GB/T 17215.646-2018 English PDFUS$1104.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 17215.646-2018: Electricity metering data exchange -- The DLMS/COSEM suite -- Part 46: Data link layer using HDLC protocol Status: Valid
Similar standardsGB/T 15284 GB/T 17215.321 GB/T 34067.2 GB/Z 17215.652 GB/Z 17215.651 GB/T 17215.647Basic dataStandard ID: GB/T 17215.646-2018 (GB/T17215.646-2018)Description (Translated English): Electricity metering data exchange -- The DLMS/COSEM suite -- Part 46: Data link layer using HDLC protocol Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: N22 Classification of International Standard: 17.220.20 Word Count Estimation: 58,593 Date of Issue: 2018-12-28 Date of Implementation: 2019-07-01 Older Standard (superseded by this standard): GB/T 19897.4-2005 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 17215.646-2018: Electricity metering data exchange -- The DLMS/COSEM suite -- Part 46: Data link layer using HDLC protocol---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Electricity metering data exchange--The DLMS/COSEM suite----Part 46. Data link layer using HDLC protocol ICS 17.220.20 N22 National Standards of People's Republic of China Replace GB/T 19897.4-2005 Electrical measurement data exchange DLMS/COSEM component Part 46. Data link layer using HDLC protocol Part 46. DatalinklayerusingHDLCprotocol (IEC 62056-46.2002, Electricitymetering-Dataexchangeformeterreading, tariffandloadcontrol-Part 46. DatalinklayerusingHDLCprotocol, IDT) Published on.2018-12-28 2019-07-01 implementation State market supervision and administration China National Standardization Administration issued ContentForeword I 1 Scope 1 2 Normative references 1 3 Terms and definitions and abbreviations 2 3.1 Terms and Definitions 2 3.2 Abbreviations 2 4 Overview 3 4.1 LLC Sublayer 3 4.2 MAC Sublayer 3 4.3 Specification Method 3 5 LLC sublayer 4 5.1 The role of the LLC sublayer 4 5.2 LLC Sublayer Service Specification 4 5.3 LLC Sublayer Protocol Specification 13 6 MAC sublayer 15 6.1 HDLC selection 15 6.2 MAC sublayer service specification 16 6.3 Physical layer services used by the MAC sublayer 24 6.4 MAC Sublayer Protocol Specification 25 Appendix A (informative) FCS calculation 47 Appendix B (informative) Data Models and Protocols 51 Appendix C (informative) Data Link Layer Management Service 52 Reference 55ForewordGB/T 17215 "AC measuring equipment" is divided into several parts, GB/T 17215.6 "Electrical measurement data exchange DLMS/COSEM Components are divided into the following sections. --- Part 10. Intelligent Measurement Standardization Framework; --- Part 11. DLMS/COSEM communication configuration standard template; --- Part 31. Local area network use based on twisted pair carrier signals; --- Part 46. Data link layer using HDLC protocol; --- Part 47. DLMS/COSEM transmission layer based on IP network; --- Part 53. DLMS/COSEM application layer; --- Part 61. Object Identification System (OBIS); --- Part 62. COSEM interface class; --- Part 73. Wired and wireless M-Bus communication configurations for local and community networks; --- Part 76. HDLC-based connection-oriented three-layer communication configuration; --- Part 91. Communication configuration using the WEB service to access the COSEM server via CAS; --- Part 97. Communication configuration based on TCP-UDP/IP network. This part is part 46 of GB/T 17215.6. This part is drafted in accordance with the rules given in GB/T 1.1-2009. This part replaces GB/T 19897.4-2005 "Automated meter reading system low-level communication protocol Part 4. Number based on HDLC protocol According to the link layer. Compared with GB/T 19897.4-2005, the main technical changes are as follows. --- HDLC frame type 3 according to Annex H.4 of ISO /IEC 13239 (see 6.4.1); --- The slave may use multiple addressing schemes (see 6.4.2); --- Increase the negotiation of the maximum information length field to improve the HDLC transmission efficiency (see 6.4.4.4.3). This section uses the translation method equivalent to IEC 62056-46.2002 "Electrical Measurement Data Exchange Rates and Load Control Part 46. Use the data link layer of the HDLC protocol. This section incorporates amendments to IEC 62056-46.2002/AMD1.2006, which are subject to the terms The vertical double line (||) of the side margin is marked. The documents of our country that have a consistent correspondence with the international documents referenced in this part are as follows. GB/T 2900.77-2008 Electrotechnical terminology - Electrotechnical measurement and instrumentation - Part 1 [IEC 60050 (300-311)..2001, IDT]; GB/T 2900.79-2008 Electrotechnical terminology - Electrotechnical measurement and instrumentation - Part 3 Type [IEC 60050 (300-313)..2001, IDT]; GB/T 2900.89-2012 Electrotechnical terminology - Electrotechnical measurement and instrumentation - Part 2. General terms [IEC 60050 (300-312)..2001, IDT]; --- GB/T 2900.90-2012 Electrotechnical terminology - Electrical and electronic measurement and instrumentation - Part 4 [IEC 60050 (300-314)..2001, IDT]; ---GB/T 7421-2008 Advanced data link control (HDLC) regulations for telecommunications and information exchange between information technology systems Cheng (ISO /IEC 13239.2002, IDT); ---GB/T 15629.2-2008 Information technology system remote communication and information exchange LAN and metropolitan area network specific Seeking Part 2. Logical Link Control (ISO /IEC 8802-2.1998, IDT); ---GB/T 17215.101-2010 Data exchange terms for electrical measurement meter reading, rates and load control - Part 1. Exchange of data-related terms using DLMS/COSEM measurement equipment (IEC TR62051-1.2004, IDT); ---GB/T 17215.653-2018 Electrical Measurement Data Exchange DLMS/COSEM Components Part 53. DLMS/CO- SEM application layer (IEC 62056-5-3..2017, IDT); --- GB/T 17215.661-2018 Electrical measurement data exchange DLMS/COSEM components - Part 61. Object identification OBIS (IEC 62056-6-1..2017, IDT); ---GB/T 17215.662-2018 Electrical measurement data exchange DLMS/COSEM components - Part 62. COSEM Mouth class (IEC 62056-6-2.2017, IDT); --- GB/T 19897.3-2005 Automatic meter reading system low-level communication protocol Part 3. Connection-oriented asynchronous data exchange Physical layer service process (IEC 62056-42.2002, IDT). This section has made the following editorial changes. --- Standard name adjustment to the new system. Electrical measurement data exchange DLMS/COSEM components Part 46. Using HDLC Association The data link layer of the conference. Please note that some of the contents of this document may involve patents. The issuing organization of this document is not responsible for identifying these patents. This part was proposed by the China Machinery Industry Federation. This part is under the jurisdiction of the National Electrotechnical Instrumentation Standardization Technical Committee (SAC/TC104). This section drafted by. Harbin Electric Instrument Research Institute Co., Ltd., Yunnan Power Grid Co., Ltd. Electric Power Research Institute, Shenzhen City Aerospace Tairuijie Electronics Co., Ltd., China Electric Power Research Institute Co., Ltd., State Grid Jiangxi Electric Power Co., Ltd. Institute, Shenzhen Kelu Electronic Technology Co., Ltd., Ningbo Samsung Medical Electric Co., Ltd., Yantai Oriental Weston Electric Co., Ltd. Division, Guangdong Dongfang Telecommunications Technology Co., Ltd., Shenzhen Longdian Electric Co., Ltd., Ningbo Henglida Technology Co., Ltd., Huali Technology Co., Ltd. Co., Ltd., Heilongjiang Electrician Instrumentation Engineering Technology Research Center Co., Ltd., Zhejiang Chentai Technology Co., Ltd., Qingdao Dingxin Communications Co., Ltd. The main drafters of this section. Shen Xin, Li Wanhong, Guan Wenju, Liu Wei, Deng Gaofeng, Tong Jie, Chen Jie, Jiang Bin, Chen Wenxin, Xu Renheng, Liang Hong, Wang Jun, Hu Shanmei, Yan Ruipeng, Zhao Wei, Chen Weigang, Lu Ruili, Wen Gang, Qin Guoxin, Guo Wei. The previous versions of the standards replaced by this section are. ---GB/T 19897.4-2005. Electrical measurement data exchange DLMS/COSEM component Part 46. Data link layer using HDLC protocol1 ScopeThis part of GB/T 17215.6 specifies a data link layer for connection-oriented, HDLC-based, asynchronous communication protocol sets. To ensure a consistent data link layer service specification for both connection-oriented and connection-free operation, the data link layer is divided into two Sublayer. logical link control sublayer (LLCsub-layer) and medium access control sublayer (MACsub-layer). This section supports the following communication environments. ---Point-to-point and point-to-multipoint configuration; --- Dedicated and switched data transmission equipment; ---Half duplex and full duplex connection; --- Asynchronous start/stop transmission, 1 start bit, 8 data bits, no parity, 1 stop bit. At the same time, the following two special procedures are defined. --- The separately received service user layer PDU part is transmitted from the server side to the client in a transparent manner. Server side service The user layer can send its PDU to the data link layer in fragmented form, and the data link layer can hide the fragment for the client side; --- An event report by sending a UI frame from the slave to the primary station. Appendix B explains the role of data models and protocols for data exchange in electricity meters.2 Normative referencesThe following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. IEC 60050-300.2001 Electrotechnical terminology - Electrotechnical measurement and instrumentation - Part 311. General terms Part 312. General terms for electrical measurements - Part 313. Types of electrical measuring instruments - Part 314. Special Language (InternationalElectrotechnicalVocabulary-Electricalandelectronicmeasurementsandmeasuring instruments-Part 311.Generaltermsrelatingtomeasurements-Part 312.Generaltermsrelatingto electricaleasurements-Part 313. Typesofelectricalmeasuringinstruments-Part 314.Specificterms Accordingtothetypeofinstrument) IEC /T R62051.1999 Electrical measurement terms (Electricity metering-Glossary of terms) IEC 62051-1.2004 Terms of data exchange for metering, tariffs and load control - Part 1. Part 1 COSEM measuring equipment exchanges data related terms (Electricity metering-Dataexchangeformeterreading, tariffandloadcontrol-GlossaryofTerms-Part 1,Termsrelatedtodataexchangewithmetering equipmentusingDLMS/COSEM) IEC 62056-42.2002 Data exchange for metering, rate and load control - Part 42. Connection-oriented asynchronous data Exchanged physical layer service process (Electricity metering-Dataexchangeformeterreading, tariffandloadcon- trol-Part 42. Physicallayerservicesandproceduresforconnectionorientedasynchronousdataex- Change) IEC 62056-53.2006 Data exchange for electrical measurement meter reading, rates and load control - Part 53. COSEM application layer (ElectricitymeteringDataexchangeformeterreading,tariffandloadcontrolPart 53.COSEMAppli- ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 17215.646-2018_English be delivered?Answer: Upon your order, we will start to translate GB/T 17215.646-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 17215.646-2018_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 17215.646-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |