Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 18216.2-2021 English PDF

US$184.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 18216.2-2021: Electrical safety in low voltage distribution systems up to 1 000 V a. c. and 1 500 V d. c. - Equipment for testing, measuring or monitoring of protective measures - Part 2: Insulation resistance
Status: Valid

GB/T 18216.2: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 18216.2-2021184 Add to Cart 3 days Electrical safety in low voltage distribution systems up to 1 000 V a. c. and 1 500 V d. c. - Equipment for testing, measuring or monitoring of protective measures - Part 2: Insulation resistance Valid
GB/T 18216.2-2012319 Add to Cart 3 days Electrical safety in low voltage distribution systems up to 1000 V a.c. and 1500 V d.c. -- Equipment for testing, measuring or monitoring of protective measures -- Part 2: Insulation resistance Obsolete
GB/T 18216.2-2002279 Add to Cart 3 days 1000V AC and 1500V dc low voltage distribution system Electrical Safety Equipment for testing, measuring or monitoring equipment -- Part 2: Insulation resistance Obsolete

Similar standards

GB 4793   GB/T 15284   GB/T 17215.321   GB/T 18216.7   GB/T 18216.11   GB/T 18216.6   

Basic data

Standard ID: GB/T 18216.2-2021 (GB/T18216.2-2021)
Description (Translated English): Electrical safety in low voltage distribution systems up to 1 000 V a. c. and 1 500 V d. c. - Equipment for testing, measuring or monitoring of protective measures - Part 2: Insulation resistance
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: N20
Word Count Estimation: 10,124
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 18216.2-2021: Electrical safety in low voltage distribution systems up to 1 000 V a. c. and 1 500 V d. c. - Equipment for testing, measuring or monitoring of protective measures - Part 2: Insulation resistance



---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Electrical safety in low voltage distribution systems up to 1 000 V acand 1 500 V dc- Equipment for testing, measuring or monitoring of protective measures-Part 2.Insulation resistance ICS 17.220.20 CCSN20 National Standards of People's Republic of China Replace GB/T 18216.2-2012 AC 1000V and DC 1500V and below Testing of electrical safety protection measures for low-voltage power distribution systems, Measuring or monitoring equipment Part 2.Insulation resistance (IEC 61557-2.2019, IDT) Released on 2021-05-21 and implemented on 2021-12-01 State Administration of Market Supervision and Administration Issued by the National Standardization Management Committee

Table of contents

Foreword Ⅰ Introduction Ⅱ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 Requirements 2 4.1 General requirements 2 4.2 Output voltage 2 4.3 Rated current 2 4.4 Measuring current 2 4.5 Influence of external capacitance 2 4.6 Overvoltage 2 5 Logo and instruction manual 3 5.1 Logo 3 5.2 Instruction Manual 3 6 Test 3 6.1 Overview 3 6.2 Work uncertainty 3 6.3 Open circuit voltage 4 6.4 Rated current 4 6.5 Measuring current 4 6.6 Overvoltage test 4 6.7 Battery life in battery-powered instruments 5 6.8 Stability test 5 Reference 6

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" Drafting. This document is GB/T 18216 "AC 1000V and DC 1500V and below low-voltage power distribution system electrical safety protection measures Part 2 of "Testing, Measuring or Monitoring Equipment". GB/T 18216 has released the following parts. ---Part 1.General requirements; ---Part 2.Insulation resistance; ---Part 3.Loop impedance; ---Part 4.Grounding resistance and equipotential grounding resistance; ---Part 5.Resistance to ground; ---Part 8.Insulation monitoring device in IT system; ---Part 9.Insulation fault location equipment in IT systems; ---Part 12.Performance Measurement and Monitoring Device (PMD). This document replaces GB/T 18216.2-2012 "Electrical safety protection of low-voltage power distribution systems below 1000V AC and 1500V DC Test, measurement or monitoring equipment for protective measures Part 2.Insulation resistance", compared with GB/T 18216.2-2012, except for structural adjustment and In addition to editorial changes, the main technical changes are as follows. ---Added requirements for measurement categories (see 4.1); ---Added new requirements for the instruction manual (see 5.2). The translation method used in this document is equivalent to the IEC 61557-2.2019 ``AC 1000V and DC 1500V and below low-voltage power distribution system Testing, measuring or monitoring equipment for integrated electrical safety protection measures. Part 2.Insulation resistance. This document has made the following editorial changes. ---Added references. Please note that some of the contents of this document may involve patents. The issuing agency of this document is not responsible for identifying patents. This document was proposed by China Machinery Industry Federation. This document is under the jurisdiction of the National Electrical Instrumentation Standardization Technical Committee (SAC/TC104). Drafting organizations of this document. Harbin Institute of Electrical Engineering and Instrumentation Co., Ltd., Yantai Oriental Weston Electric Co., Ltd., Yunnan Power Grid Co., Ltd. Responsible company metering center, State Grid Hebei Electric Power Co., Ltd. Xiong’an New District Power Supply Company, Xiamen Keyuer Technology Co., Ltd., State Grid Jiangsu Provincial Electric Power Co., Ltd. Marketing Service Center, State Grid Chongqing Electric Power Company Marketing Service Center, State Grid Heilongjiang Electric Power Co., Ltd. Electric Power Section Research Institute, Zhejiang Chentai Technology Co., Ltd., Heilongjiang Electrical Instrumentation Engineering Technology Research Center Co., Ltd., Ningbo Canaan Intelligent Electric Co., Ltd., Shenzhen Kelu Electronic Technology Co., Ltd., State Grid Tianjin Electric Power Company Electric Power Research Institute, China Grid Jiangsu Electric Power Co., Ltd., Shenzhen Xinglong Technology Co., Ltd., Xu Ji Group Co., Ltd., State Grid Jibei Electric Power Co., Ltd. Measurement Center, State Grid Zhejiang Comprehensive Energy Service Co., Ltd., Holley Technology Co., Ltd., Beijing Zhongchen Hongchang Technology Co., Ltd. The main drafters of this document. Jiang Bin, Chen Wenxin, Xie Jianguo, Shen Xin, Chen Youyong, Li Jin, Ji Feng, Wang Sanqiang, Li Guoqiang, Liu Furong, Yan Yaofeng, Zhang Changzhi, Zhao Bin, Gong Dan, Huang Jianzhong, Luo Yurong, Liu Xuexue, Ye Hongen, Nie Jianbo, Qin Guoxin, Wang Taofeng, Jiang Weiping, Guo Chuang, Zeng Shitu, Li Guilin. The previous versions of this document and the documents replaced are as follows. --- First published in.2007 as GB/T 18216.2-2007, first revised in.2012; ---This is the second revision.

Introduction

IEC 60364-6 specifies the first test, continuous monitoring and adjustment of these equipment in TN, TT or IT systems. Standardized conditions for the post-adjustment test. In addition to the general standards that specify the implementation of these tests, IEC 60364-6 also includes To verify the requirements. Only in a few cases, such as when measuring insulation resistance, does IEC 60364-6 include the measuring device used. Details of the characteristics of the settings. Circuit diagrams given as examples in IEC 60364-6 and cited in the main text of the document are generally not applicable actual use. When dangerous voltages appear in the electrical installation and the equipment is improperly used or defective, the implementation of the test in the electrical installation can easily cause concern. outer. Therefore, in addition to simplifying the measurement, technicians also need to rely on measurement devices that ensure the safety of the measurement method. The application of the general safety rules for electrical and electronic measuring devices (IEC 61010-1) for protective measures is in itself insufficient. in Measurements in power installations are not only harmful to technicians, but also to third parties due to different measurement methods. Similarly, in order to obtain an objective judgment about the equipment, such as periodic tests, continuous insulation monitoring, or In the case of performance assurance, an important prerequisite is to use measurement devices from different manufacturers to obtain reliable and comparable measurement results. The purpose of GB/T 18216 is to specify uniform principles that are consistent with the above characteristics. These principles are applicable to nominal voltage AC Measuring and monitoring equipment for electrical safety test and performance test in 1000V and DC 1500V and below systems. GB/T 18216 It is proposed to consist of ten parts. ---Part 1.General requirements. The purpose is to establish a low-voltage power distribution system with nominal voltages of AC 1000V and DC 1500V and below General requirements for test equipment used for electrical safety measurement and monitoring in the system. ---Part 2.Insulation resistance. The purpose is to establish that the measurement is suitable for the insulation of equipment and electrical installation equipment in a non-excited state Relevant requirements for resistance equipment. ---Part 3.Loop impedance. The purpose is to establish between the measuring line conductor and the protective conductor, between the line conductor and the neutral conductor, or between the two conductors. The relevant requirements of the loop impedance device between the line conductors. ---Part 4.Grounding resistance and equipotential grounding resistance. The purpose is to establish the grounding conductor, protective grounding conductor and And the relevant technical requirements for the resistance of the equipotential bonding conductor. ---Part 5.Resistance to ground. The purpose is to establish requirements for measuring equipment that uses AC voltage to measure resistance to earth. ---Part 6.Effectiveness of Residual Current Device (RCD) in TT, TN and IT systems. The purpose is to establish that the measurement is suitable for Relevant requirements for test equipment for the effectiveness of protective measures for residual current devices in TT, TN and IT systems. ---Part 8.Insulation monitoring device in IT system. The purpose is to establish relevant requirements for insulation monitoring devices in IT systems. ---Part 9.Insulation fault location equipment in IT systems. The purpose is to establish the phase of insulation fault location equipment in the IT system. Close requirements. --- Part 10.Combination measuring equipment for testing, measuring or monitoring protective measures. The purpose is to establish test, measurement or monitoring The related requirements of the equipment in which a variety of measurement functions or measurement methods are combined together. ---Part 12.Performance Measurement and Monitoring Device (PMD). The purpose is to establish a comprehensive measurement and monitoring of electrical parameters in the distribution system. Meet the relevant requirements of performance measurement and monitoring devices. AC 1000V and DC 1500V and below Testing of electrical safety protection measures for low-voltage power distribution systems, Measuring or monitoring equipment Part 2.Insulation resistance

1 Scope

This document specifies the requirements for measuring insulation resistance equipment, which are suitable for measuring equipment and electrical installations in a non-excited state The insulation resistance of the equipment.

2 Normative references

The contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, dated quotations Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to This document. GB/T 18216.1-2021 AC 1000V and DC 1500V and below low-voltage power distribution system electrical safety protection measures Testing, measuring or monitoring equipment Part 1.General requirements (IEC 61557-1.2019, IDT) IEC 61010-1.2010 AMD1.2016 Safety requirements for electrical equipment for measurement, control and laboratory use Part 1.General Requirements (Safetyrequirementsforelectricalequipmentformeasurement, controlandlaboratoryuse-Part 1.Generalrequirements) IEC 61010-031 Safety requirements for electrical equipment for measurement, control, and laboratory use. Part 031.Electrical testing and measurement by hand Safety requirements for electrical equipment and manual control components (Safety requirements for electrical equipment for measurement, control andlaboratoryuse-Part031.Safetyrequirementsforhand-heldandhand-manipulatedassembliesfor electricaltestandmeasurement) IEC 61010-2-034.2017 Safety requirements for electrical equipment for measurement, control and laboratory use Part 2-034.Insulation resistance measurement Special requirements for measuring equipment and dielectric strength test equipment (Safety requirements for electrical equipment for measurement,control,andlaboratoryuse-Part 2-034.Particularrequirementsformeasuremente- quipmentforinsulationresistanceandtestequipmentforelectricstrength)

3 Terms and definitions

The following terms and definitions defined in GB/T 18216.1-2021 apply to this document. ISO and IEC maintain a terminology database for standardization. The website is as follows. 3.1 Line-to-linevoltage The voltage between two wire conductors at a given point in an electrical circuit. [Source. GB/T 2900.73-2008,195-05-01]
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 18216.2-2021_English be delivered?

Answer: Upon your order, we will start to translate GB/T 18216.2-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 18216.2-2021_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 18216.2-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 18216.2-2021?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 18216.2-2021 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.