Std ID |
Description (Standard Title) |
|
DL/T 5365-2006
|
Rules of content depth for electdc power data communication network project preliminary design
|
|
DL/T 790.4511-2006
|
Distribution automation using distribution line carrier systems. Part 4-511: Data communication protocols. Systems management-CIASE protocol
|
|
DL/T 790.4512-2006
|
Distribution automation using distrbution line carrier systems. Part 4-512: Data communication protocols. Systems management using profile DL/T 790.51. Management Information Base (MIB)
|
|
DL/T 860.91-2006
|
Communication networks and systems in substations Part 9-1: Specific communication service mapping(SCSM)-Sampled valuws over serial unidirectional multidrop point to point link
|
|
DL/Z 860.2-2006
|
Communication networks and systems in substations. Part 2: Glossary
|
|
DL/T 5002-2005
|
Specifications for the design of dispatch automation in district power networks
|
|
DL/T 5003-2005
|
Specifications for the design of dispatch automation in electric power systems
|
|
DL/T 5025-2005
|
Technical code of engineering design for digital microwave communication project of electric power system
|
|
DL/T 790.433-2005
|
Distribution automation using distribution line carrier system. Part 4-33: Data communication protocols. Data link layer. Connection oriented protocol
|
|
DL/T 989-2005
|
Reliability evaluation code for DC power transmission system
|
|
DL/Z 790.52-2005
|
Distribution automation using distribution line carrier system. Part 5-2: Lower layer profilers. Frequency shift keying (FSK) profile
|
|
DL/Z 981-2005
|
Power system conmtrol and associated communication Data and communication security
|
|
DL/T 5188-2004
|
Design code of vibration isolation of auxiliary machine foundation in fossil fuel power plant
|
|
DL/T 5189-2004
|
Technical code for designing power line carry communication
|
|
DL/T 634.56-2004
|
Telecontrol equipment and systems Part 5-6: Test procedures for IEC 60870-5 protocols series
|
|
DL/T 790.432-2004
|
Distribution automation using distribution line carrier systems Part 4-32: Data communication protocols. Data link layer. Logical link control(LLC)
|
|
DL/T 790.441-2004
|
Distribution automation using distribution line carrier systems Part 4: Data communication protocols. Section 41: Application protocols. Distribution line message specification
|
|
DL/T 790.442-2004
|
Distribution automation using distribution line carrier system. Part 4-42: Data communication protocols. Application protocols. Application layer
|
|
DL/T 860.3-2004
|
Communication networks and systems in substations. Part 3: General requirements
|
|
DL/T 860.4-2004
|
Communication networks and systems in substations. Part 4: System and project management
|
|
DL/T 860.72-2004
|
Communication networks and systems in substations Part 7-2: Basic communication structure for substation and feeder equipment Abstract communication service interfaces
|
|
DL/T 860.73-2004
|
Communication networks and systems in substations Part 7-3: Basic communication structure for substation and feeder equipment Common data classes
|
|
DL/T 866-2004
|
The guide for selection and calculation of current transformers and voltage transformers
|
|
DL/T 888-2004
|
Electric power system dispatching exchange specification of DTMF signalling
|
|
DL/T 891-2004
|
Thermal product quality of combine steam-power generation plant
|
|
DL/Z 634.56-2004
|
Telecontrol equipment and systems Part 5-6: Test procedures for IEC 60870-5 protocols series
|
|
DL/Z 790.53-2004
|
Distribution automation using distribution line carrier systems. Part 5-3: Lower layer profilers Spread spectrum adaptive wideband (SS-AW) profile
|
|
DL/Z 790.54-2004
|
Distribution automation using distribution line carrier systems. Part 5-4: Lower layer profilers. Multi-carrier modulation (MCM) profile
|
|
DL/Z 790.55-2004
|
Distribution automation using distribution line carrier systems. Part 5-5: Lower layer profilers Spread spectrum-fast frequency hopping (SS-FFH) profile
|
|
DL/Z 860.1-2004
|
Communication networks and systems in substations. Part 1: Introduction and overview
|
|
DL/Z 885-2004
|
Power system control and associated communications. Deregulated energy market communications
|
|
DL/T 526-2002
|
General specification for automatic bus transfer equipment
|
|
DL/T 634.5101-2002
|
Telecontrol equipment and systems. Part 5: Transmission protocols. Section 101: Companion standard for basic telecontrol tasks (IEC 60870-5-101: 2002, IDT)
|
|
DL/T 790.321-2002
|
Distribution automation using distribution line carrier systems. Part 3-21: Mains signalling requirements MV phase-to-phase isolated capacitive coupling devices
|
|
DL/T 790.322-2002
|
Distribution automation using distribution line carrier systems. Part 3-22: Mains signalling requirements MV phase-to-earth and screen-to-earth intrustive coupling devices
|
|
DL/T 790.41-2002
|
Distribution automation using distribution line carrier systems. Part 4: Data communication protocols. Section 1: Reference model of communication system
|
|
DL/T 790.51-2002
|
Distribution automation using distribution line carrier systems. Part 5-1: Lower layer profiles. The spread frequency shift keying (S-FSK) profile
|
|
DL/T 814-2002
|
Function specification of distribution automation systems
|
|
DL/T 831-2002
|
Guide on selection of furnace characteristic parameters for large pulverized coal fired power boilers
|
|
DL/Z 790.14-2002
|
Distribution automation using distribution line carrier systems. Part 1-4: General considerations. Identification of data transmission parameters concerning medium and low-voltage distribution mains
|
|
DL 755-2001
|
Guide on security and stability for power system
|
|
DL/T 789-2001
|
Implementation and acknowledgement of auto-dispatching system rooted in country power network
|
|
DL/T 790.31-2001
|
Distribution automation using distribution line carrier systems. Part 3: Mains signalling requirements. Section 1: Frequency bands and output levels
|
|
DL/Z 790.11-2001
|
Distribution automation using distribution line carrier systems. Part 1: General considerations. Section 1: Distribution automation system architecture
|
|
DL/Z 790.12-2001
|
Distribution automation using distribution line carrier systems. Part 1: General considerations. Section 2: Guide for specification
|
|
DL/T 459-2000
|
Specifictions of D.C supply cabinet in power system
|
|
DL/T 5118-2000
|
Plan design guide for the rural electric power network
|
|
DL/T 5119-2000
|
Design code for the unattended miniaturization substation of rural electric network
|
|
DL/T 5120-2000
|
DC System design code for small electric power project
|
|
DL/T 719-2000
|
Telecontrol equipment and systems. Part 5: Transmission protocol. Section 102: companion standard for the transmission of integrated totals in electric power systems
|
|
DL/T 667-1999
|
Telecontrol equipment and systems. Part 5: Transmission protocols. Section 103: Companion standard for the information interface of protection equipment
|
|
DL/T 688-1999
|
Intertripping equipment for power system
|
|
DL/T 630-1997
|
Technical requirement for RTU with a.c electrical quantities input, discrete sampling
|
|
DL/T 634-1997
|
Telecontrol equipment and systems. Part 5: Transmission protocols. Section 101 companion standard for basic telecontrol tasks
|
|
DL/T 635-1997
|
The specification for dispatching auromation to the country power network
|
|
DL/T 598-1996
|
The technical specifications for automatic exchange network of electric power system communication
|
|
DL 548-1994
|
Rules of operational management of lightning protection at signal stations of electrical power system
|
|
DL/T 544-1994
|
Rules of management of communication in electric power system
|
|
DL/T 545-1994
|
Rules of operational management of microwave communication in electric power system
|
|
DL/T 546-1994
|
Rules of operational management of carrier communication in electric power system
|
|
DL/T 547-1994
|
Rules of operational management of fibre optic communication in electric power system
|
|
DL/T 550-1994
|
Functional specifications for local power network dispatching automation
|
|
DL 516-1993
|
Code for Operation and Administration of Power Dispatching Automation System
|
|
DL 476-1992
|
Application-level protocol for real-time data traffic in electric power system
|
|
DL 451-1991
|
CDT Telecontrol Communication Protocol
|
|
DL 5002-1991
|
Specifications for the Design of Dispatching Automation in District Electric Power Systems
|
|
DL 5003-1991
|
Specifications for the Design of Dispatching Automation in Electric Power Systems
|
|
DL 411-1991
|
Embedded analog screen for electric power dispatch General technical conditions
|
|
DL/T 1147-2009
|
Mobile fall arrester on power altitude working
|
|
DL/T 1242-2022
|
Technical guide for live working on UHV DC transmission line
|
|
DL 778-2001
|
Sleeves of insulating material for live working
|
|
DL/T 1197-2012
|
Specification of on-line condition monitoring system for hydro-generator set
|
|
DL/T 2583-2022
|
Guidelines for the whole process engineering consulting service of power grid project
|
|
DL/T 2114-2020
|
Technical guide for configuring reactive power compensation equipment of power system
|
|
DL/T 2115-2020
|
Testing technical specification for voltage monitor
|
|
DL/T 2169-2020
|
Calculating method of energy saving for flue gas waste heat cascade utilization system in thermal power plants
|
|
DL/T 1421-2015
|
Repairing and protection technical guidelines for erosion damage of desulfurization slurry circulating pump passage components
|
|
DL/T 2433-2021
|
(Technical Guidelines for AC-DC Hybrid Medium-Voltage Distribution Network)
|
|
DL/T 2449-2021
|
(Technical guidelines for flexible substations)
|
|
DL/T 779-2021
|
(Insulated rope tools for live working)
|
|
DL/T 2793-2024
|
(Technical Guidelines for Laser Cladding Strengthening of Steam Turbine Blades)
|
|
DL/T 2800-2024
|
(Guidelines for Energy Saving Assessment of Circulating Fluidized Bed Boilers)
|
|
DL/T 2806-2024
|
(Technical Guidelines for Intelligent Distribution Areas)
|
|
DL/T 2816-2024
|
(Detailed Rules for Preliminary Assessment of Occupational Disease Hazards in Construction Projects of Thermal Power Generation Enterprises)
|
|
DL/T 5764-2024
|
(Thermal Power Project Quality Evaluation Standard)
|
|
DL/T 1246-2024
|
(Guidelines for Condition Maintenance Management of Hydropower Station Equipment)
|
|
DL/T 1759-2024
|
(Technical Specifications for Demand Response Systems for Electric Load Aggregation Service Providers)
|
|
DL/T 1839.2-2024
|
(Data specification for power reliability management information system - Part 2: Power transmission and transformation facilities)
|
|
DL/T 1867-2024
|
(Electricity demand response information exchange specification)
|
|
DL/T 241-2024
|
The documents collection and archives arrangement technical specifications of construction projects
|
|
DL/T 2728-2024
|
(Coding Guidelines for Signal Identification Systems in Hydropower Stations)
|
|
DL/T 2735-2024
|
(Technical requirements for clock synchronization system in hydropower plants)
|
|
DL/T 2738-2024
|
(Guidelines for technical supervision of automation systems in hydropower stations)
|
|
DL/T 2741-2024
|
(Technical Guidelines for Life Assessment of Vertical Hydro-generators)
|
|
DL/T 2748-2024
|
(Digital Delivery Standard for Building Information Modeling of Pumped Storage Power Stations)
|
|
DL/T 2757-2024
|
(Technical Supervision Guidelines for Biomass Power Generation Boilers)
|
|
DL/T 2764-2024
|
(Technical Guidelines for Extending the Life of Thermal Power Units)
|
|
DL/T 2766-2024
|
(Guidelines for Calculation of Power Grid Technology Loss Reduction and Electricity Savings)
|
|
DL/T 2776-2024
|
(Technical specification for coal consumption determination test of coal-fired units)
|
|
DL/T 2825.2-2024
|