GB/T 36579-2018 English PDFUS$119.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 36579-2018: Load test method of cantilever system for self-elevating drilling unit Status: Valid
Basic dataStandard ID: GB/T 36579-2018 (GB/T36579-2018)Description (Translated English): Load test method of cantilever system for self-elevating drilling unit Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: U17 Classification of International Standard: 47.020.99 Word Count Estimation: 6,659 Date of Issue: 2018-09-17 Date of Implementation: 2019-04-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 36579-2018: Load test method of cantilever system for self-elevating drilling unit---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Load test method of cantilever system for self-elevating drilling unit ICS 47.020.99 U17 National Standards of People's Republic of China Self-elevating drilling platform cantilever beam load test method Published on.2018-09-17 Implementation of.2019-04-01 State market supervision and administration China National Standardization Administration issued ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard is proposed and managed by the National Marine Ship Standardization Technical Committee (SAC/TC12). This standard was drafted. Shanghai Waigaoqiao Shipbuilding Co., Ltd., China Shipbuilding Industry Comprehensive Technology and Economic Research Institute, China Shipbuilding Industry The 7th Institute of the Communist Youth League. The main drafters of this standard. Wang Chao, Dai Xiaohu, Zhang Weidong, Ma Shuguang, Sun Yaogang. Self-elevating drilling platform cantilever beam load test method1 ScopeThis standard specifies the test purpose, test conditions, test procedures, test of the cantilever beam of the jack-up drilling platform (abbreviated as cantilever beam). Test results evaluation, etc. This standard applies to the self-elevating drilling platform sliding cantilever beam load test.2 Test purposesThe objectives of the test include. a) verify the stiffness and strength of the cantilever beam; b) verify the strength of the support structure of the platform body; c) verify the load slip performance of the cantilever beam and the drill floor; d) Verify the derrick rated load and the drilling lift system load.3 test conditions3.1 The test shall be carried out under the environmental conditions that ensure the safety of the operation. The wind is generally not more than six grades and the wave height is not more than 0.5 m. 3.2 Installation and commissioning of related equipment such as cantilever beam, derrick and drill floor related to the test are completed. 3.3 The construction and commissioning of each system of the drilling platform related to the test is completed and the conditions of use are available. These systems include. a) power system; b) ballast system; c) lifting system; d) the slip system of the cantilever beam and the drill floor; e) Fixtures for cantilever beams and drill stands and derrick swimming systems. 3.4 The preloading of the drilling platform is completed. 3.5 Determine the height required for the drilling platform test and consider the impact of the tide on the lift height. 3.6 According to the weight and center of gravity parameters obtained from the cantilever beam and rig weighing test, the cantilever beam load table is updated to determine the load of the test condition. 3.7 According to the cantilever beam load table, the platform ballast plan is formulated under consideration of the stability of the platform. 3.8 The load block used in the test shall be weight-calibrated and submitted to the shipowner/ship inspection. 3.9 The measuring instrument such as dynamometer and total station used in the test shall be qualified and valid within the validity period. 3.10 The slings used in the test shall meet the requirements of the load test and shall have corresponding certificates. 3.11 The hoist used in the test shall be tested for non-destructive testing and qualified.4 test procedure4.1 Test preparation 4.1.1 Preparing the test load Test loads, such as water tanks, barges, load blocks, etc., are prepared according to test conditions. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 36579-2018_English be delivered?Answer: Upon your order, we will start to translate GB/T 36579-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 36579-2018_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 36579-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |