GBZ35483-2017: Wind turbines -- Production-based availability
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/Z 35483-2017759 Add to Cart 6 days Wind turbines -- Production-based availability Valid

Similar standards

GB/T 25388.1   GB/T 25387.1   GB/T 25389.2   GB/T 32077   GB/Z 35482   

Basic data

Standard ID: GB/Z 35483-2017 (GB/Z35483-2017)
Description (Translated English): Wind turbines -- Production-based availability
Sector / Industry: National Standard
Classification of Chinese Standard: F11
Classification of International Standard: 27.180
Word Count Estimation: 38,390
Date of Issue: 2017-12-29
Date of Implementation: 2018-07-01
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GBZ35483-2017: Wind turbines -- Production-based availability

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
GB /Z 35483-2017 Wind turbines-Production-based availability ICS 27.180 F11 National Standardization Technical Document of the People's Republic of China Wind turbine generation capacity availability (IEC /T S61400-26-2.2014, Windturbines- Part 26-2. Production-basedavailabilityforwindturbines, IDT) Released on.2017-12-29 2018-07-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Administration issued

Content

Foreword III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms, definitions and abbreviations 1 3.1 Terms and Definitions 1 3.2 Abbreviations 2 4 Information Model 4 4.1 Overview 4 4.2 Power Generation Terms Assigned to Information Category 6 4.3 Average information 7 4.4 Limitations 7 4.5 Admission and Exit Conditions 8 4.6 Information Category Priority 8 Appendix A (informative) Possible methods for determining potential power generation 9 Appendix B (informative) Example of power generation availability index 14 Appendix C (informative) Capacity factor and other performance indicators 17 Appendix D (informative) Verification scenario---Example 18 Appendix E (informative) Notes on conflicts in the allocation of lost power generation 31 Reference 32

Foreword

This guidance technical document was drafted in accordance with the rules given in GB/T 1.1-2009. This guidance document uses the translation method equivalent to IEC /T S61400-26-2.2014 "Wind Generators Part 26-2. Power generation availability. The documents of our country that have a consistent correspondence with the international documents that are normatively cited in this guidance document are as follows. ---GB/T 2900 (all parts) Electrotechnical terminology [IEC 60050 (all parts)] The following editorial technical documents have been edited as follows. --- Power curve measurement reference standard IEC 61400-12 corrected to IEC 61400-12-1. This guidance technical document was proposed by the China Machinery Industry Federation. This guidance document is under the jurisdiction of the National Wind Machinery Standardization Technical Committee (SAC/TC50). This guiding technical document drafting unit. Gemei Wind Power (Tianjin) Co., Ltd., Xinjiang Goldwind Technology Co., Ltd., Beijing Goldwind Kechuang Wind Power Equipment Co., Ltd., Guohua Energy Investment Co., Ltd., Beijing Jianheng Certification Center, Zhejiang Yunda Wind Power Co., Ltd., Beijing Tianrun Xinneng Investment Co., Ltd., China Electric Power Research Institute, Guodian United Power Technology Co., Ltd., Longyuan Power Group Co., Ltd. Division, Beijing Tianyuan Kechuang Wind Power Technology Co., Ltd. The main drafters of this guiding technical document. Wang Wenzhao, Li Yue, Xie Shengqing, Li Zhiyong, Gao Hui, Yang Hongyuan, Liao Laimin, Guo Kai, Qin Shiyao, Ma Lihong, Meng Kaifeng, Wang Dongya, Gan Xuchao, Duan Yanfang.

Introduction

This guidance document is intended for owners, power companies, creditors, operators, manufacturers, consultants, and supervisors in the wind power industry. When the regulatory agencies, certification bodies, insurance companies, and other interested parties exchange information about performance indicators, establish a common foundation and build An information model that provides a way to assign specific time periods to different categories of information. Calculating wind turbine availability and reliability When the indicator is used, the model provides a basis for how to allocate time. In order to explain the availability, service life, maintenance and determination of maintenance intervals for wind turbines and components, this guidance is provided. The article defines the general terminology required for wind turbines, environmental constraints, and calculation of the availability of wind turbines. wind power The unit includes all equipment prior to the electrical connection point*. The availability is related to the power generation time and power generation of the wind turbine. Consider environmental factors. These environmental factors include wind conditions and other weather conditions, as well as the status of the grid and substation. In addition, this guidance The technical documentation also provides the terminology required for performance indicators related to wind turbine generation. In this guidance technical document, the basic letter The interest category is enclosed in double quotes and the optional information category is shown in bold. This guidance document is an extension of GB /Z 35482-2017 and applies the information model specified in GB /Z 35482-2017. Type, but added information about power generation. The information model structure and interrelationships applied in GB /Z 35482-2017 also apply to This guidance document is based on the expansion of power generation. This guidance document is intended to establish a common basis for the exchange of information on the availability of power generation. Calculating the availability of power generation Time and power generation can be allocated using an information model. Note. * The electrical connection point depends on the project, but is usually the low voltage or high voltage port where the wind turbine is connected to the collector line. Wind turbine generation capacity availability

1 Scope

This guidance technical document provides a calculation framework for wind turbine generating capacity performance indicators, describes the data classification method, and gives An example of applying these data to calculate performance metrics. The method provided in this guidance document is an extension of the time allocation model described in GB /Z 35482-2017. additional Two additional layers have been added to record the actual and potential power generation in the same time period. The purpose of this guidance document is not to specify the calculation method for the availability of power generation, nor to provide a basis for performance measurement of power curves. According to; for power curve measurement, please refer to IEC 61400-12-1. This guidance document also includes the following informative annexes. --- Calculation example of lost power generation; --- Algorithm example of power generation indicator; --- Examples of other performance indicators; --- Application examples.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. IEC 60050 (all parts) electrical terminology (International electrotechnicalvocabulary) GB /Z 35482-2017 Wind turbine generator time availability (IEC /T S61400-26-12011, IDT) 3 Terms, definitions and abbreviations The following terms, definitions and abbreviations are the same as the relevant terms and definitions contained in GB /Z 35482-2017 and IEC 60050-415. Applicable to this document. 3.1 Terms and definitions 3.1.1 Site condition siteconditions Factors affecting wind turbine generation, such as topography, climate and meteorological conditions, sector management, electrical conditions, and contractual constraints. 3.1.2 Actual power generation actualenergyproduction Electrical energy measured at the point of connection between the wind turbine and the power collection system (according to IEV and IEC 60050-415) Note. Depending on the wind turbine design, the connection point can be on the low voltage side or on the medium and high voltage side. 3.1.3 Potential power generation potentialenergyproduction Electrical energy calculated according to wind turbine design guidelines, technical specifications and site conditions.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GBZ35483-2017_English be delivered?

Answer: Upon your order, we will start to translate GBZ35483-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GBZ35483-2017_English with my colleagues?

Answer: Yes. The purchased PDF of GBZ35483-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.