|
Std ID |
Description (Standard Title) |
Detail |
|
SY/T 5138-1992
|
(Single acting triplex mud pumps)
|
SY/T 5138-1992
|
|
SY/T 5139-1993
|
(Li Yun put derrick car)
|
SY/T 5139-1993
|
|
SY/T 5139-2008
|
Derrick building truck
|
SY/T 5139-2008
|
|
SY/T 5140-1987
|
(Well the car through general technical conditions)
|
SY/T 5140-1987
|
|
SY/T 5141-1993
|
Hydraulic torque converter with centrifugal turbine used for drilling rig
|
SY/T 5141-1993
|
|
SY/T 5141-2002
|
Hydraulic torque converter with centrifugal turbine used for drill rig
|
SY/T 5141-2002
|
|
SY/T 5141-2010
|
Hydraulic torque converter with centrifugal turbine used for drilling rig
|
SY/T 5141-2010
|
|
SY/T 5142-1995
|
(Oil rig with 190 series diesel engine overhaul technical conditions)
|
SY/T 5142-1995
|
|
SY/T 5143-1998
|
Structures of tubing pump with combined liners and basic dimensions of primary parts
|
SY/T 5143-1998
|
|
SY/T 5144-1997
|
Drilling collar
|
SY/T 5144-1997
|
|
SY/T 5144-2007
|
Drill collar
|
SY/T 5144-2007
|
|
SY/T 5144-2013
|
Drill collar
|
SY/T 5144-2013
|
|
SY/T 5146-1997
|
Heavy weight drill pipe
|
SY/T 5146-1997
|
|
SY/T 5146-2006
|
Integral heavy weight drill pipe
|
SY/T 5146-2006
|
|
SY/T 5146-2012
|
Integral Heavy Weight Drill
|
SY/T 5146-2012
|
|
SY/T 5146-2014
|
Heavy weight drill pipe
|
SY/T 5146-2014
|
|
SY/T 5147-2000
|
Magnetic fishing tools
|
SY/T 5147-2000
|
|
SY/T 5148-1999
|
Pneumatic components for petroleum drilling and production equipment - One-way restrictor valve
|
SY/T 5148-1999
|
|
SY/T 5149-1997
|
Test method of quick exhaust valve of pneumatic components for petroleum drilling and production equipment
|
SY/T 5149-1997
|
|
SY/T 5150-1994
|
(Chinese Industry Standard)
|
SY/T 5150-1994
|
|
SY/T 5150-2000
|
Multiple stage cementer
|
SY/T 5150-2000
|
|
SY/T 5150-2013
|
Multiple stage cementer
|
SY/T 5150-2013
|
|
SY/T 5151-1993
|
(Releasing tube upside down fishing)
|
SY/T 5151-1993
|
|
SY/T 5153.3-1995
|
(Reservoir rock wettability contact angle measurement method)
|
SY/T 5153.3-1995
|
|
SY/T 5153-1999
|
Maesurement of reservoir rock wettability
|
SY/T 5153-1999
|
|
SY/T 5153-2007
|
Test method of reservoir rock wettability
|
SY/T 5153-2007
|
|
SY/T 5154-1999
|
Sampling procedures for hydrocarbon reservoir fluids
|
SY/T 5154-1999
|
|
SY/T 5154-2014
|
Sampling procedures for hydrocarbon reservoir fluids
|
SY/T 5154-2014
|
|
SY/T 5158-1991
|
(Petroleum Exploration and digital logging tools technical conditions)
|
SY/T 5158-1991
|
|
SY/T 5158-2008
|
Technical specification of computerized logging system for petroleum exploration
|
SY/T 5158-2008
|
|
SY/T 5161-1987
|
(Chinese Industry Standard)
|
SY/T 5161-1987
|
|
SY/T 5161-2002
|
Determination of some metal elements in rocks by atomic absorption spectrometry
|
SY/T 5161-2002
|
|
SY/T 5162-1997
|
Analytical method of rock sample by scanning electron microscope
|
SY/T 5162-1997
|
|
SY/T 5162-2014
|
Analytical method of rock sample by scanning electron microscope
|
SY/T 5162-2014
|
|
SY/T 5163-1995
|
(The relative amounts of sedimentary clay minerals X-ray diffraction analysis)
|
SY/T 5163-1995
|
|
SY/T 5163-2010
|
Analysis method for clay minerals and ordinary non. Clay minerals in sedimentary rocks by the X-ray diffraction
|
SY/T 5163-2010
|
|
SY/T 5164-1999
|
Tricone bit
|
SY/T 5164-1999
|
|
SY/T 5164-2008
|
Tricone bit
|
SY/T 5164-2008
|
|
SY/T 5164-2016
|
Roller cone drill bits
|
SY/T 5164-2016
|
|
SY/T 5165-1987
|
(SQ3 type sampler)
|
SY/T 5165-1987
|
|
SY/T 5165-2013
|
Downhole sampler
|
SY/T 5165-2013
|
|
SY/T 5166-1995
|
(Electronic dynamometer)
|
SY/T 5166-1995
|
|
SY/T 5166-2005
|
(Chinese Industry Standard)
|
SY/T 5166-2005
|
|
SY/T 5166-2007
|
Technical specifications of pumping well tester
|
SY/T 5166-2007
|
|
SY/T 5167.4-1993
|
(Submersible pump use and maintenance)
|
SY/T 5167.4-1993
|
|
SY/T 5167.5-1993
|
(Submersible pumps matching accessories and tools)
|
SY/T 5167.5-1993
|
|
SY/T 5168-1999
|
Classifying and coding system for the parts of oil drilling and production equipment
|
SY/T 5168-1999
|
|
SY/T 5170-1998
|
Petroleum and natural gas industries - specification for wire rope
|
SY/T 5170-1998
|
|
SY/T 5170-2008
|
Steel wire ropes for the petroleum and natural gas industries
|
SY/T 5170-2008
|
|
SY/T 5170-2013
|
Steel wire ropes for the petroleum and natural gas industries
|
SY/T 5170-2013
|
|
SY/T 5171-1993
|
(Petroleum Geophysical measurement specifications)
|
SY/T 5171-1993
|
|
SY/T 5171-1999
|
The codes for surveys in the petroleum geophysical exploration
|
SY/T 5171-1999
|
|
SY/T 5171-2003
|
Specification for surveying in petroleum geophysical exploration
|
SY/T 5171-2003
|
|
SY/T 5171-2011
|
Specifications of survey for petroleum geophysical prospecting on land
|
SY/T 5171-2011
|
|
SY/T 5172-1987
|
(Chinese Industry Standard)
|
SY/T 5172-1987
|
|
SY/T 5172-1996
|
(Straight downhole BHA design methods)
|
SY/T 5172-1996
|
|
SY/T 5172-2007
|
Specifications for trajectory control in straight holes
|
SY/T 5172-2007
|
|
SY/T 5176-1993
|
(Downhole labor quota)
|
SY/T 5176-1993
|
|
SY/T 5176-2007
|
Work quota for downhole operation
|
SY/T 5176-2007
|
|
SY/T 5176-2014
|
Work quota for downhole operation
|
SY/T 5176-2014
|
|
SY/T 5179-1993
|
(Oil machining work quota)
|
SY/T 5179-1993
|
|
SY/T 5179-2012
|
Labor quota for petroleum manufacturing
|
SY/T 5179-2012
|
|
SY/T 5181-1987
|
(Chinese Industry Standard)
|
SY/T 5181-1987
|
|
SY/T 5181-2000
|
Recommended practice for gravel pack of sand control of the naked hole
|
SY/T 5181-2000
|
|
SY/T 5182-1987
|
(Welded stainless steel screens around)
|
SY/T 5182-1987
|
|
SY/T 5182-2008
|
Wire-wrapped stainless steel screen pipe
|
SY/T 5182-2008
|
|
SY/T 5183-1987
|
(Chinese Industry Standard)
|
SY/T 5183-1987
|
|
SY/T 5183-2000
|
Evaluation method for sand control effect of oil well
|
SY/T 5183-2000
|
|
SY/T 5183-2016
|
(Evaluation Method of Sand Prevention Effect of Oil Well)
|
SY/T 5183-2016
|
|
SY/T 5184-1997
|
Quartz sand for sand control in oil, gas wells and water injection wells
|
SY/T 5184-1997
|
|
SY/T 5184-2006
|
Recommended practices for testing sand used in gravel packing operations
|
SY/T 5184-2006
|
|
SY/T 5185-1987
|
Petroleum and natural gas industries - - specification for wire rope
|
SY/T 5185-1987
|
|
SY/T 5185-2008
|
Evaluation methods of water-based carrying fluid for gravel packing sand control
|
SY/T 5185-2008
|
|
SY/T 5185-2016
|
Evaluation methods of water-based carrying fluid for gravel packing sand control
|
SY/T 5185-2016
|
|
SY/T 5187-1997
|
Technical requirements for repairs completely of beam pumping unit
|
SY/T 5187-1997
|
|
SY/T 5188-1996
|
(Pump maintenance and use of the recommended practices)
|
SY/T 5188-1996
|
|
SY/T 5188-2012
|
Recommended practice for care and use of subsurface pumps
|
SY/T 5188-2012
|
|
SY/T 5189-1987
|
(Hydraulic piston pump use, maintenance)
|
SY/T 5189-1987
|
|
SY/T 5190-1991
|
(Comprehensive logging technical conditions)
|
SY/T 5190-1991
|
|
SY/T 5190-2007
|
Technical specifications for petroleum mud logging unit
|
SY/T 5190-2007
|
|
SY/T 5190-2016
|
(Technical condition of petroleum integrated logging tool)
|
SY/T 5190-2016
|
|
SY/T 5191-1993
|
(GC logging tool technical conditions)
|
SY/T 5191-1993
|
|
SY/T 5191-2011
|
Gas chromatograph mud logging unit
|
SY/T 5191-2011
|
|
SY/T 5192-1991
|
(Seismic dedicated cable)
|
SY/T 5192-1991
|
|
SY/T 5192-2008
|
Seismic exploration cable
|
SY/T 5192-2008
|
|
SY/T 5196-1995
|
(Sucker rod overshot)
|
SY/T 5196-1995
|
|
SY/T 5197-1995
|
(Workover with slip teeth block spear)
|
SY/T 5197-1995
|
|
SY/T 5198-1996
|
Grease Thread for Drilling Tools
|
SY/T 5198-1996
|
|
SY/T 5199-1997
|
Thread compounds for casing, tubing and line pipe
|
SY/T 5199-1997
|
|
SY/T 5200-2002
|
Drill-stem subs
|
SY/T 5200-2002
|
|
SY/T 5200-2012
|
Drill-stem subs
|
SY/T 5200-2012
|
|
SY/T 5202-1991
|
(Petroleum workover technical conditions)
|
SY/T 5202-1991
|
|
SY/T 5202-2004
|
Petroleum workover rig
|
SY/T 5202-2004
|
|
SY/T 5203-1991
|
Basic Environment Test of Instrument for Petroleum Exploration and Development - General
|
SY/T 5203-1991
|
|
SY/T 5204-1991
|
(Petroleum downhole instrument metal insulation bottle general technical conditions)
|
SY/T 5204-1991
|
|
SY/T 5204-1997
|
General technical condition of metal heat-insulated flask of petroleum downhole tool
|
SY/T 5204-1997
|
|
SY/T 5207-1987
|
(Oil drilling equipment pneumatic components cylinder piston type test)
|
SY/T 5207-1987
|
|
SY/T 5208-2000
|
Main hoisting equipment for petroleum workover
|
SY/T 5208-2000
|
|
SY/T 5211-1993
|
(High-pressure and high-pressure pipe joint activities elbow)
|
SY/T 5211-1993
|
|
SY/T 5211-2003
|
Fracturing unit
|
SY/T 5211-2003
|