GBZ35482-2017 English PDFUS$874.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GBZ35482-2017: Wind turbines -- Time-based availability Status: Valid
Basic dataStandard ID: GB/Z 35482-2017 (GB/Z35482-2017)Description (Translated English): Wind turbines -- Time-based availability Sector / Industry: National Standard Classification of Chinese Standard: F11 Classification of International Standard: 27.180 Word Count Estimation: 46,418 Date of Issue: 2017-12-29 Date of Implementation: 2018-07-01 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China GBZ35482-2017: Wind turbines -- Time-based availability---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Wind turbines-Time-based availability ICS 27.180 F11 National Standardization Guidance Technical Document of the People's Republic of China Wind turbine time availability (IEC /T S61400-26-1.2011, Windturbines-Part 26-1. Time- Basedavailabilityforwindturbinegeneratingsystems, IDT) Released on.2017-12-29 2018-07-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Administration issued ContentForeword I Introduction II 1 Scope 1 2 Normative references 1 3 Terms, definitions and abbreviations 1 3.1 Terms and Definitions 1 3.2 Abbreviations 2 4 Information Model 3 4.1 Overview 3 4.2 Information Category 3 4.3 Limit 4 4.4 Information Category Priority 4 5 Available information 5 5.1 Running 6 5.1.1 Power generation 7 5.1.2 Non-power generation 8 5.2 Non-operation 12 5.2.1 Regular maintenance 12 5.2.2 Planned Improvements 13 5.2.3 Forced shutdown 14 5.2.4 Suspension of work 14 5.3 Force Majeure 15 6 Unavailable information 16 Appendix A (informative) Optional Information Category---Example 17 Appendix B (informative) Time Availability Index---Example 26 Appendix C (Informative Appendix) Verification Scenario---Example 30 Reference 42ForewordThis guidance technical document was drafted in accordance with the rules given in GB/T 1.1-2009. This guidance document uses the translation method equivalent to IEC /T S61400-26-1.2011 "Wind Generators Part 26-1. Time availability. The documents of our country that have a consistent correspondence with the international documents that are normatively cited in this guidance document are as follows. ---GB/T 18451.1-2012 Wind turbine design requirements (IEC 61400-1.2005, IDT) The following editorial technical documents have been edited as follows. --- "IAN" corrected to "IANO"; --- "IANSM" corrected to "IANOSM"; --- "IANPCA" corrected to "IANOPCA"; --- "IANFO" corrected to "IANOFO"; --- "IANS" corrected to "IANOS"; --- (B.2)~ (B.5) "IAONPP" is corrected to "IAOGPP". This guidance technical document was proposed by the China Machinery Industry Federation. This guidance document is under the jurisdiction of the National Wind Machinery Standardization Technical Committee (SAC/TC50). This guiding technical document drafting unit. Xinjiang Jinfeng Technology Co., Ltd., Beijing Jinfeng Kechuang Wind Power Equipment Co., Ltd., Gemei Haofeng Electric (Tianjin) Co., Ltd., Guohua Energy Investment Co., Ltd., Beijing Jianheng Certification Center, Zhejiang Yunda Wind Power Co., Ltd., Beijing Tianrun Xinneng Investment Co., Ltd., China Electric Power Research Institute, Guodian United Power Technology Co., Ltd., Longyuan Power Group Co., Ltd. Division, Beijing Tianyuan Kechuang Wind Power Technology Co., Ltd. The main drafters of this guiding technical document. Xie Shengqing, Li Zhiyong, Li Yue, Wang Wenzhao, Gao Hui, Yang Hongyuan, Liao Laimin, Guo Kai, Qin Shiyao, Ma Lihong, Meng Kaifeng, Wang Dongya, Gan Xuchao, Duan Yanfang.IntroductionThis guidance document is intended for owners, power companies, creditors, operators, manufacturers, consulting agencies, and supervisors in the wind power industry. When the regulatory agencies, certification bodies, insurance companies, and other interested parties exchange information about performance indicators, establish a common foundation and build An information model that provides a way to assign specific time periods to different categories of information. Calculating wind turbine availability and reliability When the indicator is used, the model provides a basis for how to allocate time. In order to explain the availability, service life, maintenance and determination of maintenance intervals for wind turbines and components, this guidance is provided. The article defines the general terminology required for wind turbines, environmental constraints, and calculations of wind turbine availability measurements. Availability The measured values are related to the power generation time of the wind turbine, taking into account environmental factors. These environmental factors include wind conditions and other weather strips Pieces, as well as the status of the grid and substation. In addition, this guidance document provides information on the capacity or capacity of wind turbines. The terminology required for the indicator. In this guidance technical document, the basic information category is enclosed in double quotation marks, and the optional information category is in bold. Said. IEC /T S61400-26 is divided into the following two parts, covering all of the above. ---IEC /T S61400-26-1 specifies the terms of time-based availability of wind turbines; ---IEC /T S61400-26-2 specifies the terminology related to the availability of wind turbines based on power generation. Wind turbine time availability1 ScopeThis guidance document specifies the general information categories for the time period specified by the wind turbine, taking into account the internal and external time of the time period. Ministry of the situation, and explain the following. --- General information categories related to wind turbine availability and other performance indicators; ---Information category priority order to distinguish the existing categories; ---Admission and exit conditions for each category of information to categorize time; ---Informative appendix includes. โ Examples of optional information categories; โ Examples of algorithms for availability and performance indicators; โ Application examples.2 Normative referencesThe following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 2900.53-2001 Electrotechnical terminology wind turbine (idtIEC 60050-415.1999) IEC 61400-1 Wind Turbine Design Requirements (Windturbines-Designrequirements) 3 Terms, definitions and abbreviations The following terms and definitions and abbreviations as defined in GB/T 2900.53-2001 apply to this document. 3.1 Terms and definitions 3.1.1 Availability availability The proportion of wind turbines that perform the expected service run time within the design specifications for a given period of time. 3.1.2 Design specification Accurate and understandable information related to product design requirements. Its content provides detailed functional and non-functional requirements including assumptions, limitations, performance, size, weight, reliability and standards. example For example, the specifications and design considerations described in IEC 61400-1 describe the processes required to develop a wind turbine design specification. 3.1.3 External condition externalconditions External conditions affecting the operation of wind turbines, such as (i) exceeding environmental conditions; (i) exceeding electrical specifications. 3.1.4 Permanent storage of permanentstorage Whether you turn off the storage device or move the storage device to another computer, you can still save the data or store the contents of the computer. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GBZ35482-2017_English be delivered?Answer: Upon your order, we will start to translate GBZ35482-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GBZ35482-2017_English with my colleagues?Answer: Yes. The purchased PDF of GBZ35482-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |