GB/T 37531-2019 English PDFUS$599.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 37531-2019: Single turnout for straddle monorail transit Status: Valid
Basic dataStandard ID: GB/T 37531-2019 (GB/T37531-2019)Description (Translated English): Single turnout for straddle monorail transit Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: Q84 Classification of International Standard: 45.080 Word Count Estimation: 30,334 Date of Issue: 2019-06-04 Date of Implementation: 2020-01-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 37531-2019: Single turnout for straddle monorail transit---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Single turnout for straddle monorail transit ICS 45.080 Q84 National Standards of People's Republic of China Straddle-type monorail traffic Published on.2019-06-04 2020-01-01 implementation State market supervision and administration China National Standardization Administration issued ContentForeword III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 2 4 Classification 4 5 General requirements 8 6 Special requirements 9 7 System main components technical requirements 11 8 Test method 18 9 Inspection rules 20 10 Marking, packaging, transport and storage 21 Appendix A (Normative Appendix) Switching Mounting Accuracy 22ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard was proposed by the Ministry of Housing and Urban-Rural Development of the People's Republic This standard is under the jurisdiction of the National Urban Rail Transit Standardization Technical Committee (SAC/TC290). This standard was drafted. Chongqing Gearbox Co., Ltd., Chongqing Rail Transit (Group) Co., Ltd., Chongqing Rail Transit Research Institute Co., Ltd., Chongqing (International) Monorail Association, Chongqing Huasheng Electric Group Co., Ltd., Chongqing Chuandong Shipbuilding Heavy Industry Co., Ltd. Any company. The main drafters of this standard. Zhong Jianhua, Zhao Junxi, Lu Hesheng, Tian Xiaoyu, Liu Dongqing, Deng Shiwei, Zhao Yong, Liu Hongwei, Cui Guilin, Liu Wei, Wang Bo, Liu Bo, Yang Fuqiang, Du Muxin, Gao Defang, Zhang Liting, Tan Jun, Wu Baochang. Straddle-type monorail traffic1 ScopeThis standard specifies the classification form, general requirements, special requirements, technical requirements of main components of the system, and the technical requirements of the main components of the system. Test methods, inspection rules, marking, packaging, transportation and storage. This standard is applicable to straddle type monorail traffic single turnouts with 820mm and 700mm track beam width.2 Normative referencesThe following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 191 packaging storage and transportation icon GB/T 699 high quality carbon structural steel GB/T 700 carbon structural steel GB/T 1184 Shape and position tolerances without tolerance values GB/T 1348 ductile iron castings GB/T 1591 low alloy high strength structural steel GB/T 1804 General tolerances No tolerances for linear and angular dimensions tolerances GB/T 2423.1 Environmental testing of electrical and electronic products - Part 2. Test methods Test A. Low temperature GB/T 2423.2 Environmental testing of electrical and electronic products - Part 2. Test methods Test B. High temperature GB/T 2423.4 Environmental testing of electric and electronic products - Part 2. Test method Test Db. alternating heat (12h 12h cycle) GB/T 2585 hot rolled rail for railway GB/T 3077 alloy structural steel GB/T 3098.1 Fastener mechanical properties bolts, screws and studs Calculation method for bearing capacity of GB/T 3480 involute cylindrical gear GB/T 4768 mildew proof packaging GB/T 4879 anti-rust packaging GB/T 5048 moisture-proof packaging GB/T 5782 Hex Head Bolt GB/T 6391 rolling bearing rated dynamic load and rated life GB/T 6404.1 Acceptance specification for gear units - Part 1. Test specification for airborne noise GB/T 7284 frame wooden box GB/T 7350 waterproof packaging GB/T 8162 structural seamless steel pipe GB/T 10062.1 Calculation methods for load capacity of bevel gears - Part 1 GB/T 10062.2 calculation method of load capacity of bevel gears - Part 2 GB/T 10062.3 Calculation of bearing capacity of bevel gears - Part 3 GB/T 10095.1 Precision of cylindrical gears - Part 1. Definitions and permissible values GB/T 10095.2 Precision of cylindrical gears - Part 2. Definitions and permissible values of radial integrated deviation and radial runout ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 37531-2019_English be delivered?Answer: Upon your order, we will start to translate GB/T 37531-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 37531-2019_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 37531-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |