US$759.00 · In stock · Download in 9 secondsHJ/T 255-2006: Technical guidelines for environmental protection in power plant capital construction project for check and accept of completed project
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| HJ/T 255-2006 | English | 759 | Add to Cart | 5 days [Need to translate] | Technical guidelines for environmental protection in power plant capital construction project for check and accept of completed project |
Click to Preview a similar PDF
Basic data
| Standard ID | HJ/T 255-2006 (HJ/T255-2006) |
| Description (Translated English) | Technical guidelines for environmental protection in power plant capital construction project for check and accept of completed project |
| Sector / Industry | Environmental Protection Industry Standard (Recommended) |
| Classification of Chinese Standard | Z62 |
| Classification of International Standard | 13.020 |
| Word Count Estimation | 26,255 |
| Date of Issue | 2006-03-09 |
| Date of Implementation | 2006-05-01 |
| Quoted Standard | GB 3095; GB 3096; GB 5468; GB 8978; GB 12348; GB 12349; GB 13223; GB 13271; GB 16297; GB 18599; GB/T 16157; HJ/T 48; HJ/T 55; HJ/T 75; HJ/T 76; DL 414 |
| Issuing agency(ies) | Ministry of Ecology and Environment |
| Summary | This standard specifies the thermal power plant and acceptance of completed construction projects to determine the scope of work, performance standards selected monitoring sites layout, sampling, analytical methods, quality control and quality assurance, monitoring programs and monitoring of the preparation of reports and other technical requirements. This standard applies to a single output in the 65t/h above except layer burning stove and furnace stoker boiler thermal power plants outside, a variety of power generation capacity of the pulverized coal boiler, oil-fired boilers, gas turbines of various capacities and power plants generating boilers using other fuels and cogeneration acceptance of completed construction projects, environmental impact assessment, preliminary design (environmental topics), after the completion of construction projects daily technical supervision and management of monitoring can be performed with reference to the technical specifications. |