|
Std ID |
Description (Standard Title) |
Detail |
|
SY/T 5775-2002
|
The technical specification of surveys in the seismic prospecting for mountainous area
|
SY/T 5775-2002
|
|
SY/T 5776.1-1995
|
(Injection profile logging operations procedures. Injection Profile)
|
SY/T 5776.1-1995
|
|
SY/T 5776.2-1995
|
(Injection profile logging operations procedures. Steam injection profile)
|
SY/T 5776.2-1995
|
|
SY/T 5777-1995
|
Analytic method for H-nuclear magnetic resonance (HNMR) and C-nuclear magnetic resonance (CNMR)
|
SY/T 5777-1995
|
|
SY/T 5778-1995
|
(Pyrolysis rock geochemical logging specification)
|
SY/T 5778-1995
|
|
SY/T 5778-2008
|
Specifications for logging of oil and gas wells by rock pyrolysis
|
SY/T 5778-2008
|
|
SY/T 5779-1995
|
(Crude total hydrocarbon gas chromatography)
|
SY/T 5779-1995
|
|
SY/T 5779-2008
|
Analytical method of gas chromatography on saturated hydrocarbons of rock chloroform extract and crude oil
|
SY/T 5779-2008
|
|
SY/T 5780-1993
|
(Downhole milling operation rules)
|
SY/T 5780-1993
|
|
SY/T 5781-1993
|
(Metamorphic buried hill reservoir description)
|
SY/T 5781-1993
|
|
SY/T 5782-1993
|
(Sand lens lithologic reservoir reserve calculation rules)
|
SY/T 5782-1993
|
|
SY/T 5782-2010
|
Instructions for estimation of proved reserves for lithologic oil and gas reservoir
|
SY/T 5782-2010
|
|
SY/T 5783.1-2012
|
Specification for injection and production profile logging data processing and interpretation. Part 1: Vertical well
|
SY/T 5783.1-2012
|
|
SY/T 5783.2-2016
|
Specification for injection and production profile logging data processing and interpretation. Part 2-Deviated well
|
SY/T 5783.2-2016
|
|
SY/T 5783-1993
|
(Production logging interpretation rules)
|
SY/T 5783-1993
|
|
SY/T 5783-2002
|
The standardized interpretation procedures of injection and production profile logging
|
SY/T 5783-2002
|
|
SY/T 5784-1993
|
(Calibration and calculation methods perforation depth horizons)
|
SY/T 5784-1993
|
|
SY/T 5785-1993
|
(Petroleum Industry Information Classification and Coding Guidelines)
|
SY/T 5785-1993
|
|
SY/T 5785-1999
|
Directives for information classifying and coding of petroleum industry
|
SY/T 5785-1999
|
|
SY/T 5785-2007
|
Directives for information classifying and coding of petroleum industry
|
SY/T 5785-2007
|
|
SY/T 5788.1-1993
|
(Geology of oil and gas drilling. Comprehensive logging rules)
|
SY/T 5788.1-1993
|
|
SY/T 5788.2-1993
|
(Oil and gas drilling gas geological logging rules)
|
SY/T 5788.2-1993
|
|
SY/T 5788.2-1997
|
Gas logging specifications for oil and gas exploration well
|
SY/T 5788.2-1997
|
|
SY/T 5788.2-2008
|
Gas logging specifications for oil & gas exploration well
|
SY/T 5788.2-2008
|
|
SY/T 5788.3-1993
|
Gas logging specifications for oil & gas exploration well
|
SY/T 5788.3-1993
|
|
SY/T 5788.3-1999
|
Geological logging regulations for oil and gas exploration wells
|
SY/T 5788.3-1999
|
|
SY/T 5788.3-2008
|
Specifications for geological logging of oil and gas wells
|
SY/T 5788.3-2008
|
|
SY/T 5788.3-2014
|
Specifications for geological logging of oil and gas wells
|
SY/T 5788.3-2014
|
|
SY/T 5789-1993
|
(Induced flow wells operating procedures)
|
SY/T 5789-1993
|
|
SY/T 5790-1993
|
(Explosion repair sleeve technology practice law)
|
SY/T 5790-1993
|
|
SY/T 5790-2002
|
Process of casing reformation and strengthening seal
|
SY/T 5790-2002
|
|
SY/T 5791-1993
|
Process of casing reformation and strengthening seal
|
SY/T 5791-1993
|
|
SY/T 5791-2007
|
The operating procedures for lifting and laying down of hydraulic workover rigmast
|
SY/T 5791-2007
|
|
SY/T 5792-1993
|
(Oil (gas) wells, sidetracking operation rules of construction)
|
SY/T 5792-1993
|
|
SY/T 5792-2003
|
Technical demands on whisper operation and well completion
|
SY/T 5792-2003
|
|
SY/T 5793-1993
|
(Mechanical recovery system efficiency testing and calculation methods)
|
SY/T 5793-1993
|
|
SY/T 5794-1993
|
(Drilling Fluid sulfonated asphalt class evaluation method)
|
SY/T 5794-1993
|
|
SY/T 5794-2010
|
Evaluation method for asphalt products used in drilling fluids
|
SY/T 5794-2010
|
|
SY/T 5795-1993
|
(Beam pumping unit installation size, with the size of wearing parts)
|
SY/T 5795-1993
|
|
SY/T 5796-1993
|
Assessment method for flocculant
|
SY/T 5796-1993
|
|
SY/T 5797-1993
|
Performance assessment method for oil-in-water emulsion breaker
|
SY/T 5797-1993
|
|
SY/T 5799-1993
|
(Profile control agent performance evaluation method of two-liquid method)
|
SY/T 5799-1993
|
|
SY/T 5801-1993
|
(Petroleum exploration gravity field data, acceptance)
|
SY/T 5801-1993
|
|
SY/T 5801-1999
|
Rules for check and acceptance to gravity and magnetic field date in petroleum prospecting
|
SY/T 5801-1999
|
|
SY/T 5802-1993
|
Rules for check and acceptance to gravity and magnetic field date in petroleum prospecting
|
SY/T 5802-1993
|
|
SY/T 5804-1993
|
(Car repair labor quota)
|
SY/T 5804-1993
|
|
SY/T 5805-1996
|
(Transmission and distribution lines engineering installation labor quota)
|
SY/T 5805-1996
|
|
SY/T 5805-2010
|
Installation work ration for power transmission and distribution
|
SY/T 5805-2010
|
|
SY/T 5806-2000
|
Oil and gas stratigraphic code
|
SY/T 5806-2000
|
|
SY/T 5806-2012
|
Oil and gas stratigraphic code
|
SY/T 5806-2012
|
|
SY/T 5807-1993
|
(A process of hydraulic piston pumps work well since under)
|
SY/T 5807-1993
|
|
SY/T 5807-2012
|
Technology method for hydraulic piston pump trip operation and test
|
SY/T 5807-2012
|
|
SY/T 5810-1993
|
(Continuous gas lift production wells design and construction work)
|
SY/T 5810-1993
|
|
SY/T 5810-2003
|
Design and downhole operation of continuous gas lift
|
SY/T 5810-2003
|
|
SY/T 5811-1993
|
General Technical Specification for Silicate Series Plugging Agent
|
SY/T 5811-1993
|
|
SY/T 5812-1993
|
(Chinese Industry Standard)
|
SY/T 5812-1993
|
|
SY/T 5812-1996
|
Wellhead Equipment for Annular Testing
|
SY/T 5812-1996
|
|
SY/T 5813-1993
|
(Hydraulic piston pump well pump top manometry procedures)
|
SY/T 5813-1993
|
|
SY/T 5814-1993
|
(Drilling with humic acid treatment agent effective determination of the content of humic)
|
SY/T 5814-1993
|
|
SY/T 5814-2008
|
Determination of the content of humic acid in drilling fluids additives containing the same
|
SY/T 5814-2008
|
|
SY/T 5815-1993
|
(Rock pore volume compressibility test methods)
|
SY/T 5815-1993
|
|
SY/T 5815-2008
|
Test method of rock pore volume compressibility
|
SY/T 5815-2008
|
|
SY/T 5815-2016
|
Measurement method for rock pore volume compressibility
|
SY/T 5815-2016
|
|
SY/T 5816-1993
|
Test method of rock pore volume compressibility
|
SY/T 5816-1993
|
|
SY/T 5817-1993
|
(Directional coring method)
|
SY/T 5817-1993
|
|
SY/T 5819-1993
|
(Gravity prospecting technical regulations)
|
SY/T 5819-1993
|
|
SY/T 5819-2002
|
Technical specification for ground gravity
|
SY/T 5819-2002
|
|
SY/T 5819-2010
|
Technical specification for land gravity survey
|
SY/T 5819-2010
|
|
SY/T 5819-2016
|
(Technical specification for on - earth gravity magnetic prospecting)
|
SY/T 5819-2016
|
|
SY/T 5820-1993
|
(Technical specification oil magnetotelluric sounding method)
|
SY/T 5820-1993
|
|
SY/T 5820-1999
|
Technical specifications for magnetotelluric sounding
|
SY/T 5820-1999
|
|
SY/T 5820-2014
|
Technical rule for magnetotelluric sounding acquistion method in oil exploration
|
SY/T 5820-2014
|
|
SY/T 5821-1993
|
(Carbonate reservoir water shutoff technology practice organic blocking agent)
|
SY/T 5821-1993
|
|
SY/T 5821-2012
|
Water shutoff technology with organic plugging agent for carbonate reservoir
|
SY/T 5821-2012
|
|
SY/T 5822-1993
|
Classification and Denomination of Oilfield Chemicals
|
SY/T 5822-1993
|
|
SY/T 5824-1993
|
Testing Method for Drill Pipe Classification
|
SY/T 5824-1993
|
|
SY/T 5825-1993
|
(Mechanical downhole temperature thermometer test)
|
SY/T 5825-1993
|
|
SY/T 5825-2007
|
Procedures of temperature test by a electronic down-hole thermometer
|
SY/T 5825-2007
|
|
SY/T 5825-2014
|
Procedures of temperature test with down-hole electronic thermometers
|
SY/T 5825-2014
|
|
SY/T 5826-1993
|
(Hydraulic piston pump maintenance procedures)
|
SY/T 5826-1993
|
|
SY/T 5826-2012
|
Maintenance and service procedure for hydraulic piston pump
|
SY/T 5826-2012
|
|
SY/T 5827-1993
|
(Stuck salvage craft practice)
|
SY/T 5827-1993
|
|
SY/T 5827-2005
|
Process of releasing and fishing
|
SY/T 5827-2005
|
|
SY/T 5827-2013
|
Process of releasing and fishing
|
SY/T 5827-2013
|
|
SY/T 5828-1993
|
(Petroleum Geophysical surveying result Quality Inspection Rules)
|
SY/T 5828-1993
|
|
SY/T 5828-1999
|
The details of quality test for surveys result in petroleum geophysical exploration
|
SY/T 5828-1999
|
|
SY/T 5829-1993
|
Naming rules for development well number of oil and gas field
|
SY/T 5829-1993
|
|
SY/T 5829-2016
|
The recommended regulation for naming oil&gas development well
|
SY/T 5829-2016
|
|
SY/T 5830-1993
|
(Set layer volcanic reservoir description method)
|
SY/T 5830-1993
|
|
SY/T 5831-1993
|
(Fracturing cenospheres diverting agent SL-KX-1)
|
SY/T 5831-1993
|
|
SY/T 5832-1993
|
(Sucker rod centralizer)
|
SY/T 5832-1993
|
|
SY/T 5832-2002
|
Sucker rod centralizer
|
SY/T 5832-2002
|
|
SY/T 5832-2009
|
The sucker rod string centralizer
|
SY/T 5832-2009
|
|
SY/T 5834-1993
|
(Low solids control fluid performance measurement and evaluation methods)
|
SY/T 5834-1993
|
|
SY/T 5834-2007
|
Performance specifications and measuring methods of low-solid killing fluid
|
SY/T 5834-2007
|
|
SY/T 5834-2014
|
Performance specifications and measuring methods of low-solid killing fluid
|
SY/T 5834-2014
|
|
SY/T 5835-1993
|
(Fracturing wellhead valve)
|
SY/T 5835-1993
|
|
SY/T 5835-2011
|
Wellhead ball valve for fracturing
|
SY/T 5835-2011
|
|
SY/T 5836-1993
|
(Design and construction practices in deep fracturing)
|
SY/T 5836-1993
|
|
SY/T 5837-1993
|
(Equipment shuttle valve with pneumatic components of oil drilling test methods)
|
SY/T 5837-1993
|