal use conditions are: - Ambient temperature: 5°C~ 35°C: - Relative humidity: 20% ~ 80% (non-condensation state); - Air pressure: 86 kPa ~ 106 kPa: - Power supply: AC 176 V~ 240 V, 49 Hz~ 51 Hz. 4.2 Graphical symbols for equipment Graphical symbols shall comply with the relevant provisions of GB/T 5465.2. The graphic symbols not defined in GB/T 5465.2 shall be specified by the product 7.1.3.1 Classification for nonconformity The front projector is divided into safety nonconformity (indicated by the character Z in Table A.1), type A, type B and type C nonconformity according to the severity of quality characteristics. 7.1.3.2 Classification for nonconforming products A unit product with one or more nonconforming items is called a nonconforming product. According to the nonconforming type, it is divided into safety nonconforming products, type A nonconforming products, type B nonconforming products, and type C nonconforming products. 7.1.3.3 Criteria for nonconformity The criteria for failure are as follows: a) Requirements for performance at room temperature: According to the provisions of Annex D. b) Requirements for appearance, structure: According to A.4 in Annex A. c) Safety requirements: As long as it does not meet the requirements in 5.8, it will be judged as safety nonconformity. d) Requirements for electromagnetic compatibility characteristic limits: According to the relevant provisions in 5.7. e) Requirements for environmental adaptability: According to Annex C. f) Requirements for reliability: According to the relevant provisions in 5.9. 7.1.4 Judgement for conformity and nonconformity 7.1.4.1 Appearance structure The test results are in accordance with the provisions of A.4 in Annex A. Type Z and type A nonconforming products are not allowed. The number of nonconforming products of type B is not more than 3. The number of nonconforming products of type C is not more than 4. If the above conditions are met, it shall be accepted; otherwise, it shall be rejected. 7.1.4.2 Performance at room temperature If the inspection results meet the following two criteria, it shall be accepted; otherwise, it shall be rejected. a) The 3 pieces in the first group all pass the test. b) There are nonconforming products in the first test group. After using the second group to test, the total number of type A nonconforming products in the two groups is not more than 1, and the number of type B nonconforming products is not more than 3. 7.1.4.3 Limits of electromagnetic compatibility characteristics The number of samples is 3. If there are nonconforming items in the test, it will be judged as nonconforming. 7.1.4.4 Environmental test If the inspection results meet the following two criteria, it shall be accepted; otherwise, it shall be rejected. a) The 3 pieces in the first group all pass the test. b) There are nonconforming products in the first test group. After using the second group to test, the total number of type A nonconforming products in the two groups is not more than 1, the number of type B nonconforming products is not more than 3, and the number of type C nonconforming products is not more than 4. 7.1.5 Processing of inspection results For items that fail the stereotype inspection, the cause shall be found out in time, and improvement measures shall be proposed. Re-do the test of this failed item and related items until it is accepted. If the inspection items are qualified, it will be judged as accepted. 7.2 Delivery inspection 7.2.1 Inspection items 7.2.1.1 Unpacking inspection Inspection content and methods are according to 5.11 and 6.9. 7.2.1.2 Appearance and structure inspections Inspection content and methods are according to 5.1 and 6.1. 7.2.1.3 Interface, function and display format inspections Inspection content and methods are according to 5.2, 5.3, 5.4 and 6.2. 7.2.1.4 Inspection for performance at room temperature 7.3.7 Processing of inspection results 7.3.7.1 Accepted batch Routine inspection is passed. 7.3.7.2 Rejected batch The rejected batch shall be processed as follows: a) Products that fail routine inspection shall be suspended for delivery inspection. The products that have been produced and the products that have been delivered shall be settled through negotiation between the delivery and receiving parties. b) The delivery party shall immediately take improvement measures. After improvement, re-sample from newly produced products. Inspect failed inspection items and related inspection items. Normal production and inspection can only be resumed after a qualified conclusion is obtained.

8 Marks, packaging, transportation, storage

8.1 Marks 8.1.1 Marks for front projector body The name, trademark, model and product number of the manufacturer shall be marked on the body of the front projector. The body of the front projector shall be marked with the nature of the power supply, rated voltage, power frequency, power consumption, and warning users to prevent electric shock. The body of the front projector shall be marked with the China Compulsory Certification (CCC) mark authorized by a nationally recognized certification body. 8.1.2 Packing box mark The packing box mark shall contain: Product name, model, name and address of the manufacturer. a) Trademark name and registered trademark pattern; b) Production date: year, month, day; c) Packing quality: the unit is kilogram (kg); d) Product standard number implemented; e) Maximum dimensions of the package: l×b×h, in centimeters (cm); f) Chassis color marking; g) Marks such as fear of rain, upward, fragile items, and limit of stacking layers shall comply with the provisions of GB/T 191. 8.2 Packaging It shall comply with the provisions of SJ/T 10919. 8.3 Transportation The fully packaged front projector can be transported by land, sea and air transportation. During the transportation process, it shall be in accordance with the provisions on packaging marks. Avoid direct raining by snow and rain. 8.4 Storage The fully packaged front projector shall be stored in a warehouse with an ambient temperature of -15°C~45°C, a relative humidity not greater than 80%, and no acid, alkali, other corrosive gases, and pollutants around. The storage period is 1a. Products exceeding 1a shall be subjected to unpacking inspection. Only after passing the re- inspection can the product enter the circulation field.

9 Requirements for preparation of product instruction manual

The preparation of the product instruction manual shall meet the requirements of GB 5296.1. The specific content shall be in accordance with the provisions of Annex E. ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of SJ/T 11340-2015 be delivered?

Answer: The full copy PDF of English version of SJ/T 11340-2015 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of SJ/T 11340-2015_English with my colleagues?

Answer: Yes. The purchased PDF of SJ/T 11340-2015_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- SJ/T 11340-2015 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

Question 5: Should I purchase the latest version SJ/T 11340-2015?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version SJ/T 11340-2015 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

How to buy and download a true PDF of English version of SJ/T 11340-2015?

A step-by-step guide to download PDF of SJ/T 11340-2015_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "SJ/T 11340-2015".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9