Home Cart Quotation Policy About-Us
www.ChineseStandard.net
Database: 221938 (17 Apr 2026)
SEARCH
Path: Home > SY/T Standards > Page 32

Industry Standard: SY/T

Prev << ...>> Next
Std ID Description (Standard Title)
SY/T 6098-2010 The estimated methods of natural gas recoverable reserves
SY/T 6107-2010 Test method of reservoir thermophysical parameters
SY/T 6451-2010 The technical specifications for exploring well logging data processing and interpreting
SY/T 6786-2010 The calibration for microspherically focused logging tool
SY/T 6790-2010 The specification for operation of cased hole resistivity logging
SY/T 6791-2010 General requirements and testing methods of firing head system of oil and gas well
SY/T 6792-2010 The technical specifications for the rotatory sidewall coring
SY/T 6796-2010 Norms and legends of drawing for oil and gas field development
SY/T 5254-2009 Logging data processing symbol
SY/T 5299-2009 Code for well line bridge plug and cementing operation
SY/T 5440-2009 Technical specifications for natural gas well testing
SY/T 5464-2009 Computational method for logging and perforating quality index
SY/T 5503-2009 Test method of chloride content in rock
SY/T 5542-2009 Test method for reservoir fluid physical properties
SY/T 5633-2009 Format for prtroleum logging charts
SY/T 6105-2009 Technical requirements for feasible evaluation of oil field development
SY/T 6161-2009 Specifications for the process and interpretation of logging data in natural gas reservoir
SY/T 6168-2009 The classification of gas pool
SY/T 6177-2009 Economic evaluation requirements of overall development program and adjusting program for gas field
SY/T 6180-2009 Code for operation of C/O spectrum logging
SY/T 6413-2009 Code for computerized logging system operation
SY/T 6751-2009 The technical specifications for operation of underbalanced wireline logging
SY/T 6752-2009 The specification for operation of nuclear magnetic resonance imaging logging
SY/T 6753-2009 General requirements and testing method of detonating tube for oil and gas well
SY/T 6754-2009 General requirements and testing method of echo bullet for oil and gas well
SY 6350-2008 The safe technique procedures for muti-stage self-controlling safe system of oil-gas well perforation
SY/T 5327-2008 Specification for radioactive species carrier tracer logging
SY/T 5579.1-2008 Reservoir description method. Part 1: General provisions
SY/T 5579.2-2008 Reservoir description method. Part 2: Fragmental reservoir
SY/T 5579.4-2008 Reservoir description method. Part 4: Special lithology reservoir
SY/T 5602-2008 The criteria on data acquisition about evaluation well in clastic reservoir
SY/T 5692-2008 Specification for testing operation of wireline formation test
SY/T 5693-2008 Specification for calibration of the C/O spectrum logging tool
SY/T 5815-2008 Test method of rock pore volume compressibility
SY/T 6106-2008 Technical requirement of preparing gas field development plan
SY/T 6110-2008 The method for gas reservoir description
SY/T 6162-2008 Format for perforation and side-wall coring charts
SY/T 6171-2008 The geological technical specification of production testing for gas reservoir
SY/T 6182-2008 Calibration for logging tool on production well profile
SY/T 6273-2008 Testing method of electric detonators for oil and gas well
SY/T 6411.1-2008 General requirements and testing method of detonating cord for oil and gas well. Part 1: General requirements
SY/T 6411.2-2008 General requirements and testing method of detonating cord for oil and gas well. Part 1: Testing method
SY/T 6511-2008 Economic evaluating technical requirement for oil field development project and adjustment project
SY/T 6712-2008 Laboratory measurement method of complex resistivity of core sample
SY/T 6744-2008 Regulation of numerical reservoir simulation
SY/T 5153-2007 Test method of reservoir rock wettability
SY/T 5345-2007 Test method for two phase relative permeability in rock
SY/T 5361-2007 Code for the cut-and-thread fishing operation
SY/T 5385-2007 Measurement and calculation methods of rock resistivity parameters in labor
SY/T 6111-2007 Technical requirements for preparing of development plan adjustment for gas reservoir
SY/T 6253-2007 Specification of horizontal well perforation
SY/T 6490-2007 Specification for normalization measurement of core NMR parameter in laboratory
SY/T 6681-2007 Form for hardcopy presentation of log acquisition data
SY/T 6683-2007 Technical requirement of development project design for polymer flooding
SY/T 6684-2007 Technical requirements for business evaluation of natural gas fiel
SY/T 6691-2007 Specification for operation plan of logging
SY/T 6692-2007 Technical code for logging while drilling
SY/T 6693-2007 Evaluating method for polymer flooding development effect
SY/T 5336-2006 Practices for core analysis
SY/T 5691-2006 The specification for the interpretation of wireline formation tester data
SY/T 6031-2006 The calibration for thermometer, caliper and inclinemeter
SY/T 6102-2006 Oil field development monitoring and data requirement
SY/T 6172-2006 Technical specification for well testing of oilfield
SY/T 6310-2006 Technical requirements for feasible evaluation of gas field development
SY/T 6315-2006 Relative permeability and displacement efficiency test under the condition of high temperature for heavy oil reservoir
SY/T 6641-2006 Specification for cement bond logging data processing and interpreting technology
SY/T 6647-2006 Technical requirements of upper evaluation for productivity construction of new gas fields
SY/T 5346-2005 Rock capillary pressure measurement
SY/T 5851-2005 Technical requirements for compilation of adjusting development design for oilfield
SY/T 6170-2005 The technical indexes of natural gas production and relative calculation methods
SY/T 6366-2005 The technical indexes of oil production and relative calculation methods
SY/T 6103-2004 Measurement of rock pore structure Method of image analysis
SY/T 6108-2004 Technical specification of performance analysis for carbonate gas reservoir
SY/T 6176-2004 Technical regulation of data collection on development well of gas reservoir
SY/T 6595-2004 The oilfield Business assessment of technical requirements
SY/T 5588-2003 Profile modification technology and result evaluation in water injection well
SY/T 5842-2003 Technical requirements of compiling the development plan of sandstone oil field development geology and reservoir engineering
SY/T 6106-2003 Technical requirement for preparing of development plan for gas reservoir
SY/T 6573-2003 Measurement method for minimum miscibility pressure by slim tube test
SY/T 6574-2003 Technical requirement of oil field development project upper evaluation
SY/T 6575-2003 Technical regulation for EOR screening guide
SY/T 6576-2003 Recommended practices for evaluation of polymers used in enhanced oil recovery
SY/T 10023.2-2000 The Recommended Method of Offshore Oil/Gas Field Development Project Economic Evaluation Part 2: Co-operative Offshore Oil/Gas Field
SY/T 6095-2000 Technical requirements for programming development plan of lenticular sandstone gas field
SY/T 6098-2000 The eatimated methods of natural gas recoverable reserves
SY/T 6424-2000 Analytical method of alkaline/surfactant/polymer flooding system
SY/T 6425-2000 Technical requirements for compilation of adjusting development design for thermal recovery of heavy oil reservoir-steam huff and puff
SY/T 6434-2000 Analysis for natural gas reservoir fluids physical properties
SY/T 6437-2000 Sampling method and quality requirement of core sample for core analysis
SY/T 6490-2000 Specification for core NMR parametermeasurement in laboratory
SY/T 10023.1-1999 Recommended Method of Offshore Oil/Gas Field Development project Economic Evaluation -Part 1: Self Financed Offshore Oil/Gas Field
SY/T 10013-1998 (Sandstone offshore gas field development feasibility evaluation guidelines)
SY/T 10014-1998 Guide to programing overall development program for offshore sandstone gas fields
SY/T 10011-1997 (The overall development program for offshore oil field guide)
SY/T 6312-1997 Measurement of sandstone grain size and pore character -Method of image analysis
SY/T 5117-1996 (Rock-Eval analysis)
SY/T 5125-1996 Transmission light-fluorescence kerogen maceral group identification and type division
SY/T 5336-1996 Method of core routine analysis
SY/T 6191-1996 (Heavy oil reservoir description of the technical requirements)
SY/T 6193-1996 (Heavy oil steam injection calibration method developed recoverable reserves)
Refund Policy Privacy Policy Terms of Service