HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (25 Oct 2025)

JGJ85-2010 PDF English

US$155.00 · In stock · Download in 9 seconds
JGJ85-2010: Technical specification for application of anchorage, grip and coupler for prestressing tendons
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid

JGJ85: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
JGJ 85-2010English155 Add to Cart 0-9 seconds. Auto-delivery Technical specification for application of anchorage, grip and coupler for prestressing tendons Valid
JGJ 85-2002English959 Add to Cart 6 days Technical specification for application of anchorage, grip and coupler for prestressing tendons Obsolete
JGJ 85-1992English759 Add to Cart 5 days (Tendons anchorage, clamps and connectors application of technical regulations (provisions stated)) Obsolete

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: JGJ85-2010
      

Similar standards

GB/T 50081   GB 50068   JGJ 107   JGJ/T 17   

JGJ85-2010: Technical specification for application of anchorage, grip and coupler for prestressing tendons


---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/JGJ85-2010
Record No.. J 1006-2010 PROFESSIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA Technical Specification for Application of Anchorage, Grip and Coupler for Prestressing Tendons Issue on April 17, 2010 Implemented on October 1, 2010 Issued by. Ministry of Housing and Urban-Rural Development of the People's Republic of China JGJ

Table of Contents

1 General Provisions ... 1 2 Terms and Symbols ... 2 2.1 Terms ... 2 2.2 Symbols ... 3 3 Performance Requirements ... 5 4 Design Selection ... 8 5 Site Acceptance ... 11 6 Operating Requirements ... 14 Appendix A Test Methods and Inspection Requirements of Anchorage Zone Load Transfer ... 16 Appendix B Test Methods and Inspection Requirements of Static Load Anchoring Performance ... 20 Appendix C Test Methods for Anchorage Draw-in Value ... 23 Appendix D Test Method of Prestress Loss Due to Friction at Anchorage Device ... 25 Appendix E Test Methods and Inspection Requirements of Anchor Plate Performance ... 27 Appendix F Test Methods and Inspection Requirements of Low-Temperature Anchoring Performance Test for Anchorage ... 29 Appendix G Test Method of Prestress Loss Due to Friction at Deviated Device ... 32 Explanation of Wording in this Specification ... 33 List of Quoted Standards ... 34

1 General Provisions

1.0.1 This specification is formulated with a view to reasonably applying the anchorage, grip and coupler for prestressing tendons in the prestressed structure engineering, ensuring the safety and reliability of anchorage zone and anchorage joint, and ensuring quality. 1.0.2 This specification is applicable to the application of anchorage, grip and coupler for prestressing tendons in such engineering as prestressed concrete structure, building prestressed steel structure, rock anchor and ground anchor. 1.0.3 Application of anchorage, grip and coupler in the prestressed structure engineering shall not only meet the requirements of this specification, but also comply with those in the current relevant ones of the nation.

2 Terms and Symbols

2.1 Terms 2.1.1 Anchorage It refers to the permanent anchor device used to maintain the tensile force of prestressing tendon and transfer it to the structure in the post-tensioning structural member. 2.1.2 Grip In the production process of pre-tensioning prestressed concrete member, it refers to the instrumental anchor device used to maintain the tensile force of prestressing tendon and fix it on the production pedestal (or equipment); in the prestressing tendon tensioning process of post-tensioning structure or member, it refers to the instrumental anchor device used to clamp the prestressing tendon on the tensioning jack or equipment. 2.1.3 Coupler It refers to the device used to connect the prestressing tendon. 2.1.4 Prestressing tendon It is the general term of single or bundled steel wire, steel strand or prestressed twisted reinforcement (referring to fine rolling twisted reinforcement) used to establish prestress in the prestress works. 2.1.5 Prestressing tendon-anchorage (grip) assembly It refers to the load carrying unit assembled with prestressing tendon and anchorage (grip) at the end, hereinafter referred to as anchorage (grip) assembly. 2.1.6 Prestressing tendon-coupler assembly It refers to the load carrying unit assembled with prestressing tendon and coupler, hereinafter referred to as coupler assembly. 2.1.7 Ultimate tensile force of tendon-anchorage (grip, coupler) assembly It refers to the maximum tensile force reached by the tendon-anchorage (grip, coupler) assembly in the process of static load anchoring performance test. 2.1.8 Efficiency factor of prestressing tendon It refers to the factor subject to such factors as influence of number, test device and initial stress adjustment of prestressing tendon, in consideration of the uneven tensile stress of prestressing tendon. 2.1.9 Draw-in It refers to the retraction phenomenon of prestressing tendon due to the relative displacement between parts of anchorage or between anchorage and prestressing tendon in the anchoring process of prestressing tendon. Draw-in includes anchorage deformation, clip displacement and prestressing tendon retraction. 2.1.10 Bearing plate It refers to the component used to bear the pre-applied force transferred by the anchorage and transfer it to the concrete in the post-tensioning prestressed concrete structural member. Bearing plate may be divided into ordinary bearing plate and casting bearing plate. ᇞb——Relative displacement between parts of anchorage (or grip and coupler); ᇞl——Theoretical elongation value of prestressing tendon between working anchorage at the tensioning end and jack tool anchorage under the tensioning control force; εapu——Total strain of prestressing tendon where the prestressing tendon-anchorage assembly reaches the ultimate tensile force; ηn——Efficiency factor of anchorage determined in the static load anchoring performance test of prestressing tendon-anchorage assembly; ηg——Efficiency factor of grip determined in the static load anchoring performance test of prestressing tendon-grip assembly; ηp——Efficiency factor of prestressing tendon.

3 Performance Requirements

3.0.1 Basic performance of the anchorage, grip and coupler for prestressing tendons shall meet the requirements of the current national standard "Anchorage, Grip and Coupler for Prestressing Tendons" GB/T 14370. 3.0.2 The static load anchoring performance of anchorage shall be determined according to the efficiency factor (ηa) of anchorage measured through the static load test of prestressing tendon-anchorage assembly and the total strain (εapu) of the prestressing tendon in the assembly when reaching the ultimate tensile force. Efficiency factor (ηa) of anchorage shall not be less than 0.95; total strain (εapu) of prestressing tendon shall not be less than 2.0%. Efficiency factor of anchorage shall be determined according to the test results and calculated according to the following formula. pmp apu a F   (3.0.2) Where, ηa——Efficiency factor of anchorage determined in the static load test of prestressing tendon-anchorage assembly; Fapu——Ultimate tensile force of prestressing tendon-anchorage assembly (N); Fpm——Average ultimate tensile force of prestressing tendon(N), calculated and determined by breaking force mean of prestressing tendon specimen; ηp——Efficiency factor of prestressing tendon, which shall be taken according to the following requirements. if prestressing tendon in the prestressing tendon-anchorage assembly is 1~5, ηp=1. 6~12, ηp=0.99; 13~19, ηp=0.98; 20 and above, ηp=0.97. Failure mode of prestressing tendon-anchorage assembly shall be prestressing tendon fracture, and anchorage parts shall not be fractured. Clip of clip-type anchorage shall not appear fissure if the tensile stress of prestressing tendon does not exceed 0.8fptk. 3.0.3 Where prestressing tendon - anchorage (or coupler) assembly is damaged, clip of clip-type anchorage may appear fine fissure or one longitudinal fissure. 3.0.4 Anchor plate of clip-type anchorage shall be possessed of sufficient rigidity and bearing capacity, and the performance of anchor plate shall be determined by the load test of anchor plate. Where the anchor plate is loaded to 0.95 Fptk and then unloaded, measured central residual deflection of anchor plate shall not be greater than 1/600 of the upper opening diameter of corresponding bearing plate; where the anchor plate is loaded to 1.2 Fptk, anchor plate shall not appear fissure or damage. 3.0.5 The anchorage adopted in the structure need fatigue checking calculation shall meet the requirements of fatigue performance. 3.0.6 The anchorage adopted in the structure with aseismic requirements shall meet the requirements of low-cycle repeated-load performance. 3.0.7 Where the operating environment temperature of anchorage is lower than -50℃, anchorage shall meet the requirements of low-temperature anchoring performance. 3.0.8 Anchorage shall meet the requirements of such tensioning processes as multistage tension, tension complement and loose tension. The anchorage anchoring multiply calculated according to the relevant requirements of the current national standard "Code for Design of Concrete St... ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of JGJ85-2010 be delivered?

Answer: The full copy PDF of English version of JGJ85-2010 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of JGJ85-2010_English with my colleagues?

Answer: Yes. The purchased PDF of JGJ85-2010_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- JGJ85-2010 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

Question 5: Should I purchase the latest version JGJ85-2010?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version JGJ85-2010 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

How to buy and download a true PDF of English version of JGJ85-2010?

A step-by-step guide to download PDF of JGJ85-2010_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "JGJ85-2010".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9