GB/T 34013-2017 PDF English
US$125.00 · In stock · Download in 9 secondsGB/T 34013-2017: Dimension of Traction Battery for Electric Vehicles Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedureStatus: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivery | Name of Chinese Standard | Status |
| GB/T 34013-2017 | English | 125 |
Add to Cart
|
0-9 seconds. Auto-delivery
|
Dimension of Traction Battery for Electric Vehicles
| Valid |
Excerpted PDFs (Download full copy in 9 seconds upon purchase)PDF Preview: GB/T 34013-2017
GB/T 34013-2017: Dimension of Traction Battery for Electric Vehicles---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT34013-2017
GB
NATIONAL STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
ICS 43.080
T 47
Dimension of Traction
Battery for Electric Vehicles
Issued on. JULY 12, 2017
Implemented on. FEBRUARY 1, 2018
Issued by. General Administration of Quality Supervision, Inspection and
Quarantine;
Standardization Administration of PRC.
Table of Contents
Foreword... 3
1 Scope... 4
2 Normative References... 4
3 Terms and Definitions... 4
4 General Requirements for Specification Dimension of Battery Products... 5
4.1 Dimensional tolerance requirements... 5
4.2 Dimensional range requirements... 5
5 Specification and Dimension of Secondary Cell... 6
5.1 Specification and dimension of cylindrical cell... 6
5.2 Specification and dimension of prismatic cell... 7
5.3 Specification and dimension of pouch cell... 8
6 Specification and Dimension of Battery Module... 9
Appendix A (Informative) Specification and Dimension of Standard Battery
Case... 11
Foreword
This Standard was drafted as per the rules specified in GB/T 1.1-2009.
This Standard was proposed by Ministry of Industry and Information Technology of
PRC.
This Standard shall be under the jurisdiction of National Technical Committee for
Standardization of Automobile (SAC/TC 114).
Drafting organizations of this Standard. China Automotive Technology & Research
Center, BYD Automobile Industry Co., Ltd., Contemporary Amperex Technology Co.,
Ltd., China Automotive Battery Research Institute Co., Ltd., Zhejiang Tianneng Energy
Technology Co., Ltd., China Association of Automobile Manufactures, 18th Research
Institute of China Electronics Technology Group Corporation, Shanghai Advanced
Traction Battery Systems Co., Ltd., Hefei Guoxuan High-Tech Power Energy Co., Ltd.,
China FAW Group Corporation R&D Center, Beijing New Energy Automobile Co., Ltd.,
Chongqing Changan New Energy Vehicle Co., Ltd., Pan Asia Technical Automotive
Center Co., Ltd., Tianjin EV Energies Co., Ltd., Tianjin Lishen Battery Co., Ltd., Jiangsu
Chunlan Clean Energy Research Institute Co., Ltd., and CITIC Guo’an Mengguli
Power Technology Co., Ltd.
Chief drafting staffs of this Standard. Wang Fang, Meng Xiangfeng, Lian Yubo, Fan
Bin, Xiao Chengwei, Lu Chun, Lv Renzhi, Li Hongwei, Lu Shigang, Chen Weifeng,
Wang Lin, Fan Xiaosong, Shi Liyong, Wang Jian, Dai Weijie, Zhang Hongbo, Wang
Dongsheng, Xu Xingwu, Yang Congjiao, Yin Fangfang, Huang Zhicheng, Yao Zhenhui,
Yuan Changrong, Yang Jianjun, Zhang Na, Wang Chiwei, Zhang Junying, He
Rongfang, and Liu Zhengyao.
Dimension of Traction
Battery for Electric Vehicles
1 Scope
This Standard specifies the specification dimensions of single-cell, module and
standard case of traction battery for electric vehicles (hereinafter referred to as battery).
This Standard is applicable to the lithium-ion battery and metal hydride nickel battery
mounted on the electric vehicles; other type of batteries can be implemented as per
this Standard.
2 Normative References
The following documents are essential to the application of this document. For the
dated documents, only the versions with the dates indicated are applicable to this
document; for the undated documents, only the latest version (including all the
amendments) are applicable to this document.
GB/T 1804 General Tolerances – Tolerances for Linear and Angular Dimensions
without Individual Tolerance Indications
GB/T 2900.41 Electrotechnical Terminology – Primary and Secondary Cells and
Batteries
GB/T 19596 Terminology of Electric Vehicles
3 Terms and Definitions
The following terms and definitions and those ones stipulated in GB/T 2900.41 and
GB/T 19596 are applicable to this document.
3.1 Cylindrical cell
The battery with cylindrical battery hull and connecting element (electrode).
3.2 Prismatic cell
The battery wit rectangular battery hull and connecting element (electrode).
3.3 Pouch cell
The battery with composite file make of battery hull and connecting element (electrode).
3.4 Secondary cell
The basic unit device converting the chemical energy into electrical energy; generally,
it includes electrodes, diaphragms, electrolytes, hulls, terminals; and is designed to be
rechargeable. Also known as battery core.
4 General Requirements for Specification Dimension
of Battery Products
4.1 Dimensional tolerance requirements
Each dimension of secondary cell specified in this Standard shall, as per the limit
deviation of linear size specified in GB/T 1804, select tolerance level with precision of
m.
5 Specification and Dimension of Secondary Cell
5.1 Specification and dimension of cylindrical cell
The structure of cylindrical cell is shown in Figure 1; the Table 2 lists the dimension
series of cylindrical battery.
5.2 Specification and dimension of prismatic cell
The structure of prismatic cell can refer to Figure 2.The Table 3 lists the dimension
series of prismatic cell.
5.3 Specification and dimension of pouch cell
The structure of pouch cell can refer to Figure 3.Table 4 lists the dimension series of
pouch cell.
6 Specification and Dimension of Battery Module
The structure of battery module can refer to Figure 4.Table 5 lists the dimension series
of battery module.
Appendix A
(Informative)
Specification and Dimension of Standard Battery Case
This Appendix recommends the typical dimension of the standard battery case for
electric commercial vehicles; Table A.1 lists the typical specification and dimension of
standard battery case. The structure can refer to Figure A.1.
...... Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Tips & Frequently Asked QuestionsQuestion 1: How long will the true-PDF of English version of GB/T 34013-2017 be delivered?Answer: The full copy PDF of English version of GB/T 34013-2017 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice. Question 2: Can I share the purchased PDF of GB/T 34013-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 34013-2017_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 34013-2017 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.
How to buy and download a true PDF of English version of GB/T 34013-2017?A step-by-step guide to download PDF of GB/T 34013-2017_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD). Step 2: Search keyword "GB/T 34013-2017". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9
|