GB/T 17215.701-2011 English PDFUS$1199.00 · In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 17215.701-2011: Reference meter for electrical energy Status: Obsolete
Similar standardsGB/T 15284 GB/T 17215.321 GB/T 34067.2 GB/T 17215.686 GB/Z 17215.682 GB/T 17215.691Basic dataStandard ID: GB/T 17215.701-2011 (GB/T17215.701-2011)Description (Translated English): Reference meter for electrical energy Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: N22 Classification of International Standard: 17.220.20 Word Count Estimation: 30,376 Date of Issue: 2011-07-29 Date of Implementation: 2011-12-01 Quoted Standard: GB/T 2423.1-2008; GB/T 2423.2-2008; GB/T 2423.5-1995; GB/T 2423.10-2008; GB/T 2829-2002; GB/T 5169.11-2006; GB/T 5465.2-2008; GB 9254-2008; GB/T 9969-2008; GB/T 11150-2001; GB/T 13384-2008; GB/T 16927.1-1997; GB/T 17215.211-2006; GB/T 17215.321-2008; GB/T 17215.352-2009; GB/T 17626.2-2006; GB 4208-2008 Regulation (derived from): Announcement of Newly Approved National Standards No. 12 of 2011 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the standard meter of terms and definitions, product classifications, conditions of use, technical requirements, test methods, inspection rules, marking, packaging and storage. This section applies to the reference frequency of 50 Hz (or 60 Hz), in the laboratory for testing and calibration of active and (or) the criteria for reactive energy meter (hereinafter referred to as instrumentation). GB/T 17215.701-2011: Reference meter for electrical energy---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Reference meter for electrical energy ICS 17.220.20 N22 National Standards of People's Republic of China Standard Meter Issued on. 2011-07-29 2011-12-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released Table of ContentsIntroduction Ⅲ Introduction Ⅳ 1 Scope 1 2 Normative references 1 3 Terms and definitions 2 4 Category 2 Accuracy class 4.1 by 2 meter Measuring 4.2 by 3 power direction 4.3 Category 3 according to the measurement of electrical energy 5 requires 3 5.1 standard power value 3 5.2 Temperature and relative humidity range 3 5.3 Mechanical Requirements 4 5.4 Electrical requirements 5 5.5 Electromagnetic compatibility (EMC) 7 5.6 accuracy requirements 7 10 5.7 Reliability 6 11 testing and test methods 6.1 General test procedure 11 6.2 Climate Impact Test 11 6.3 Mechanical Performance Test 11 6.4 Electrical Performance Test 12 6.5 Electromagnetic compatibility test (EMC) 14 6.6 Accuracy test 15 7 Inspection rules 19 7.1 Inspection classification 19 7.2 Factory (acceptance) test 19 19 7.3 Type inspection 8 signs, packaging and storage 20 8.1 Marking 20 8.2 Packaging 20 8.3 Storage 20 8.4 User's Manual 20 Appendix A (informative) Test Procedure (recommended test sequence) 21 Appendix B (normative) Inspection item 22 meter References 23 Table 1 Reference voltage 3 Table 2 Recommended current value 3 Table 3 Temperature range 4 Table 4 Relative humidity 4 Table 5 meter fH value under the rated input power of 5 Table 6 display digits 5 Table 7 the amount of change due to a sudden power failure 6 Table 8 changes the amount of overcurrent (over-voltage) induced 6 Changing the amount of error caused by self-heating Table 9 7 Basic error limits Table 10 three-phase meter single-phase and balanced load meter 7 Table Basic error limits of three-phase unbalanced load meter when 11 8 Table 12 meter experimental standard deviation of 8 13 Table 9 Stability Table 14 Effect of the amount of 9 Table 15 Temperature Coefficient 10 Within each grade instruments 20min error limit change 13 Table 16 Influence of self heating test 17 Voltage and current balance condition table 15 Table 18 Reference conditions 15ForewordThis section prepared in accordance with GB/T 1.1-2009 given rules. Please note that some of the content of this document may involve patents. Release mechanism of the present document does not assume responsibility for the identification of these patents. This part is proposed by China Machinery Industry Federation. This part of the National Electrical Instrument Standardization Technical Committee (SAC/TC104) centralized. This section is drafted. Harbin Electrical Instrument Research Institute, Shandong Electric Power Research Institute, Shenzhen Clou Electronics Technology Co., Ltd., China National Institute of Measurement Science, Shanghai EF Electronics Technology Co., Ltd., Henan Institute of Metrology, Henan Electric Power Company, Liaoning meter Amount Science Institute in Shandong Province Institute of Metrology, Shanghai Measurement and Testing Technology Research Institute, Taiyuan gifted Te Aoke Electronic Technology Co., Ningbo Sanxing Electric Co., Ltd., Zhengzhou three-hui Electric Co., Ltd., Zhejiang Han Pu Power Technology Co., Ltd., Henan Star Hi-Tech TECHNOLOGY CO., LTD. The main drafters of this section. Xu Min, Leihui Bo, Luzu Liang, Wang Lei, Xue Jin Tak, Ma Rui Song, Lu Xing Yuan, Xu Renheng, Tang Hong, Zhang Qin, Lei Shi Bing, Rui Cao, Xia Yali, Luo Yurong, Yu Yi Zhou, Wang, Lien Zheng, LI Jun-ming.IntroductionThe purpose of the section is to provide a standard product for manufacturers and users to use such instruments, reflecting product orders technical specifications Most of the requirements. This part of the capacity value, mechanical requirements, weather conditions, electromagnetic compatibility, electrical insulation as well as the accuracy and amount are based on current domestic impact A large number of technical parameters such instruments determined. On the level of accuracy of the technical requirements of the standard 0.01 meter, in Senate According to the foundation in current technology requires the use of such instruments and type of inspection reports, combined with the actual development of the country. This part of the standard meter with China specific conditions of production use, the main provisions of such instruments in terms of energy measurement Technical requirements, technical requirements in addition to other energy measurement of electrical parameters measured, should be in accordance to the instructions of the manufacturer. Standard Meter1 ScopeThis section provides terms and definitions of the standard meter, product classification, conditions of use, technical requirements, test methods, inspection rules, marking Chi, packaging and storage, etc. This section applies to the reference frequency of 50Hz (or 60Hz), in the laboratory for testing and calibration of active and (or) reactive energy meter mark Quasi-meter (hereinafter referred to as the instrument).2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 2423.1-2008 Environmental testing for electric and electronic products Part 2. Test methods Test A. Cold (IEC 60068-2-1. 2007, IDT) GB/T 2423.2-2008 Environmental testing for electric and electronic products Part 2. Test methods Test B. Dry heat (IEC 60068-2-2. 2007, IDT) GB/T 2423.5-1995 environmental testing for electric and electronic products Part 2. Test methods experiment Ea and guidance. Shock (IEC 60068-2-27. 1987, IDT) GB/T 2423.10-2008 electric and electronic products environmental testing Part 2. Test methods experiment Fc. Vibration (sinusoidal) (IEC 60068-2-6.1995, IDT) GB/T 2829-2002 periodic inspection Sampling procedures and tables (suitable for process stability test) GB 4208-2008 housing protection (IP Code) (IEC 60529.2001, IDT) GB/T 5169.11-2006 Fire hazard testing for electric and electronic products - Part 11. Glowing/hot-wire based test methods to Glow-wire flammability test method for products (IEC 60695-2-11.2000, IDT) GB/T 5465.2-2008 Graphical symbols for electrical equipment - Part 2. Graphical symbols (IEC 60417DB.2007, IDT) GB 9254-2008 Information technology equipment radio disturbance characteristics - Limits and methods of measurement (IEC /CISPR22.2006, IDT) GB/T 9969-2008 General Industrial Product Manual GB/T 11150-2001 energy meter testing device (IEC 60736. 1982, NEQ) GB/T 13384-2008 mechanical and electrical products packaging General technical conditions GB/T 16927.1-1997 high voltage test techniques - Part 1. General test requirements (IEC 60060-1. 1989, NEQ) GB/T 17215.211-2006 AC measuring equipment General requirements for tests and test conditions - Part 11. Measuring Equipment (IEC 62052-11.2003, IDT) GB/T 17215.321-2008 AC measuring equipment - Specific requirements - Part 21. Static meters for active energy (classes 1 and Level 2) (IEC 62053-21.2003, IDT) GB/T 17215.352-2009 AC measuring equipment - Specific requirements Part 52. Symbols (IEC 62053-52.2005, IDT) GB/T 17626.2-2006 Electromagnetic compatibility - Testing and measurement techniques - Electrostatic discharge immunity test (IEC 61000-4-2.2001, IDT) ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 17215.701-2011_English be delivered?Answer: Upon your order, we will start to translate GB/T 17215.701-2011_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 17215.701-2011_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 17215.701-2011_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |