Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 38604.2-2020 English PDF

US$229.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 38604.2-2020: Public information guidance systems - Assessment requirement - Part 2: Railway passenger station
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 38604.2-2020229 Add to Cart 3 days Public information guidance systems - Assessment requirement - Part 2: Railway passenger station Valid

Similar standards

GB/T 16903   GB/T 15566.1   GB/T 31525   GB/T 38604.4   GB/T 38605   GB/T 38604.3   

Basic data

Standard ID: GB/T 38604.2-2020 (GB/T38604.2-2020)
Description (Translated English): Public information guidance systems - Assessment requirement - Part 2: Railway passenger station
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: A22
Classification of International Standard: 01.080.10
Word Count Estimation: 12,150
Date of Issue: 2020-03-31
Date of Implementation: 2020-10-01
Quoted Standard: GB/T 15565; GB/T 15566.3; GB/T 19038; GB/T 38604.1
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration
Summary: This standard specifies the general rules, preliminary preparations, evaluation implementation and evaluation conclusions for the evaluation requirements of the public information guidance system of railway passenger stations (hereinafter referred to as the guidance system of railway passenger stations). This standard is applicable to the evaluation of new construction, reconstruction, expansion and maintenance of public information guidance systems in railway passenger stations.

GB/T 38604.2-2020: Public information guidance systems - Assessment requirement - Part 2: Railway passenger station


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Public information guidance systems - Assessment requirement - Part 2.Railway passenger station ICS 01.080.10 A22 National Standards of People's Republic of China Public information-oriented system evaluation requirements Part 2.Railway Passenger Station 2020-03-31 released 2020-10-01 implementation State Administration for Market Regulation Issued by the National Standardization Management Committee

Table of contents

Preface Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 General 1 5 Preparation 1 5.1 Evaluation scope 1 5.2 Evaluation cycle 1 5.3 Evaluation Index 2 5.4 Evaluation plan 5 6 Evaluation Implementation 6 7 Evaluation conclusion 6 Appendix A (informative appendix) Field test method 7 Appendix B (informative appendix) Sample questionnaire for railway passenger station guidance system 8 Table 1 Evaluation index system of railway passenger station guidance system 2 Form B.1 Investigator fills in 8 Form B.2 Passenger fills in 8

Foreword

GB/T 38604 "Requirements for the Evaluation of Public Information Oriented Systems" consists of the following parts. ---Part 1.General Provisions; ---Part 2.Railway passenger station; ---Part 3.Urban rail transit station; ---Part 4.Bus and tram station. This part is Part 2 of GB/T 38604. This section was drafted in accordance with the rules given in GB/T 1.1-2009. This part was proposed and managed by the National Graphic Symbol Standardization Technical Committee (SAC/TC59). Drafting organizations of this section. China National Institute of Standardization, National Railway Administration, China National Railway Group Co., Ltd., Standardization Research of Shandong Province Institute, China Automotive Certification Center Co., Ltd., Beijing Municipal Commission of Transportation, Beijing Vision Four-dimensional Urban Orientation System Planning and Design Co., Ltd. The main drafters of this section. Zou Chuanyu, Chen Ziding, Cai Yun, Yang Fengjiang, Qiang Yi, An Xiaofen, Chen Yongquan, Zhang Liang, Gong Fengqi, Gao Jindong. Public information-oriented system evaluation requirements Part 2.Railway Passenger Station

1 Scope

This part of GB/T 38604 specifies the public information guidance system of railway passenger stations (hereinafter referred to as railway passenger station guidance system) General rules of evaluation requirements, preliminary preparation, evaluation implementation and evaluation conclusions. This part is applicable to the evaluation of railway passenger station construction, reconstruction, expansion and maintenance of public information guidance system.

2 Normative references

The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article Pieces. For undated references, the latest version (including all amendments) applies to this document. GB/T 15565 Graphical Symbol Terms GB/T 15566.3 Principles and requirements for the establishment of public information guidance system Part 3.Railway passenger stations GB/T 19038 Customer Satisfaction Evaluation Model and Method Guide GB/T 38604.1 Evaluation requirements for public information-oriented systems-Part 1.General

3 Terms and definitions

The terms and definitions defined in GB/T 15565 and GB/T 19038 apply to this document.

4 General

4.1 The evaluation work shall comply with the requirements of GB/T 38604.1. 4.2 The scope of evaluation shall be determined according to the purpose of evaluation. For example, for the overall evaluation of a certain area, the evaluation scope should be all railway travel in the city. Bus station. 4.3 The evaluation period shall be determined according to the operating conditions of railway passenger stations. For example, for new or rebuilt railway passenger station guidance systems Evaluation can be carried out 3 months after the official operation.

5 Preparation

5.1 Evaluation scope The evaluation scope of the railway passenger station guidance system includes individual station evaluation and special evaluation. The evaluation of a single station should be a certain Specific railway passenger stations; special evaluation can carry out evaluation on specific lines, certain areas or specific time periods. 5.2 Evaluation cycle The evaluation of a single station should be matched with the progress of new construction, reconstruction, expansion or maintenance of the railway passenger station guidance system. Special evaluation can be based on actual Need to develop.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 38604.2-2020_English be delivered?

Answer: Upon your order, we will start to translate GB/T 38604.2-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 38604.2-2020_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 38604.2-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.