|
Std ID |
Description (Standard Title) |
Detail |
|
SY/T 5275-2012
|
Eccentric injection tools
|
SY/T 5275-2012
|
|
SY/T 5275-2014
|
Distributor for water-injection
|
SY/T 5275-2014
|
|
SY/T 5276-2000
|
Test method for flexural strength, compression strength and air permeability of chemical sand consolidation in man-made core
|
SY/T 5276-2000
|
|
SY/T 5277-2000
|
Classification and coding method for water shutoff agents used in oil field
|
SY/T 5277-2000
|
|
SY/T 5280-2000
|
General technical conditions for crude oil demulsifiers
|
SY/T 5280-2000
|
|
SY/T 5281-1991
|
(Chinese Industry Standard)
|
SY/T 5281-1991
|
|
SY/T 5281-2000
|
Bottle test method for the demulsification performance of crude oil demulsifiers
|
SY/T 5281-2000
|
|
SY/T 5283-1991
|
(Oil drilling equipment pneumatic components Quality Grading)
|
SY/T 5283-1991
|
|
SY/T 5285-1991
|
(Workover shoes and wear shoes with a milling)
|
SY/T 5285-1991
|
|
SY/T 5286-1991
|
(To tackle)
|
SY/T 5286-1991
|
|
SY/T 5287-1991
|
(Blender technical conditions)
|
SY/T 5287-1991
|
|
SY/T 5287-2000
|
Fracturing blender truck
|
SY/T 5287-2000
|
|
SY/T 5288-2000
|
The main link dimension of the drilling and production hoisting equipment
|
SY/T 5288-2000
|
|
SY/T 5289-1991
|
(Fracturing effect evaluation method)
|
SY/T 5289-1991
|
|
SY/T 5289-2000
|
Evaluating method for hydraulic fracturing effect of oil well
|
SY/T 5289-2000
|
|
SY/T 5289-2008
|
Fracturing design, treatment and post-fracturing effect evaluation methods of oil, gas and injection wells
|
SY/T 5289-2008
|
|
SY/T 5289-2016
|
Fracturing design, treatment and post-frac effect evaluation methodsof oil, gas and injection well
|
SY/T 5289-2016
|
|
SY/T 5290-2000
|
Tool joints for drill pipe for oil or natural gas well
|
SY/T 5290-2000
|
|
SY/T 5298-1991
|
(Chinese Industry Standard)
|
SY/T 5298-1991
|
|
SY/T 5298-2002
|
Marine loading arms
|
SY/T 5298-2002
|
|
SY/T 5299-1991
|
(Cable bridge plug operating procedures)
|
SY/T 5299-1991
|
|
SY/T 5299-2009
|
Code for well line bridge plug and cementing operation
|
SY/T 5299-2009
|
|
SY/T 5299-2016
|
(Technical specification for special perforation operation for cable transportation)
|
SY/T 5299-2016
|
|
SY/T 5301-1987
|
(Oil drilling machinery products general technical conditions of ordinary carbon steel and alloy steel castings)
|
SY/T 5301-1987
|
|
SY/T 5302-1987
|
(Oil drilling machinery products with gray iron castings General technical conditions)
|
SY/T 5302-1987
|
|
SY/T 5303-1987
|
(Oil drilling machinery products with ductile iron castings General technical conditions)
|
SY/T 5303-1987
|
|
SY/T 5304-1987
|
(Oil drilling machinery products by forging general technical conditions)
|
SY/T 5304-1987
|
|
SY/T 5305-1987
|
(Oil drilling machinery welding pieces of general technical conditions)
|
SY/T 5305-1987
|
|
SY/T 5306-1987
|
(Oil drilling machinery products general technical conditions with machining)
|
SY/T 5306-1987
|
|
SY/T 5307-1987
|
(Oil drilling machinery products Assembly General technical conditions)
|
SY/T 5307-1987
|
|
SY/T 5308-1987
|
(Oil drilling machinery products with paint general technical conditions)
|
SY/T 5308-1987
|
|
SY/T 5309-1987
|
(Oil drilling machinery products with packaging technology)
|
SY/T 5309-1987
|
|
SY/T 5310-1987
|
(Oil drilling machinery castings with general technical conditions)
|
SY/T 5310-1987
|
|
SY/T 5312.17-1987
|
(Oil and gas exploration well fracturing proppant name database encoding code)
|
SY/T 5312.17-1987
|
|
SY/T 5312.18-1987
|
(Oil and gas exploration well log database coding project code)
|
SY/T 5312.18-1987
|
|
SY/T 5312.19-1987
|
(Oil and gas exploration well log interpretation database encoding parameter code)
|
SY/T 5312.19-1987
|
|
SY/T 5313-1993
|
Terms of Well drilling engineering
|
SY/T 5313-1993
|
|
SY/T 5313-2006
|
Vocabulary of well drilling engineering
|
SY/T 5313-2006
|
|
SY/T 5314-1995
|
(Onshore seismic data acquisition quality inspection and acceptance conditions)
|
SY/T 5314-1995
|
|
SY/T 5314-2002
|
Inspecting and acceptin for land seismic exploration data acquisition quality
|
SY/T 5314-2002
|
|
SY/T 5314-2004
|
Technical specification of seismic data acquisition
|
SY/T 5314-2004
|
|
SY/T 5314-2011
|
Technical specifications for seismic data acquisition on land
|
SY/T 5314-2011
|
|
SY/T 5317-1988
|
(Crude oil pipeline automatic sampling)
|
SY/T 5317-1988
|
|
SY/T 5317-2006
|
Petroleum liquids - Automatic pipeline sampling
|
SY/T 5317-2006
|
|
SY/T 5318-1991
|
(200-J-type pressure gauge)
|
SY/T 5318-1991
|
|
SY/T 5320-1993
|
(Chinese Industry Standard)
|
SY/T 5320-1993
|
|
SY/T 5320-2000
|
JZ weight indicator
|
SY/T 5320-2000
|
|
SY/T 5322-1988
|
(Chinese Industry Standard)
|
SY/T 5322-1988
|
|
SY/T 5322-2000
|
Design method of casing string strength
|
SY/T 5322-2000
|
|
SY/T 5323-1992
|
(Kill manifold and choke manifold)
|
SY/T 5323-1992
|
|
SY/T 5323-2004
|
Choke and kill systems
|
SY/T 5323-2004
|
|
SY/T 5323-2016
|
Petroleum and natural gas industries. Drilling and production equipment. Choke and kill equipment
|
SY/T 5323-2016
|
|
SY/T 5324-1994
|
(Prestressed insulated tubing)
|
SY/T 5324-1994
|
|
SY/T 5324-2013
|
Pre-Stress Insulated Tubing
|
SY/T 5324-2013
|
|
SY/T 5325-1988
|
(Through tubing perforating technical regulations)
|
SY/T 5325-1988
|
|
SY/T 5325-2005
|
Specifications for well perforating operation quality control
|
SY/T 5325-2005
|
|
SY/T 5325-2013
|
The technical specifications for perforating operation
|
SY/T 5325-2013
|
|
SY/T 5326.1-2012
|
Technical specification for sidewall coring. Part 1: Impact
|
SY/T 5326.1-2012
|
|
SY/T 5326-1993
|
(Coring technical regulations)
|
SY/T 5326-1993
|
|
SY/T 5326-2002
|
Technology procedure for sidewall coring of impact
|
SY/T 5326-2002
|
|
SY/T 5327-1988
|
(Chinese Industry Standard)
|
SY/T 5327-1988
|
|
SY/T 5327-1999
|
Radioactive species carrier tracer logging
|
SY/T 5327-1999
|
|
SY/T 5327-2008
|
Specification for radioactive species carrier tracer logging
|
SY/T 5327-2008
|
|
SY/T 5328-1988
|
(Chinese Industry Standard)
|
SY/T 5328-1988
|
|
SY/T 5328-1996
|
Wellhead assembly for thermal recovery
|
SY/T 5328-1996
|
|
SY/T 5329-1994
|
(Clastic reservoir water quality of the recommended indicators and analysis methods)
|
SY/T 5329-1994
|
|
SY/T 5329-2012
|
Water quality standard and practice for analysis of oilfield injecting waters in clastic reservoirs
|
SY/T 5329-2012
|
|
SY/T 5330-1995
|
(Land-dimensional seismic data acquisition technical specifications)
|
SY/T 5330-1995
|
|
SY/T 5330-2003
|
Technical specification of land 2D seismic data acquisition
|
SY/T 5330-2003
|
|
SY/T 5331-1994
|
(Petroleum seismic interpretation maps)
|
SY/T 5331-1994
|
|
SY/T 5331-2000
|
Interpretation maps for petroleum seismic exploration
|
SY/T 5331-2000
|
|
SY/T 5331-2008
|
Interpretation maps for petroleum seismic exploration
|
SY/T 5331-2008
|
|
SY/T 5331-2016
|
(Key words of oil seismic exploration)
|
SY/T 5331-2016
|
|
SY/T 5332-1997
|
Technical specifications for land 2-D seismic exploration data processing
|
SY/T 5332-1997
|
|
SY/T 5332-2005
|
Technical specifications for land seismic exploration data processing
|
SY/T 5332-2005
|
|
SY/T 5332-2011
|
Technical specifications for land seismic exploration data processing
|
SY/T 5332-2011
|
|
SY/T 5333-1996
|
(Drilling engineering design format)
|
SY/T 5333-1996
|
|
SY/T 5333-2012
|
Format for drilling engineering design
|
SY/T 5333-2012
|
|
SY/T 5334-1996
|
(Casing centralizers mounting pitch calculation method)
|
SY/T 5334-1996
|
|
SY/T 5335-1988
|
(Borehole washer)
|
SY/T 5335-1988
|
|
SY/T 5336-1996
|
Method of core routine analysis
|
SY/T 5336-1996
|
|
SY/T 5336-2006
|
Practices for core analysis
|
SY/T 5336-2006
|
|
SY/T 5337-1988
|
(Gravel pack tool)
|
SY/T 5337-1988
|
|
SY/T 5337-2008
|
Gravel packing tool
|
SY/T 5337-2008
|
|
SY/T 5337-2016
|
Technical requirements for gravel packing tools
|
SY/T 5337-2016
|
|
SY/T 5338-1988
|
(Chinese Industry Standard)
|
SY/T 5338-1988
|
|
SY/T 5338-2000
|
Recommended practice for sand consolidation of strengthen borehole wall
|
SY/T 5338-2000
|
|
SY/T 5338-2011
|
Practice for sand control technology of strength and artificial borehole well
|
SY/T 5338-2011
|
|
SY/T 5339-1988
|
(Chinese Industry Standard)
|
SY/T 5339-1988
|
|
SY/T 5339-2000
|
Recommended practic e for sand control technology of artificial borehole wall
|
SY/T 5339-2000
|
|
SY/T 5340-1988
|
(Chinese Industry Standard)
|
SY/T 5340-1988
|
|
SY/T 5340-2000
|
Gravel paching method for sand control in cased hole
|
SY/T 5340-2000
|
|
SY/T 5340-2012
|
Practice for gravel pack of sand control
|
SY/T 5340-2012
|
|
SY/T 5341-1988
|
(Chinese Industry Standard)
|
SY/T 5341-1988
|
|
SY/T 5341-2002
|
Sesbania gum for fracturing
|
SY/T 5341-2002
|
|
SY/T 5343-1994
|
Sesbania gum for fracturing
|
SY/T 5343-1994
|
|
SY/T 5343-2013
|
Determination method for testing the amount of filtrate invading core
|
SY/T 5343-2013
|
|
SY/T 5345-1999
|
Oil-water relative permeability measurement
|
SY/T 5345-1999
|
|
SY/T 5345-2007
|
Test method for two phase relative permeability in rock
|
SY/T 5345-2007
|
|
SY/T 5346-1994
|
(Determination of rock capillary pressure curve)
|
SY/T 5346-1994
|