HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

MT/T 827-2005 PDF English

US$70.00 · In stock · Download in 9 seconds
MT/T 827-2005: Coal mining machine hydraulic fluid power - General rules relating to system
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid

MT/T 827: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
MT/T 827-2005English70 Add to Cart 0-9 seconds. Auto-delivery Coal mining machine hydraulic fluid power - General rules relating to system Valid
MT/T 827-1999English479 Add to Cart 4 days Coal mine machinery hydraulic fluid power. General rules for the application of equipment to transmission and control systems Obsolete

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: MT/T 827-2005
      

Similar standards

GB/T 29723.5   HAD 002/02   MT/T 489   

MT/T 827-2005: Coal mining machine hydraulic fluid power - General rules relating to system

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/MTT827-2005
MT COAL INDUSTRY STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 73.100.99 D 98 Registration number. 17357-2006 Replacing MT/T 827-1999 Coal mining machine hydraulic fluid power - General rules relating to system Issued on: JANUARY 17, 2006 Implemented on: JULY 01, 2006 Issued by. National Development and Reform Commission of PRC

Table of Contents

Foreword ... 3 1 Scope ... 4 2 Normative references ... 4 3 Requirements ... 5 4 System design ... 5 5 Energy conversion components ... 7 6 Hydraulic valve ... 8 7 Hydraulic oil fluids and regulating components ... 8 8 Piping system ... 8 9 Control system ... 9 10 Diagnosis and monitoring ... 9 11 Cleaning and painting ... 9 12 Transportation preparation ... 9 13 Test ... 9 14 Marking instructions (when citing this standard) ... 9 Coal mining machine hydraulic fluid power - General rules relating to system

1 Scope

This standard specifies the general technical conditions for the design and manufacture of coal mining machinery hydraulic systems. This standard is applicable to the hydraulic system of coal mining machinery and equipment with hydraulic oil (liquid) as working medium and nominal pressure not higher than 31.5 MPa.

2 Normative references

The provisions in following documents become the provisions of this standard through reference in this standard. For the dated references, the subsequent amendments (excluding corrections) or revisions do not apply to this standard; however, parties who reach an agreement based on this standard are encouraged to study if the latest versions of these documents are applicable. For undated references, the latest edition of the referenced document applies. GB/T 786.1-1993 Fluid power systems and components - Graphic symbols and circuit diagrams- Part 1. Graphic symbols (neq ISO 1219-1.1991) GB/T 3766-2001 Hydraulic fluid power - General rules relating to systems (eqv ISO 4413.1998) GB 3836.1-2000 Electrical apparatus for explosive gas atmospheres - Part 1. General requirements (eqv IEC 60079-0.1998) GB 3836.2-2000 Electrical apparatus for explosive gas atmospheres - Part 2. Flameproof enclosure d (eqv IEC 60079-1.1990) GB 3836.4-2000 Electrical apparatus for explosive gas atmospheres - Part 4. Intrinsic safety (eqv IEC 60079-11.1999) ISO 1219-2.1995 Fluid power systems and components - Graphic symbols and circuit diagrams - Part 2. Circuit diagrams GB/T 786.1-1993 and ISO 1219-2.1995. The circuit diagram shall express the system design principle, identify the components and meet the requirements of clause 3. The following information shall be included in the circuit diagram or provided together with the diagram. a) The name, part number, serial number or design number of all devices as well as the marking of the manufacturer or supplier name; b) The diameter, wall thickness and technical conditions of the hard pipe and the diameter and technical conditions of the hose assembly; c) The inner diameter of the hydraulic cylinder, the diameter of the piston rod, the stroke length, the working pressure and the speed; d) The rated working pressure, displacement, torque, speed and direction of rotation of the hydraulic motor; e) The rated working pressure, displacement, speed and direction of rotation of the hydraulic pump; f) The power, speed and model of the prime mover of the hydraulic pump; g) The pressure setting of the pressure control valve; h) The model of filter screen, filter and replacement filter; i) The fuel tank volume; j) The variety of working oil solutions; k) The schedule of the relationship between the ON/OFF of the electromagnet and the electrical communication device and the actuator action status; l) The outline (dotted line) of the circuit included in each oil circuit board; m) The clear indication of the function of each actuator in all directions; n) The inflation pressure and nominal volume of the accumulator; o) The diameter, type and position of the pressure test point, the hydraulic solution sampling point and the vent point in the circuit; p) The oil port identification of all components or oil blocks (consistent with those indicated on the component or the oil block); q) The expected flow rate, the heat exchange area, the highest and lowest pressures of the cooling device, the maximum input temperature, the highest and the lowest input pressure of the cooling medium; set with the vent outlet.

9 Control system

9.1 The control system shall be set in accordance with the provisions of clause 10 of GB/T 3766 2001. 9.2 The servo valve and associated actuators shall be mounted as close as possible, to reduce the volume of liquid contained between the valve and the actuator.

10 Diagnosis and monitoring

Diagnostics and monitoring shall be in accordance with the provisions of clause 11 of GB/T 3766 2001.

11 Cleaning and painting

Cleaning and painting shall comply with the provisions of clause 12 of GB/T 3766-2001.

12 Transportation preparation

The transportation preparation shall comply with the provisions of clause 13 of GB/T 3766-2001.

13 Test

13.1 The system shall be tested in accordance with specifications or protocols to determine whether its performance meets the requirements of this standard and design. 13.2 For the hydraulic system used in underground coal mines, the “product certificate”, “explosion-proof certificate” and the “safety mark certificate for coal mine products” shall be provided for explosion-proof electrical equipment.

14 Marking instructions (when citing this standard)

When deciding to comply with this standard, the following instructions shall be used in the contract between the purchaser and the supplier and in the final data package. ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of MT/T 827-2005 be delivered?

Answer: The full copy PDF of English version of MT/T 827-2005 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of MT/T 827-2005_English with my colleagues?

Answer: Yes. The purchased PDF of MT/T 827-2005_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- MT/T 827-2005 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

Question 5: Should I purchase the latest version MT/T 827-2005?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version MT/T 827-2005 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

How to buy and download a true PDF of English version of MT/T 827-2005?

A step-by-step guide to download PDF of MT/T 827-2005_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "MT/T 827-2005".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9