HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

QB/T 4108-2010 PDF English

US$70.00 · In stock · Download in 9 seconds
QB/T 4108-2010: Metal accessories for footwear
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
QB/T 4108-2010English70 Add to Cart 0-9 seconds. Auto-delivery Metal accessories for footwear Valid

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: QB/T 4108-2010
      

Similar standards

GB/T 3903.8   GB/T 3903.9   QB/T 2673   

QB/T 4108-2010: Metal accessories for footwear

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/QBT4108-2010
ICS 61.060 Classification Number. Y 78 Record Number. 30270-2011 LIGHT INDUSTRY STANDARD OF THE PEOPLE'S REPUBLIC OF CHINA Metal accessories for footwear Issued on: NOVEMBER 22, 2010 Implemented on: MARCH 1, 2011 Issued by. Ministry of Industry and Information Technology QB

Table of Contents

Forward... 3 1 Scope... 4 2 Normative references... 4 3 Requirements... 4 4 Sampling... 5 5 Test methods... 5 6 Inspection rules... 5 7 Signs, packaging, transportation, and storage... 6 References... 7 Forward This standard was proposed by China Light Industry Federation. This standard shall be centralized by the National Footwear Standardization Technical Committee. Drafting organizations of this standard. China Leather and Footwear Industry Research Institute, Wenzhou America Rita decorative buckle Ltd., and Jiaxing Fur and Footwear Industry Research Institute. The main drafters of this standard. Yan Hongwei, Tian Wang, Huang Meiyong, Lin Li, Zhuang Li, and Mao Minghua. This standard is the first-time release. b) When the production is resumed after long-term of shut-down (3 months); c) When the National Quality Supervision and Inspection Agency requires to perform type inspection; d) When normal production, type inspection shall be performed at least once every 6 months. 6.3 Determination If 2 sets of samples meet the requirements of Table 1, the batch of the products is determined as qualified. If one or more items do not meet the requirements, then conduct double-sampling. Re-inspect the non-conformance items. If all items meet the requirements, then the batch of the products is determined as qualified. If there is one or more items not meeting the requirements, the batch of the products is determined as unqualified.

7 Signs, packaging, transportation, and storage

7.1 Signs On the product packaging, it shall be marked with. This standard number, product name, quantity, specifications and model, manufacturer name and address, date of production and so on. 7.2 Packaging It should contain soft pack, moisture agent and the like. 7.3 Transportation and storage During transportation and storage, it must avoid pressure, moisture, rain, sun-exposure. And it must not stored together with oil, acid, alkali and other corrosive substances. In handling, loading and unloading, it is prohibited from tossing. It must prevent the mutual friction and damage between the metal accessories. Those without coating should be applied with rust-inhibitor. Warehouse shall be maintained with good ventilation, dry, without corrosive substance (gas). Products shall be placed 0.2m above ground and away walls. If there are other requirements related to packaging, transportation and storage, it shall be agreed upon by both purchaser and supplier. References SJ 1282-1977 Test methods for adhesion of metallic coatings ISO/TR 20572.2007 Footwear - Performance requirements for components for footwear - Accessories ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of QB/T 4108-2010 be delivered?

Answer: The full copy PDF of English version of QB/T 4108-2010 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of QB/T 4108-2010_English with my colleagues?

Answer: Yes. The purchased PDF of QB/T 4108-2010_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- QB/T 4108-2010 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

How to buy and download a true PDF of English version of QB/T 4108-2010?

A step-by-step guide to download PDF of QB/T 4108-2010_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "QB/T 4108-2010".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9