HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

JB/T 4278.10-2011 PDF English

US$250.00 · In stock · Download in 9 seconds
JB/T 4278.10-2011: Verification procedure for test equipment of rubber plastic wire and cable. Part 1O: Spark tester
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid

JB/T 4278.10: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
JB/T 4278.10-2011English250 Add to Cart 0-9 seconds. Auto-delivery Verification procedure for test equipment of rubber plastic wire and cable. Part 1O: Spark tester Valid
JB/T 4278.10-1993English199 Add to Cart 2 days (Rubber plastic wire and cable test equipment test methods Spark Tester) Obsolete
JB 4278.10-1986EnglishRFQ ASK 3 days (Chinese Industry Standard) Obsolete

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: JB/T 4278.10-2011
      

Similar standards

GB/T 5013.1   GB/T 3956   JB/T 7829   JB/T 4278.1   

JB/T 4278.10-2011: Verification procedure for test equipment of rubber plastic wire and cable. Part 1O: Spark tester


---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/JBT4278.10-2011
JB MECHANICAL INDUSTRY STANDARD ICS 29.060 K 13 Record No.. 32043-2011 Replacing JB/T 4278.10-1993 Verification Procedure for Test Equipment of Rubber Plastic Wire and Cable – Part 10.Spark Tester Issued on: MAY 18, 2011 Implemented on: AUGUST 1, 2011 Issued by. Ministry of Industry and Information Technology of the People’s Republic of China

Table of Contents

Foreword... 3 1 Scope... 5 2 Normative References... 5 3 Verification Items and Technical Requirements... 5 3.1 Overview... 5 3.2 High-voltage power supply... 5 3.3 Test electrode... 6 3.4 Number of spark breakdowns... 6 3.5 Sensitivity... 6 3.6 Stability... 6 3.7 Guard electrode... 7 3.8 Inspection of Test speed... 7 4 Verification Instruments... 7 5 Verification Method... 8 5.1 Verification Items and Verification Procedure... 8 5.2 General inspection... 8 5.3 Inspection of test electrode... 9 5.4 Inspection of guard electrode... 10 5.5 Test voltage calibration... 10 5.6 Measurement of ripple factor of DC test voltage... 11 5.7 Sensitivity test... 12 5.8 Stability test... 12 6 Verification Results and Handling... 13 Verification Procedure for Test Equipment of Rubber Plastic Wire and Cable – Part 10.Spark Tester

1 Scope

This Part of JB/T 4278 specifies the verification items and technical requirements, the verification equipment, the verification methods, and the verification results and handling for spark tester. This Part applies to the verification of spark tester, whether newly manufactured, in use, or after repair.

2 Normative References

The provisions in following documents become the provisions of this Part of JB/T 4278 through reference in this Part. For dated references, the subsequent amendments (excluding corrigendum) or revisions do not apply to this Part, however, parties who reach an agreement based on this Standard are encouraged to study if the latest versions of these documents are applicable. For undated references, the latest edition of the referenced document applies. JB/T 4278.1-2011 Verification procedure for test equipment of rubber plastic wire and cable -Part 1.General

3 Verification Items and Technical Requirements

3.1 Overview In addition to complying with the provisions of this Part, the technical requirements of spark tester shall also comply with the provisions of JB/T 4278.1-2011. 3.2 High-voltage power supply 3.2.1 Spark testers are classified according to their high-voltage power supply into power- frequency spark testers and DC spark testers. The high-voltage power supply is divided into power-frequency high-voltage power supply and DC high-voltage power supply. The power- frequency high-voltage power supply is grounded at one end, while the positive terminal of the DC high-voltage power supply is grounded. The ripple factor of the DC high-voltage power supply shall not exceed 5% of the output DC voltage. 3.2.2 The indication error of the test voltage output of the spark tester shall be ± 5%. 3.3 Test electrode 3.3.1 The bottom of the test electrode may be V-shaped or U-shaped. The effective width of the test electrode shall be no less than the outer diameter of the maximum test object plus 30 mm. 3.3.2 For metal bead chain or ring chain contact electrodes, the chain length shall be greater than the depth of the V-shaped or U-shaped bottom. a) For beads with a diameter of 2.5 mm, the spacing between two adjacent chains shall be no greater than 5 mm. For beads with a diameter of 5.0 mm, the spacing between two adjacent chains shall be no greater than 8 mm. The distance between two adjacent beads in a string shall not exceed 2.5 mm. The beads shall be evenly distributed on the chain. The surface of the beads shall be smooth and free of burrs that could scratch the test object. Each link of the chain shall be flexible and retractable. b) The rings shall be made of wire with a diameter greater than 0.8 mm. The narrow side of the ring shall be no larger than 5 mm. There shall be no fewer than 20 rings per 100 mm length of chain. The rings shall be evenly distributed on the chain. The surface of the rings shall be smooth and free of burrs that could scratch the test object. Each link of the ring shall be flexible and retractable. 3.4 Number of spark breakdowns The breakdown counter shall be able to accurately record the number of spark breakdowns. 3.5 Sensitivity The sensitivity requirement for the spark tester is that when a manual breakdown device is connected between the high-voltage power supply test electrode and ground for inspection, the spark tester shall indicate a breakdown. 3.5.1 When the spark gap of the manual breakdown device is temporarily short-circuited when the power frequency high-voltage power supply is tested at a voltage of 3 kV (rms), the steady current shall not exceed 600 μA. 3.5.2 When the spark gap of the manual breakdown device is temporarily short-circuited when the power frequency high-voltage power supply is tested at a voltage of 5 kV (rms), the steady current shall not exceed 600 μA. 3.6 Stability 3.6.1 At the maximum nominal test voltage, check by a manual breakdown device. The number of times counted by the spark tester's breakdown counter shall be consistent with the actual number of times. 3.6.2 When the high-voltage power supply is a power-frequency high-voltage power supply, a non-defective test sample with the maximum capacitance value shall be placed between the electrodes during this test. If a suitable test sample is unavailable, a 500 pF high-voltage capacitor may be used as a substitute. 3.7 Guard electrode 3.7.1 Both ends shall have grounded guard electrodes. The width of the guard electrode shall be no less than the effective width of the test electrode and no less than 10 mm in length. 3.7.2 The guard electrode shall comply with the provisions of 3.3.2. 3.8 Inspection of Test speed Check the maximum speed of the test sample passing the electrodes according to the method specified in this Standard.

4 Verification Instruments

4.1 Vernier caliper. Range 200 mm, graduation 0.02 mm. 4.2 Steel tape. Range 2000 mm, graduation 1 mm. 4.3 Electrostatic voltmeter. Class 1.5; or high input impedance measuring instrument. Input impedance greater than 100 MΩ, actual measurement error less than 1.5%; or voltage transformer. Class 1.0, AC voltmeter. Class 0.5. 4.4 Artificial breakdown device. 4.4.1 Artificial breakdown devices are divided into two types. those for sensitivity testing and those for stability testing. The artificial breakdown device for stability testing can be safely used at the highest nominal voltage of the spark tester. 4.4.2 The artificial breakdown device for sensitivity testing consists of a metal needle forming a high-voltage test electrode, a microammeter, and the necessary current-limiting resistor. The artificial breakdown device for stability testing consists of a metal needle forming a high- voltage test electrode. 4.4.3 The metal plate and the metal needle rotate relative to each other; with the needle tip passing over the plate at a period of 1 time per second. For power-frequency high-voltage power supply, each test duration is 0.025 s; for DC high-voltage power supply, each test duration is 0.0005 s. The gap between the metal plate and the metal needle is (0.25 ± 0.05) mm, adjusted with a 0.25 mm feeler gauge. 4.4.4 An AC or DC microammeter with an artificial breakdown device for sensitivity testing, with an appropriate range, is used to measure the short-circuit steady-state current at 3 kV for power-frequency high-voltage power supply; or measure the short-circuit steady-state current at 5 kV for DC high-voltage power supply. To limit the short-circuit steady-state current to 600 u – nominal test voltage, in V. 5.7 Sensitivity test 5.7.1 Power-frequency high-voltage power supply 5.7.1.1 Adjust the test voltage to 3 kV. Connect an artificial breakdown device for sensitivity testing between the high-voltage terminal and ground; and connect a current-limiting resistor in series to limit the short-circuit steady-state current to 600 μA or less. 5.7.1.2 Start the artificial breakdown device and rotate it 20 times. The number of times counted by the breakdown counter of the power-frequency spark tester shall be consistent with the actual number of breakdowns. 5.7.2 DC high-voltage power supply 5.7.2.1 Adjust the test voltage to 5 kV. Connect an artificial breakdown device for sensitivity testing between the high-voltage terminal and ground; and connect a current-limiting resistor in series to limit the short-circuit steady-state current to 600 μA or less. 5.7.2.2 Start the artificial breakdown device and rotate it 20 times. The number of times counted by the breakdown counter of the DC spark tester shall be consistent with the actual number of breakdowns. 5.8 Stability test 5.8.1 Power-frequency high-voltage power supply 5.8.1.1 Place a non-defective test sample with the maximum capacitance value between the electrodes as specified. The insulation or sheath of the test sample shall be made of PVC; and the core or armor shall be grounded. If a suitable test sample is unavailable, a 500 pF high-voltage capacitor may be used as a substitute. Connect one end of the high-voltage capacitor to the test electrode, and the other end to ground. 5.8.1.2 Connect a 500 pF high-voltage capacitor between the high-voltage terminal and ground. 5.8.1.3 Connect the artificial breakdown device for the stability testing between the high- voltage terminal and ground. 5.8.1.4 Increase the test voltage to the maximum nominal voltage. 5.8.1.5 Start the artificial breakdown device and rotate it 20 times. The stability of the power- frequency spark tester shall comply with the provisions of 3.6.1. 5.8.1.6 Restart the artificial breakdown device and rotate it 20 times. While the artificial breakdown device is rotating, increase the test voltage from 3 kV to the maximum nominal voltage, adjusting it up and down twice continuously. The number of times counted by the breakdown counter of the power-frequency spark tester shall be consistent with the actual breakdown count. 5.8.1.7 During periodic calibration of the power-frequency spark tester, the stability test may be conducted at the highest voltage used by the spark tester by placing a non-defective test sample of the largest size between the electrodes. 5.8.1.8 During periodic calibration of the power-frequency spark tester, the stability test does not implement the provisions of 5.8.1.2. 5.8.2 DC high-voltage power supply 5.8.2.1 Connect the artificial breakdown device for the stability testing between the high voltage terminal and ground. 5.8.2.2 Increase the test voltage to the maximum nominal voltage. 5.8.2.3 Start the manual breakdown device and rotate it 20 times. The stability of the DC spark tester shall comply with the provisions of 3.6.1. 5.8.2.4 Restart the artificial breakdown device and rotate it 20 times. While the artificial breakdown device is rotating, increase the test voltage from 5 kV to the maximum nominal voltage, adjusting it up and down twice continuously. The number of times counted by the breakdown counter of the DC spark tester shall be consistent with the actual number of breakdowns. NOTE 1.When conducting the tests specified in 5.7 and 5.8, the trigger signal shall be disconnected to ensure that the power supply to the test transformer is not disconnected. NOTE 2.When conducting the test specified in 5.7, the steel needle shall be replaced for each test. The needle tip shall have a taper of no more than 60° and a diameter of no more than 2 mm, or an equivalent needle shall be used. NOTE 3.When conducting the test specified in 5.8, a thicker steel needle may be used to prevent the needle tip from melting, or an HB pencil lead may be used in place of the steel needle.

6 Verification Results and Handling

6.1 A verification certificate shall be issued for spark testers that pass verification; a verification result notice shall be issued for those that fail verification. The certificate shall specify the maximum speed of the test electrode. The cover pages of the verification certificate and verification result notice are provided in Appendixes A and B of JB/T 4278.1-2011. ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of JB/T 4278.10-2011 be delivered?

Answer: The full copy PDF of English version of JB/T 4278.10-2011 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of JB/T 4278.10-2011_English with my colleagues?

Answer: Yes. The purchased PDF of JB/T 4278.10-2011_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- JB/T 4278.10-2011 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

Question 5: Should I purchase the latest version JB/T 4278.10-2011?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version JB/T 4278.10-2011 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

How to buy and download a true PDF of English version of JB/T 4278.10-2011?

A step-by-step guide to download PDF of JB/T 4278.10-2011_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "JB/T 4278.10-2011".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9