HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)
Industry Standard: SY, SY/T, SYT
         
SY << ...>> SY
Std ID Description (Standard Title) Detail
SY/T 6030-1994 (Horizontal well logging operations technical regulations) SY/T 6030-1994
SY/T 6030-2003 Specification for logging operation of horizontal wells SY/T 6030-2003
SY/T 6030-2012 Technical specification for logging operation of drill pipe and pipe conveyed SY/T 6030-2012
SY/T 6031-1994 (Scale temperature logging tool maintenance and technical regulations) SY/T 6031-1994
SY/T 6031-2006 The calibration for thermometer, caliper and inclinemeter SY/T 6031-2006
SY/T 6032-1994 Codes of China National Petroleum Corporation (CNPC), enterprises and public institutions SY/T 6032-1994
SY/T 6033-1994 (And diameter scale logging tool maintenance and technical regulations) SY/T 6033-1994
SY/T 6035-1994 Format of Report for Chemical Examination on Exploration Wells SY/T 6035-1994
SY/T 6037-1994 (Exploratory geological logging comprehensive interpretation results Quality Acceptance) SY/T 6037-1994
SY/T 6038-1994 (Single well Carbonate Reservoir Evaluation) SY/T 6038-1994
SY/T 6039-1994 (Carbonate and oxygen isotopic. Phosphoric Acid) SY/T 6039-1994
SY/T 6041-1994 (Benefit Assessment of Oil and Gas Exploration) SY/T 6041-1994
SY/T 6042-1994 Dynamic measurement and calculation for liquefied petroleum gas and stable light hydrocarbon SY/T 6042-1994
SY/T 6044-2004 Emergency requirements of the safety of offshore oil operations SY/T 6044-2004
SY/T 6045-1995 (Natural gas companies with standardized measuring instruments) SY/T 6045-1995
SY/T 6046-1995 (Gas exploration companies with a standardized measuring instruments) SY/T 6046-1995
SY/T 6049-1994 (Cutting and chemical explosions downhole string cutting operating procedures) SY/T 6049-1994
SY/T 6050-1994 (PDC drill bit using the basic rules and wear assessment methods) SY/T 6050-1994
SY/T 6051-1994 (Chinese Industry Standard) SY/T 6051-1994
SY/T 6051-2000 Technical specification of 2D seismic exploration data acquisitionfor mountainous area SY/T 6051-2000
SY/T 6052-1994 (Chinese Industry Standard) SY/T 6052-1994
SY/T 6052-2000 Specification of on-site processing associated with seismic data acquisition SY/T 6052-2000
SY/T 6053-1994 (YKZ480 digital telemetry seismograph test items and technical indicators) SY/T 6053-1994
SY/T 6053-2000 Checking items and technical specifications for YKZ480 telemetry seismic data recorder SY/T 6053-2000
SY/T 6054-1994 (Chinese Industry Standard) SY/T 6054-1994
SY/T 6054-2000 Technical specification for seismic data acquisition in transitional zone SY/T 6054-2000
SY/T 6055-1994 (Oil gravity, magnetic, electrical prospecting maps) SY/T 6055-1994
SY/T 6055-2002 Map of gravity, magnetic, electric and geochemical exploration SY/T 6055-2002
SY/T 6055-2010 Technical specification for petroleum gravity, magnetic, electric and geochemical exploration map SY/T 6055-2010
SY/T 6056-1994 (Drilling aging calculation method) SY/T 6056-1994
SY/T 6057-1994 (Derrick tower transport regulations) SY/T 6057-1994
SY/T 6057-2012 Operation procedures for disassembly/reassembly and skidding of pyramid mast SY/T 6057-2012
SY/T 6058-1994 (Jack-derrick put operating procedures) SY/T 6058-1994
SY/T 6058-2004 Operation procedures for lifting and laying down of self-electing mast SY/T 6058-2004
SY/T 6059-1994 (Derrick dismantling tower operating procedures) SY/T 6059-1994
SY/T 6060-1994 (Derrick tower guy wire system technical conditions) SY/T 6060-1994
SY/T 6061-1994 (Test test voltage controlled operating procedures) SY/T 6061-1994
SY/T 6062-1994 (Oil and gas surface geochemical exploration technology specification) SY/T 6062-1994
SY/T 6062-2008 Technical specification for surface oil and gas geochemical exploration SY/T 6062-2008
SY/T 6063-1994 (Buried steel pipeline coating insulation resistance measurement site technical requirements) SY/T 6063-1994
SY/T 6064-1994 (Pipelines flag set technical requirements) SY/T 6064-1994
SY/T 6064-2011 The operation technical specification for marking main pipeline SY/T 6064-2011
SY/T 6065-1994 (Pipelines capsule sealing technology requirements) SY/T 6065-1994
SY/T 6066-1994 (Crude oil pipeline system efficiency test method) SY/T 6066-1994
SY/T 6066-2003 The method of energy consumption test and calculation for crude oil pipeline transport system SY/T 6066-2003
SY/T 6066-2012 The method of energy consumption test and calculation for crude oil pipeline transport system SY/T 6066-2012
SY/T 6067-1994 (Crude station operation and management regulations Kuguan Network) SY/T 6067-1994
SY/T 6068-1994 (Aerial parts of oil and gas pipelines and ancillary facilities maintenance procedures) SY/T 6068-1994
SY/T 6068-2008 Specification for maintaining of oil and gas pipeline aerial section and attaching installation SY/T 6068-2008
SY/T 6068-2014 Specification for maintaining of aerial section and attaching installations of oil and gas pipelines SY/T 6068-2014
SY/T 6069-1994 (Crude oil pipeline SCADA Technical Specifications) SY/T 6069-1994
SY/T 6069-2005 Code of running technology for the instrument and automatic system of the oil and gas transportation pipeline SY/T 6069-2005
SY/T 6069-2011 Specification of running technology for the instrument and automatic system of the oil and gas pipeline SY/T 6069-2011
SY/T 6070-1994 (Light hydrocarbon reservoir operation and management) SY/T 6070-1994
SY/T 6071-1994 Radio Frequency Analysers for Water-cut of Crude Oil SY/T 6071-1994
SY/T 6072-1994 (Drilling milling shoes) SY/T 6072-1994
SY/T 6072-2009 Milling tools for drilling and servicing SY/T 6072-2009
SY/T 6074-1994 (Modified plant gum product performance measurement methods and) SY/T 6074-1994
SY/T 6078-1994 (Vertical metal tank fabrication and installation work quota) SY/T 6078-1994
SY/T 6078-2005 Labour quota for fabrication and installation of vertical metal tank SY/T 6078-2005
SY/T 6078-2012 Labour quota for fabrication and installation engineering of vertical metal tank SY/T 6078-2012
SY/T 6079-1994 (Oil and gas exploration projects fixed term labor) SY/T 6079-1994
SY/T 6079-2012 Terms of work and personnel quota for oil and gas production SY/T 6079-2012
SY/T 6081-1994 (Production engineering design specification writing) SY/T 6081-1994
SY/T 6081-2012 Specifications for oil production engineering project design SY/T 6081-2012
SY/T 6082-1994 (Oil seismic exploration and maintenance of truck-mounted rig) SY/T 6082-1994
SY/T 6082-2010 Petroleum seismic drilling rig operation and maintenance SY/T 6082-2010
SY/T 6083-1994 (Single acting triplex mud pumps connected to the main consumable size) SY/T 6083-1994
SY/T 6084-1994 (Ground drive screw pump use and maintenance) SY/T 6084-1994
SY/T 6084-2007 Using and maintaining for ground drive progressing cavity pumps SY/T 6084-2007
SY/T 6084-2014 Use and maintain for ground drive progressing cavity pumps SY/T 6084-2014
SY/T 6085-1994 (FSQ-15 type vacuum washed sand foam generator) SY/T 6085-1994
SY/T 6085-2012 Screw foam generator for oil and gas field SY/T 6085-2012
SY/T 6086-1994 (Technical specification for thermal recovery steam generator running) SY/T 6086-1994
SY/T 6086-2012 Technical standard for operation of thermal recovery steam generator SY/T 6086-2012
SY/T 6087-1994 (ESP stuck salvage craft practice) SY/T 6087-1994
SY/T 6087-2012 Process of releasing and fishing for the submersible electric pump SY/T 6087-2012
SY/T 6088-1994 (Deep fracturing technology practice) SY/T 6088-1994
SY/T 6089-1994 (Steam stimulation operating procedures) SY/T 6089-1994
SY/T 6089-2012 Operation procedure for steam huff and puff SY/T 6089-2012
SY/T 6090-1994 Operation Procedure for Steam Huff and Puff SY/T 6090-1994
SY/T 6091-1994 (Ground records gyro inclinometer measurement procedures) SY/T 6091-1994
SY/T 6092-1994 (Positive pulse MWD inclinometer maintenance requirements and testing) SY/T 6092-1994
SY/T 6093-1994 Evaluation Procedure for Pipe-freeing Agents Used in Drilling Fluids SY/T 6093-1994
SY/T 6094-1994 Evaluation Procedure for Lubricants Used in Drilling Fluids SY/T 6094-1994
SY/T 6095-1994 (Chinese Industry Standard) SY/T 6095-1994
SY/T 6095-2000 Technical requirements for programming development plan of lenticular sandstone gas field SY/T 6095-2000
SY/T 6096-1994 (History gas field wells system specification) SY/T 6096-1994
SY/T 6096-2012 The compilation specification of well history of natural gas field SY/T 6096-2012
SY/T 6097-1994 Standards of the contract for a chinese--foreign equity joint venture in petroleum industry SY/T 6097-1994
SY/T 6098-1994 Standards of the contract for a chinese--foreign equity joint venture in petroleum industry SY/T 6098-1994
SY/T 6098-2000 The eatimated methods of natural gas recoverable reserves SY/T 6098-2000
SY/T 6098-2010 The estimated methods of natural gas recoverable reserves SY/T 6098-2010
SY/T 6099-1994 (Block reservoir reserve calculation rules) SY/T 6099-1994
SY/T 6099-2012 Detailed rules and regulations for reserves estimation of fault block oil-gas reservoir SY/T 6099-2012
SY/T 6100-1994 (Oil drilling equipment upgrade and maintenance) SY/T 6100-1994
SY/T 6101-1994 (Gas condensate reservoir phase behavior to determine the technical requirements) SY/T 6101-1994
SY/T 6101-2012 Technical requirements for determining phase behaviors of gas condensate reservoirs SY/T 6101-2012
SY/T 6102-1994 (Chinese Industry Standard) SY/T 6102-1994
SY/T 6102-2000 Specification requirement for dynamic monitoring heavy oil reservoir development by steam injection SY/T 6102-2000