JB/T 7230-2013 PDF English
Search result: JB/T 7230-2013_English: PDF (JB/T7230-2013)
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Name of Chinese Standard | Status |
JB/T 7230-2013 | English | 150 |
Add to Cart
|
0-9 seconds. Auto-delivery.
|
Four-way electromagnetic reversing valve for heat pump
| Valid |
JB/T 7230-1994 | English | 479 |
Add to Cart
|
4 days
|
Electromagnetic four-way reversing valve for heat pump
| Obsolete |
BUY with any currencies (Euro, JPY, GBP, KRW etc.): JB/T 7230-2013 Related standards: JB/T 7230-2013
PDF Preview: JB/T 7230-2013
JB/T 7230-2013: PDF in English (JBT 7230-2013) JB/T 7230-2013
MACHINERY INDUSTRY STANDARD
OF THE PEOPLE’S REPUBLIC OF CHINA
ICS 27.200
J 73
Record No.: 40598-2013
Replacing JB/T 7230-1994
Four-way electromagnetic
reversing valve for heat pump
ISSUED ON: APRIL 25, 2013
IMPLEMENTED ON: SEPTEMBER 01, 2013
Issued by: Ministry of Industry and information Technology of PRC
Table of Contents
Foreword ... 4
1 Scope ... 5
2 Normative References ... 5
3 Terms and Definitions ... 6
4 Model and Basic Parameters ... 8
4.1 Model ... 8
4.2 Basic parameters ... 8
4.3 Nominal condition ... 9
4.4 Operating condition ... 9
5 Requirements ... 10
5.1 General requirements ... 10
5.2 Performance requirements ... 10
5.3 Destructive strength ... 14
6 Test Methods ... 14
6.1 Test instruments and apparatuses ... 14
6.2 General requirement test ... 15
6.3 Performance requirement test ... 15
6.4 Destructive strength test ... 21
7 Inspection Rules ... 21
7.1 General requirements ... 21
7.2 Inspection classification ... 21
7.3 Exit-factory inspection ... 22
7.4 Sampling inspection ... 22
7.5 Type inspection ... 23
8 Marking, Package, Transportation and Storage ... 23
8.1 Marking ... 23
8.2 Package ... 24
8.3 Transportation ... 24
8.4 Storage ... 24
Appendix A (Normative) Heat Exchanger Model Preparation Method ... 25
A.1 Heat exchanger model preparation method ... 25
A.2 Model example ... 25
Appendix B (Normative) Determination of the Nominal Capacity of Reversing
Valve ... 26
B.1 Measuring device ... 26
B.2 Position and requirements of measuring point ... 26
B.3 Test procedures ... 27
B.4 Calculation of nominal capacity ... 27
Figure 1 – Schematic Diagram for Nominal Capacity of 50kW and below ... 7
Figure 2 – Schematic Diagram of Nominal Capacity of 70kW and below ... 8
Figure 3 – Sealing Test Device Diagram ... 17
Figure 4 – Compressive Strength Test Device Diagram ... 17
Figure 5 – Minimum Reversing Pressure Difference Test Device ... 18
Table 1 – Basic Parameters ... 9
Table 2 – Nominal Condition ... 9
Table 3 – Operating Condition ... 10
Table 4 – Cleanliness ... 11
Table 5 – Internal Leakage ... 12
Table 6 – Heating Temperature ... 13
Table 7 – Minimum Destructive Pressure ... 14
Table 8 – Test Voltage ... 19
Table 9 – Inspection Rules ... 22
Table 10 – Sampling Plan ... 23
Four-way electromagnetic
reversing valve for heat pump
1 Scope
This Standard specifies the terms and definitions, model, basic parameters,
requirements, test methods, inspection rules, marking, package and storage of heat
pump four-way electromagnetic reversing valve for refrigeration equipment
(hereinafter referred to as “reversing valve”).
This Standard is applicable the four-way electromagnetic reversing valve for the
purposes of cooling and heating by changing the flow direction of the refrigerant in the
refrigeration device with refrigerants of R22, R134a, R404A, R407C, R410A, and the
valve’s nominal capacity of no more than 210kW.
2 Normative References
The following documents are essential to the application of this document. For the
dated documents, only the versions with the dates indicated are applicable to this
document; for the undated documents, only the latest version (including all the
amendments) are applicable to this document.
GB/T 191 Packaging - Pictorial Marking for Handling of Goods
GB/T 2423.1 Environmental Testing - Part 2: Test Methods - Tests A: Cold
GB/T 2423.2 Environmental Testing - Part 2: Test Methods - Tests B: Dry Heat
GB/T 2423.3 Environmental Testing―Part 2: Testing Method - Test Cab: Damp
Heat, Steady State
GB/T 2423.17 Environmental Testing for Electric and Electronic Products - Part 2:
Test Method - Test Ka: Salt Mist
GB/T 2624 (all parts) Measurement of Fluid Flow by Means of Pressure Differential
Devices Inserted in Circular Cross-Section Conduits Running Full
GB/T 6283 Chemical Products - Determination of Water Karl · Fischer Method
(General Method)
--- Under normal temperature condition, the insulation resistance between the live
parts and the non-live parts shall be greater than 100MΩ;
--- After the damp heat resistance test, the insulation resistance of the solenoid coil
of reversing valve shall be no less than 1.5MΩ.
5.2.6.3 Under the specified test method of the solenoid coil of the reversing valve, the
heating temperature requirements shall conform to the provisions of Table 6.
Table 6 – Heating Temperature
5.2.6.4 The solenoid coil of reversing valve shall meet the requirements of self-
extinguishing within 60s.
5.2.6.5 The solenoid coil of the reversing valve, after the damp heat resistance test,
shall meet the requirements of 5.2.6.1 and 5.2.6.2.
5.2.7 Low temperature resistance
After the low-temperature resistance test, the reversing valve shall meet the
requirements of 5.2.2, 5.2.4, 5.2.5, 5.2.6.1, 5.2.6.2.
5.2.8 High temperature resistance
After the high-temperature resistance test, the reversing valve shall meet the
requirements of 5.2.2, 5.2.4, 5.2.5, 5.2.6.1, 5.2.6.2.
5.2.9 Cold-thermal cycle resistance
After the cold-thermal cycle resistance test, the reversing valve shall meet the
requirements of 5.2.2, 5.2.4, 5.2.5, 5.2.6.1, 5.2.6.2.
5.2.10 Vibration resistance
During the vibration test, there shall be no loosening of the solenoid coil of reversing
valve and the falling-off and breaking of the weld-seam. After the test, the reversing
valve shall meet the requirements of 5.2.2, 5.2.4, 5.2.5, 5.2.6.1, 5.2.6.2.
5.2.11 Durability
After the durability test, the reversing valve shall meet the requirements of 5.2.2, 5.2.4,
5.2.5, 5.2.6.1, 5.2.6.2.
5.2.12 Corrosion resistance
Heat resistance level
Temperature °C
The accuracy of the flowrate measuring instrument shall be ±2% reading
value within the entire flowrate measuring range; the division value shall not
exceed 2.5 times of the specified accuracy;
The design, manufacture, installation and use of the flowrate measuring and
throttling device shall be in accordance with provisions of GB/T 2624.
--- The electrical measuring instruments shall meet the following requirements:
Voltmeter: depends on the voltage under test. When the voltage under test is
greater than 150V~300V, the accuracy tolerance shall be ±1.50V; when it is
greater than 300V~750V, the accuracy tolerance shall be ±3.75V;
Ammeter: accuracy shall be ±1% of the indicated value of the ammeter;
Resistance meter: accuracy shall be ±1% indicated value of the bridge type
resistance meter;
The division value of the electrical measuring instrument shall not exceed 2
times of the specified accuracy.
6.2 General requirement test
6.2.1 Check the interface and appearance size of the reversing valve by the plug gauge
and Vernier caliper.
6.2.2 Check the materials entering the factory according to the corresponding
standards; or check the material physical and chemical property test report, certificate
of conformity and other relevant information.
6.2.3 Appearance quality inspection shall be carried out by visual examination.
6.3 Performance requirement test
6.3.1 Cleanliness test
The contents of the cleanliness test are as follows:
a) Impurity content test
Before use, the glass sand crucible shall be firstly washed by hydrochloric acid,
then washed by the distilled water; place in the 120°C±2°C oven to bake for
30min; cool off to the room temperature; then use the one over ten-thousand
analytical balance to weigh; repeat the operation till the weight difference
between two times is within 0.2mg; record the reading; set it to be G1. Pour the
R141b cleaning agent into the inner cavity (the amount of the cleaning agent is
two-thirds of the volume of the inner cavity of the measured object) of the sample;
shake for 1min; pour the cleaning agent into the No.3 glass sand crucible to filter
(filtering accuracy is 15µm~35µm). Repeat to wash in such a way for 3 times,
then place the glass sand crucible containing impurities into 120°C±2°C oven to
bake for 1h; slightly cool off; place into the dryer to cool off to the room
temperature and weigh it; then dry according to the above method; and cool off
to the temperature and weigh it; repeat such operation till the weight difference
between the two adjacent times is no more than 0.2mg; record the reading; set
it to be G2. The difference shall be the impurity content, and the result shall meet
the requirements of 5.2.1.
b) Mineral oil content test
The filtered cleaning solution shall be evaporated into the 105°C±2°C thermostat
till the cleaning agent remains constant weight; use the one over ten-thousand
analytical balance to weigh it; measure the mineral oil content in it; the results
shall meet the requirements of 5.2.1.
c) Internal moisture content test
The used reagent shall be analytically pure methanol. If the mass fraction of
water in the reagent is greater than 0.05%, add 50g of 5A molecular sieve to
500mL of methanol; plug the stopper; stand overnight; take the supernatant to
use; calculate the moisture content in the above methanol according to the Karl
Fischer Method specified in GB/T 6283. Then take appropriate amount of
reagent into the inner cavity of the valve to be tested; use the dry rubber stopper
to plug the copper pipe mouth; shake the valve to be tested for 3min above;
unplug the rubber stopper; use the same method to measure the moisture
content in the methanol in the valve to be tested; then the difference of water
content in the methanol before and after shaking is the moisture content in the
inner cavity of the valve to be tested; the result shall meet the requirements of
5.2.1.
d) Chloride ion content test
Pour the eluent into the valve; conduct the oscillating elution; then take out the
eluent and use the ion chromatograph to detect the content; the result shall meet
the requirements of 5.2.1.
6.3.2 Sealing test
The sealing test of the reversing valve is as follows:
a) Water test: before solenoid coil is installed, install the reversing valve on the
device shown in Figure 3; block the air pipes E, C, respectively; connect the air
pipes D and S to the air source, respectively; immerse the entire valve in the
water tank. Then slowly input the pressure to the maximum operating pressure,
and immediately conduct the performance test, it shall meet the requirements of 5.2.7.
6.3.8 High-temperature resistance test
According to the “Test Bd: high temperature test of test-rise of heat-dissipation test
sample” method specified in GB/T 2423.2, place the reversing valve into the test
chamber at 120°C±2°C for 72h; then place it under the atmospheric conditions for 2h;
immediately retest; it shall meet the requirements of 5.2.8.
6.3.9 Cold-thermal cycle resistance test
Under the conditions of no electricity, no load and no pressure, it shall be one cycle for
maintaining for 1h at 120°C±2°C; standing for 0.5h at the room temperature; and
maintaining for 1h at -30°C±2°C. Conduct 5 times cycles. After that, stand for 2h under
room temperature and humidity. It shall meet the requirements of 5.2.9.
6.3.10 Vibration resistance test
Fix the reversing valve onto the vibration test bench; carry out vibration up and down,
left and right for 2h under the conditions of frequency 33Hz, amplitude 2mm; after the
test, it shall meet the requirements of 5.2.10.
6.3.11 Durability test
Install the reversing valve on the device shown in Figure 5. Remove the rotameter.
Block the pipes E, C; connect the pipe S to the atmosphere. Connect the solenoid coil,
automatic counter and timer to the power supply; input 1.5MPa high-pressure gas from
pipe D; reverse the slider back and forth at 6 times/min (lubricant shall be
10cm3/h~15cm3/h); the method is the same as the maximum reversing pressure
difference test. After the test, it shall meet the requirements of 5.2.11.
6.3.12 Corrosion resistance test
6.3.12.1 Salt spray test: under the state of no electricity, no load and no pressure, the
reversing valve test shall be continued for 72h as per GB/T 2423.17; it shall meet the
requirements of 5.2.12.1.
6.3.12.2 Ammonia test: test shall be carried out as per the method specified in GB/T
10567.2. After the test, it shall meet the requirements of 5.2.12.2.
6.3.13 Actually-measured capacity test
The nominal capacity test and calculation method of reversing valve shall be
conducted as per the provisions of Appendix B.
6.3.14 Noise test
Place the test piece at a distance of 30cm from the pickup head of the noise meter;
the test voltage is 85% rated voltage with frequency of 50Hz. The result shall meet the
requirements of 5.2.14 (except for the instantaneous action sound).
6.3.15 Protection level test
The reversing valve coil test shall be carried out as per the method specified in GB
14536.1; it shall meet the requirements of 5.2.15.
6.4 Destructive strength test
Before installing the solenoid coil, install the reversing valve on the device shown in
Figure 3. Block the air pipes E, C totally; then slowly input water pressure from air pipe
D; record the water pressure value when the valve body is broken and leaked; it shall
meet the requirements of 5.3.1.
7 Inspection Rules
7.1 General requirements
Each reversing valve shall leave the factory after being inspected qualified by the
manufacturer (company) quality inspection department according to this Standard and
the technical documents.
7.2 Inspection classification
The reversing valve inspection can be divided into exit-factory inspection, sampling
inspection and type inspection; the inspection items shall be in accordance with the
provisions of Table 9.
diameter of the main pipe.
B.2.2 Measuring position of fluid temperature
The fluid temperature measuring point shall be set on a position on the downstream
side of the outlet nozzle end face that does not exceed 12 times of the inner diameter
of the main pipe.
B.2.3 Size of main pipe
The size of main pipe shall be the same as the size of the inlet and outlet connection
pipes of the reversing valve.
B.3 Test procedures
B.3.1 Start the test bench of refrigeration system; so that it can gradually reach the
nominal condition of the valve specified in 4.3.
B.3.2 Adjust the gas parameters on the exhaust side of the refrigeration system; so
that the pressure of the gas refrigerant passing through the high-pressure inlet pipe
(pipe D) of the reversing valve is maintained at a saturated vapor pressure
corresponding to the condensation temperature of 40°C±0.5°C.
B.3.3 Adjust the gas parameters on the suction side of the refrigeration system; so that
the pressure of the gas refrigerant passing through the low-temperature suction pipe
(pipe S) of the reversing valve is maintained at a saturated vapor pressure
corresponding to the evaporation temperature of 5°C±0.5°C; and the overheat suction
temperature is maintained at 15°C±3°C. When the gas suction temperature deviates
from the above specified temperature, it is allowed to be corrected by conversion.
B.3.4 Adjust the refrigerant flowrate passing through the suction channel of the
reversing valve; so that the pressure drop between the air pipes E and S is increased
from 0.005MPa to 0.035Mpa; the flowrate shall be measured each time 0.005MPa is
increased.
B.3.5 The above measured data shall be plotted as the suction pressure drop-flowrate
performance curve; then calculate the flowrate value, mv, at the nominal condition point
with pressure drop of 0.015MPa of the suction channel of the reversing valve specified
in 4.3.
B.4 Calculation of nominal capacity
The nominal capacity of reversing valve shall be calculated as per the Formula (B.1):
...... Source: Above contents are excerpted from the PDF -- translated/reviewed by: www.chinesestandard.net / Wayne Zheng et al.
|