Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 38604.3-2020 English PDF

US$229.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 38604.3-2020: Public information guidance systems - Assessment requirement - Part 3: Urban rail transit station
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 38604.3-2020229 Add to Cart 3 days Public information guidance systems - Assessment requirement - Part 3: Urban rail transit station Valid

Similar standards

GB/T 16903   GB/T 15566.1   GB/T 31525   GB/T 38604.4   GB/T 38605   GB/T 38604.2   

Basic data

Standard ID: GB/T 38604.3-2020 (GB/T38604.3-2020)
Description (Translated English): Public information guidance systems - Assessment requirement - Part 3: Urban rail transit station
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: A22
Classification of International Standard: 01.080.10
Word Count Estimation: 12,111
Date of Issue: 2020-03-31
Date of Implementation: 2020-10-01
Quoted Standard: GB/T 15565; GB/T 15566.4; GB/T 19038; GB/T 38604.1
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration
Summary: This standard specifies the principles for the evaluation of the public information guidance system of urban rail transit stations (hereinafter referred to as the guidance system of rail transit stations), and specifies the requirements for preliminary preparation, evaluation implementation and evaluation results. This standard is applicable to the evaluation of new construction, reconstruction, expansion and maintenance of public information guidance systems in urban rail transit stations.

GB/T 38604.3-2020: Public information guidance systems - Assessment requirement - Part 3: Urban rail transit station


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Public information guidance systems - Assessment requirement - Part 3.Urban rail transit station ICS 01.080.10 A22 National Standards of People's Republic of China Public information-oriented system evaluation requirements Part 3.Urban Rail Transit Station 2020-03-31 released 2020-10-01 implementation State Administration for Market Regulation Issued by the National Standardization Management Committee

Table of contents

Preface Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 General 1 5 Preparation 1 5.1 Evaluation scope 1 5.2 Evaluation cycle 1 5.3 Evaluation Index 2 5.4 Evaluation plan 5 6 Evaluation Implementation 6 7 Evaluation conclusion 6 Appendix A (informative appendix) Field test method 7 Appendix B (informative appendix) Sample 8 of questionnaire for rail transit station guidance system Table 1 Evaluation index system of rail transit station guidance system 2 Form B.1 Investigator fills in 8 Form B.2 Passenger fills in 8

Foreword

GB/T 38604 "Public Information Oriented System Evaluation Requirements" consists of the following parts. ---Part 1.General Provisions; ---Part 2.Railway passenger station; ---Part 3.Urban rail transit station; ---Part 4.Bus and tram station. This part is Part 3 of GB/T 38604. This section was drafted in accordance with the rules given in GB/T 1.1-2009. This part was proposed and managed by the National Graphic Symbol Standardization Technical Committee (SAC/TC59). Drafting organizations of this section. China National Institute of Standardization, Beijing Forestry University, Beijing Municipal Transportation Committee, CRRC Qingdao Sifang Locomotive and Rolling Stock Co., Ltd., Beijing Rail Transit Design and Research Institute Co., Ltd., Shandong Institute of Standardization, Beijing Metro Operation Co., Ltd. The main drafters of this section. Zou Chuanyu, Wang Guangxin, An Xiaofen, Bai Lu, Dai Keping, Gao Jindong, Zhou Ke, Chen Yongquan, Zhang Liang, Luo Yanyan, Wang Haiyan. Public information-oriented system evaluation requirements Part 3.Urban Rail Transit Station

1 Scope

This part of GB/T 38604 clarifies the public information guidance system of urban rail transit stations (hereinafter referred to as rail transit station guidance The principle of systematic) evaluation stipulates the requirements of preliminary preparation, evaluation implementation and evaluation results. This part is applicable to the evaluation of urban rail transit station construction, reconstruction, expansion and maintenance of public information guidance system.

2 Normative references

The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article Pieces. For undated references, the latest version (including all amendments) applies to this document. GB/T 15565 Graphical Symbol Terms GB/T 15566.4 Principles and Requirements for Public Information Guidance System Setting Part 4.Public Transport Station GB/T 19038 Customer Satisfaction Evaluation Model and Method Guide GB/T 38604.1 Evaluation requirements for public information-oriented systems-Part 1.General

3 Terms and definitions

The terms and definitions defined in GB/T 15565 and GB/T 19038 apply to this document.

4 General

4.1 The evaluation work shall comply with the requirements of GB/T 38604.1. 4.2 The evaluation scope should be determined according to the objectives of the evaluation work. For example, for the overall evaluation of a certain city, the evaluation scope should cover the city All urban rail transit lines that have been opened. 4.3 The evaluation period should be determined according to the scale of the urban rail transit network, operating years, and evaluation objectives. Evaluation to the system can be carried out 3 months after the formal operation.

5 Preparation

5.1 Evaluation scope The evaluation scope of rail transit station guidance system is divided into whole network evaluation and special evaluation. The whole network evaluation should cover the whole operation of a certain city Time period, full operation line; special evaluation can carry out evaluation on specific line, specific station, specific operation period (such as peak period), etc. 5.2 Evaluation cycle The evaluation cycle of the whole network evaluation should be no less than once a year, and special evaluation can be carried out according to actual needs.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 38604.3-2020_English be delivered?

Answer: Upon your order, we will start to translate GB/T 38604.3-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 38604.3-2020_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 38604.3-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.