|
Std ID |
Description (Standard Title) |
|
DL/T 5512-2016
|
Specification for Detection on Thermal Engineering and Design of Instrument in Thermal Power Plant
|
|
DL/T 5513-2016
|
Regulation of Water Saving Design in Power Plant
|
|
DL/T 5516-2016
|
Code for design of layout of central control room and electronic equipment room of fossil-fired power plant
|
|
DL/T 5518-2016
|
Code for design of communication optical cable in substation and power plant of electric engineering
|
|
DL/T 5519-2016
|
Design guidelines for construction organization general outline of fossil-fired power plant
|
|
DL/T 5521-2016
|
Guide for design of variable frequency control system of fossil-fired power plants
|
|
DL/T 5736-2016
|
Technical Regulations of Chimney (Flue) Anticorrosive Engineering Construction in Thermal Power Plant
|
|
DL/T 5737-2016
|
Technical specification for construction of circular coal bunker of thermal power plants
|
|
DL/T 5745-2016
|
Code of bills of quantities and valuation for electric power construction works
|
|
DL/T 5028.1-2015
|
Stabdard for Drawing of Electric Power Engineering - Part 1: General Regulation
|
|
DL/T 5028.2-2015
|
Standard for drawing of electric power engineering - Part 2: mechanical
|
|
DL/T 5028.3-2015
|
Standard for drawing of electric power engineering - Part 3: electric, instrumentation and control
|
|
DL/T 5028.4-2015
|
Standard for drawing of electric power engineering - Part 4: civil work
|
|
DL/T 5507-2015
|
Regulation for Basic Data and Depth of the Hydraulic Design for Fossil-fired Power Plant
|
|
DL/T 5508-2015
|
Code for design of gas-fired distributed energy station
|
|
DL 5068-2014
|
Code for design of chemistry of power plant
|
|
DL 5713-2014
|
Technical guide for insulation construction of thermal equipments and piping in thermal power plant
|
|
DL 5714-2014
|
Technical code for constructing anticorrosion and insulation of thermal equipment and pipeline of fossil fuel power plant
|
|
DL/T 5044-2014
|
Technical Code for Designing DC System of Power Projects
|
|
DL/T 5097-2014
|
Technical code for investigation of geotechnical engineering of ash yard of fossil fuel power plant
|
|
DL/T 5153-2014
|
Technical code for the design of auxiliary power system of fossil-fired power plant
|
|
DL/T 5487-2014
|
Guidelines for compiling estimation and segregating items of IGCC power plant projects
|
|
DL/T 5488-2014
|
Code for design of dry ash disposal area of fossil-fired power plant
|
|
DL/T 5489-2014
|
Technical code for design of inlet flow passage of circulating water pump house of fossil-fired power plant
|
|
DL/T 5491-2014
|
Technical code for the design of AC uninterruptible power system of power engineering
|
|
DL/T 5095-2013
|
Technical code for design load of main building in fossil-fired power plant and the conventional island of nuclear power plant
|
|
DL/T 5226-2013
|
Technical code for the design of network computerized monitoring and control system in power plant
|
|
DL/T 5287-2013
|
Construction technology guide for the assembly and erection of the steel towers of ±800kV overhead transmission line
|
|
DL/T 5295-2013
|
Code for the unit commissioning quality acceptance and evaluation of fossil power construction projects
|
|
DL/T 5301-2013
|
Construction technology guide for tension stringing of overhead transmission line when over-crossing live lines without cross frame
|
|
DL/T 5461.10-2013
|
Regulations for content and depth of detailed design documents of fossil-fired power plant. Part 10: Architecture
|
|
DL/T 5461.11-2013
|
Regulations for content and depth of detailed design documents of fossil-fired power plant. Part 11: Civil structure
|
|
DL/T 5461.12-2013
|
Regulations for content and depth of detailed design documents of fossil-fired power plant. Part 12: HVAC
|
|
DL/T 5461.13-2013
|
Regulations for content and depth of detailed design documents of fossil-fired power plant. Part 13: Hydraulic processes
|
|
DL/T 5461.14-2013
|
Regulations for content and depth of detailed design documents of fossil-fired power plant. Part 14: Hydraulic structure
|
|
DL/T 5461.15-2013
|
Regulations for content and depth of detailed design documents of fossil-fired power plant. Part 15: Communication
|
|
DL/T 5461.16-2013
|
Regulations for content and depth of detailed design documents of fossil-fired power plant. Part 16: Information system
|
|
DL/T 5461.2-2013
|
Regulations for content and depth of detailed design documents of fossil-fired power plant. Part 2: General plan and transportation
|
|
DL/T 5461.3-2013
|
Regulations for content and depth of detailed design documents of fossil-fired power plant. Part 3: Turbine/boiler and auxiliaries
|
|
DL/T 5461.4-2013
|
Regulations for content and depth of detailed design documents of fossil-fired power plant. Part 4: Coal handling
|
|
DL/T 5461.5-2013
|
Regulations for content and depth of detailed design documents of fossil-fired power plant. Part 5: Ash handling
|
|
DL/T 5461.6-2013
|
Regulations for content and depth of detailed design documents of fossil-fired power plant. Part 6: Chemical
|
|
DL/T 5461.7-2013
|
Regulations for content and depth of detailed design documents of fossil-fired power plant. Part 7: Flue gas desulphurization
|
|
DL/T 5461.8-2013
|
Regulations for content and depth of detailed design documents of fossil-fired power plant. Part 8: Electrical
|
|
DL/T 5461.9-2013
|
Regulations for content and depth of detailed design documents of fossil-fired power plant. Part 9: Instrumentation and control
|
|
DL/T 5464-2013
|
Guidelines for primary design budgetary estimate of fossil fired power project
|
|
DL/T 5465-2013
|
Guidelines for construction detail design estimate of fossil fired power project
|
|
DL/T 5466-2013
|
Guidelines for feasibility study cost estimation of fossil fired power project
|
|
DL/T 5470-2013
|
Guidelines for item segregation of construction budget for thermal power generation project
|
|
DL/T 5473-2013
|
Guidelines for item segregation of construction budget for gas-steam combined cycles power plant projct
|
|
DL/T 5474-2013
|
Guidelines for item segregation of construction budget for biomass power generation project
|
|
DL/T 5475-2013
|
Guidelines for item segregation of construction budget for garbage power generation project
|
|
DL/T 5480-2013
|
Technical code for the design of flue gas denitration of fossil fired power plant
|
|
DL/T 5482-2013
|
Standard for terms of integrated gasification combined
|
|
DL/T 255-2012
|
Energy consumption evaluation technical regulation for coal-fired power plant
|
|
DL/T 291-2012
|
Drafting guide for information classification and code of electric power marketing business
|
|
DL/T 5136-2012
|
Technical code for the design of electrical secondary wiring in fossil-fired power plants and substations
|
|
DL/T 5159-2012
|
Technical code for geophysical exploration of electric power engineering
|
|
DL/T 5446-2012
|
Regulation for content and depth of feasibility study report of power system dispatch automation engineering
|
|
DL/T 5447-2012
|
Regulation for content and depth of communication system design of power system
|
|
DL/T 5455-2012
|
Technical code for the design of power supply and air supply system of instrumentation and control in fossil-fired power plant
|
|
DL/T 5461.1-2012
|
Regulations for content and depth of detailed design documents of fossil-fired power plant. Part 1: General
|
|
DL/T 5444-2010
|
Regulation of content and profunidity of power system design
|
|
DL/T 1117-2009
|
The specification of welding procedure qualification for Conventional Island of nuclear power station
|
|
DL/T 1118-2009
|
The code of welding for conventional island of nuclear power plant
|
|
DL/T 5427-2009
|
Regulation for content and depth of primary design document of fossil fuel power plants
|
|
DL/T 5439-2009
|
Design regulations of content and profundity for hydro and fossil fuel power plant connecting to the system
|
|
DL/T 5156.1-2002
|
Electric power engineering surveying drawings Part 1: Surveying
|
|
DL/T 5156.2-2002
|
Electric power engineering surveying drawings Part 2: Geotechnical engineering
|
|
DL/T 5156.3-2002
|
Electric power engineering surveying drawings Part 3: Hydrometeorology
|
|
DL/T 5156.4-2002
|
Electric power engineering surveying drawings Part 4: Hydrogeology
|
|
DL/T 5156.5-2002
|
Electric power engineering surveying drawings Part 5: Geophysical prospecting
|
|
DL/T 5158-2002
|
Technical code of meteorological surveying for electrical power projects
|
|
DL/T 5159-2002
|
Technical code for geophysical exploration electric power engineering
|
|
DL/T 5160-2002
|
Technical code of rock and soil description for geotechnical investigation of electric power plant
|
|
DL/T 5069-1996
|
Code of erection and acceptance for electric power construction-Section of radiographic examination of butt wended joints of pressure steels pipes and tubes
|
|
DL 5028-1993
|
Standard for electric power engineering drawings
|
|
DL 5009.1-1992
|
Code of Safety Operation in Power Engineering Construction - Part 1: Steam Power Plants
|
|
DL 5011-1992
|
The Code of Erection and Acceptance of Eiectirc power Construction Section of Steam Turbine Set
|
|
DL/T 5113.10-2024
|
(Quality rating standard for unit projects of hydropower and water conservancy infrastructure projects - Part 10: Asphalt concrete engineering)
|
|
DL/T 5251-2024
|
(Technical specification for defect detection and evaluation of hydraulic concrete structures)
|
|
DL/T 5884-2024
|
(Cable crane installation and acceptance specifications)
|
|
DL/T 5886-2024
|
(Test procedures for geosynthetics for hydropower and water conservancy projects)
|
|
DL/T 5888-2024
|
(Technical specification for construction of hydraulic deep mixing and milling anti-seepage wall in water conservancy and hydropower projects)
|
|
DL/T 5889-2024
|
(Technical specifications for electricity safety in construction of hydropower and water conservancy projects)
|
|
DL/T 1104-2024
|
(Potentiometer type instrument measuring instrument)
|
|
DL/T 1135-2024
|
(Potentiometer displacement meter)
|
|
DL/T 2571.6-2024
|
(Maintenance regulations for public auxiliary equipment of hydropower stations - Part 6: Powerhouse bridge machine)
|
|
DL/T 2749-2024
|
(Guidelines for acceptance test of pump-turbine model in pumped storage power station)
|
|
DL/T 2759-2024
|
(Guidelines for Technical Supervision of Environmental Protection of Hydropower Projects)
|
|
DL/T 2762-2024
|
(Guidelines for Sediment Regulation of Cascade Reservoirs)
|
|
DL/T 5055-2024
|
(Technical specification for fly ash used in hydraulic concrete)
|
|
DL/T 5111-2024
|
(Specification for construction supervision of hydropower and water conservancy projects)
|
|
DL/T 5356-2024
|
(Geotechnical test procedures for hydropower projects)
|
|
DL/T 5357-2024
|
(Specification for geochemical analysis and testing of hydropower engineering)
|
|
DL/T 5368-2024
|
(Rock mass testing procedures for hydropower projects)
|
|
DL/T 5433-2024
|
(Test procedures for hydraulic rolled concrete)
|
|
DL/T 5870-2024
|
(Specification for sediment model test of hydropower projects)
|
|
DL/T 5871-2024
|
(Technical specification for hydraulic model test of fish passage structures in hydropower projects)
|
|
DL/T 5873-2024
|
(Technical specification for surface coating protection of concrete structures in hydropower and water conservancy projects)
|