TSG 21-2016 PDF English
US$355.00 · In stock · Download in 9 secondsTSG 21-2016: Supervision Regulation on Safety Technology for Stationary Pressure Vessel Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedureStatus: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivery | Name of Chinese Standard | Status |
| TSG 21-2016 | English | 355 |
Add to Cart
|
0-9 seconds. Auto-delivery
|
Supervision Regulation on Safety Technology for Stationary Pressure Vessel
| Valid |
Excerpted PDFs (Download full copy in 9 seconds upon purchase)PDF Preview: TSG 21-2016
TSG 21-2016: Supervision Regulation on Safety Technology for Stationary Pressure Vessel---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/TSG21-2016
TSG
Special Equipment Safety Technical Specification
Supervision Regulation on Safety Technology for
Stationary Pressure Vessel
[Including No.1 Amendment 2020XG1]
Issued by. General Administration of Quality Supervision, Inspection and
Quarantine
February 22, 2016
Table of Contents
Foreword... 3
1 General... 8
2 Materials... 13
3 Design... 28
4 Manufacturing... 56
5 Installation, modification and repair... 81
6 Supervision and inspection... 83
7 Utilization management... 109
8 Regular inspection... 123
9 Safety accessories and instruments... 163
10 Supplementary provisions... 168
1 General
1.1 Purpose
In order to ensure the safe use of stationary pressure vessels, prevent and
reduce accidents, protect people's lives and property, AND promote economic
and social development, in accordance with the “Law of People's Republic of
China on Special Equipment Safety” and the “Special Equipment Safety
Supervision Regulation”, ESTABLISH this regulation.
1.2 Stationary pressure vessel
The stationary pressure vessel is a pressure vessel installed at a fixed position
(hereinafter referred to as the pressure vessel, Note 1-1).
Note 1-1.As for the pressure vessels which are moved or used only within the
device or the field area for a particular purpose, as well as the cylinders of
portable air compressors, etc., CONDUCT supervision and management based
on the stationary pressure vessel; as for the pressure vessels in the process
equipment which are used as the process device, CONDUCT supervision and
management based on the residual heat boiler manufactured as the pressure
vessel AND in accordance with this regulation.
1.3 Scope of application
This regulation applies to pressure vessels as defined in the special equipment
catalogue AND with the following conditions.
(1) The working pressure is greater than or equal to 0.1 MPa (Note 1-2);
(2) The volume is greater than or equal to 0.03 m3 AND the inner diameter
(as for the non-circular cross section, it refers to the maximum internal
geometry of the section) is greater than or equal to 150 mm (Note 1-3);
(3) The containing medium is gas, liquid and liquefied gas, AND the liquid for
which the maximum operating temperature is higher than or equal to its
normal boiling point (Note 1-4).
Note 1-2.The working pressure is, at the normal operating conditions, the
maximum pressure that may be reached at the top of the pressure vessel
(gauge pressure).
Note 1-3.Volume refers to the geometric volume of the pressure vessel, that
is, the volume as calculated based on the dimensions indicated in the design
drawings (regardless of manufacturing tolerances) AND rounded off. It is
generally necessary to deduct the volume of the internals permanently
attached to the interior of the pressure vessel.
Note 1-4.When the medium in the vessel is liquid the maximum operating
temperature of which is lower than its standard boiling point, if the volume of
the vapor phase space is greater than or equal to 0.03 m3, this regulation is
also applicable.
1.4 Special provisions of the scope of application
The pressure vessel utilization unit shall, with reference to the relevant
provisions of Chapter 7 “Use management” of this regulation, be responsible
for the safety management of the pressure vessels within the scope of this
clause.
1.4.1 Pressure vessels only needed to comply with the general rules, materials,
design, and manufacturing requirements of this regulation
The following pressure vessels within the scope of application of this regulation
only need to comply with the provisions of Chapter 1 to Chapter 4 of this
regulation.
(1) The non-independent pressure vessels in cryogenic units, pressure
vessels in direct-fired absorption refrigeration units, aluminum plate-fin
heat exchangers, AND pressure vessels in cold boxes in process units;
(2) The shell-less heat exchanger containing the second group of media
(Note 1-5);
(3) Ultra-high pressure tube reactor.
Note 1-5.As for the pressure vessel medium grouping, SEE the Appendix A of
this regulation.
1.4.2 Pressure vessels only needed to comply with the general rules, design,
and manufacturing requirements of this regulation
The following pressure vessels within the scope of application of this regulation
only need to comply with the provisions of Chapter 1, Chapter 3, and Chapter
4 of this regulation.
2 Materials
2.1 General requirements for materials
2.1.1 Basic requirements
(1) The selection of pressure vessel material shall take into account of the
material’s mechanical properties, physical properties, process
performance and compatibility with the media;
(2) The performance, quality, specifications and signs of the pressure vessel
materials shall comply with the national standards or the industry
standards of the corresponding materials;
(3) The pressure vessel material manufacturing unit shall, at the prominent
locations on the material, make clear and solid exit-factory steel seal sign
OR other traceable signs;
(4) The manufacturer of pressure vessel material shall provide the quality
certificate to the material utilization unit, AND the content of the material
quality certificate shall be complete, clear and printed with traceable
information mark, and stamped with the quality inspection seal of the
material manufacturing unit;
(5) When the pressure vessel manufacturer, modification and repair unit
obtains the pressure vessel materials from other units than the material
manufacturer, it shall obtain the original quality certificate as provided by
the material manufacturer OR the duplicated copy which is stamped with
the official seal of the material operating unit AND signed (chopped) by
the responsible person;
(6) The manufacture, modification and repair unit of pressure vessel shall be
responsible for the authenticity and consistency of the quality certificate
of pressure vessel material and the material quality certificate as
obtained.
(7) The manufacturer of non-metallic pressure vessels shall have a reliable
method to determine the reliability of the raw material OR the material of
the pressure vessel after forming in the corrosive environment; AND if
necessary, CONDUCT test to verify it.
3 Design
3.1 General design requirements
3.1.1 Qualification and responsibility of design units
(1) The design unit and its principal are responsible for the design quality of
the pressure vessel;
(2) The qualification, design category, variety and scope of the pressure
vessel design unit shall comply with the relevant safety technical
specifications;
(3) The pressure vessel shall be designed in accordance with the basic
safety requirements of this regulation. As for the pressure vessel
designed in accordance with international standards or overseas
standards, the design unit shall provide to the AQSIQ of the compliance
statement and comparison table which states that the design documents
comply with the basic safety requirements of this regulation;
(4) The design unit shall provide the design consigner with the design
documents as specified in 3.1.4.1 of this regulation.
3.1.2 Dedicated design seal
(1) The general design drawing of the pressure vessel must be stamped with
the dedicated design seal of the design unit (duplicated seal is invalid),
AND the drawings stamped with as-built drawing seal shall not be used
for the manufacture of pressure vessels;
(2) The dedicated design seal for the pressure vessel shall at least include
the design unit name, the corresponding qualification certificate number,
the main person in charge, the technical director and so on.
3.1.3 Design conditions
The commissioning party for pressure vessel design shall, in written form,
submit the design conditions of the pressure vessel to the design unit. The
design conditions shall at least include the following.
(1) Operating parameters (including operating pressure, operating
temperature range, liquid level height, pipe connection load, etc.);
(2) The application location and natural conditions of the pressure vessels
(including ambient temperature, seismic fortification intensity, wind and
snow load, etc.);
(3) Medium components and characteristics;
(4) Expected service life;
(5) Geometric parameters and pipe mouth orientation;
(6) Other conditions necessary for design.
4 Manufacturing
4.1 General requirements for manufacturing
4.1.1 Manufacturing units
(1) The manufacturing unit of pressure vessels (including on-site
manufacturing, on-site welding, on-site bonding, Note 4-1) shall obtain a
special equipment manufacturing license AND manufacture within the
range as approved, in accordance with relevant laws and regulations
and safety technical specifications, establish the pressure vessel quality
assurance system AND ensure its effective operation; AND the
manufacturing unit and its main principal shall be responsible for the
manufacturing quality of the pressure vessel;
(2) The manufacturing unit shall strictly enforce the relevant laws and
regulations, safety technical specifications and technical standards, and
in accordance with the technical requirements of the design documents,
manufacture pressure vessels.
Note 4-1.The on-site manufacture, on-site welding, and on-site bonding of
stationary pressure vessels respectively refer to the manufacture at
utilization site of large scale pressure vessel (including spherical tanks)
which cannot be transported, the pressure vessel assembly welding at
utilization site after exit-factory in sections, AND the bonding of non-metallic
pressure vessel at utilization site.
5 Installation, modification and repair
5.1 Installation, modification and repair units
(1) The units engaging in the installation, modification or major repair of
pressure vessels shall be the units that have acquired the corresponding
qualification; the installation, modification and repair unit shall, in
accordance with the requirements of the relevant safety technical
specifications, establish a quality assurance system and implement it
effectively. The installation, modification and repair unit and its main
person in charge shall be responsible for the installation, modification
and repair quality of the pressure vessel;
(2) The installation, modification and repair unit shall strictly enforce laws and
regulations, safety technical specifications, and technical standards;
(3) The installation, modification and repair unit shall provide to the user of
the installation, modification and repair work plan, drawings, construction
quality certificate, and other technical data;
(4) Before the installation, modification and major repair of pressure vessels,
the units engaging in the installation, modification and major repair of
pressure vessels shall give written notice to the local special equipment
safety supervision department.
6 Supervision and inspection
6.1 General requirements for supervision and inspection
6.1.1 Supervision and inspection
The supervision and inspection of pressure vessels (hereinafter referred to as
supervision) shall be conducted in the pressure vessel manufacturing,
renovation and major repair process (no supervision for installation).
Supervision refers to, based on the qualification of the pressure vessel
manufacturing AND the quality inspection and test (hereinafter shortly referred
to as self-inspection) of the renovation and repair unit (hereinafter referred to
as the inspected unit), the process supervision and compliance verification
complying with the basic safety requirements.
The supervision work cannot replace the self-inspection of the inspected units.
6.1.2 Scope of application
6.1.2.1 The product manufactured under supervision
(1) The pressure vessel exit-factory as a whole;
(2) The pressure vessel manufactured on-site, assembled and welded on-
site, And bonded on-site;
(3) The cylinder section, head and spherical shell plate exit-factory
separately with welds, OR the heat exchanging tube bundle as
connected through welding.
7 Utilization management
7.1 Utilization safety management
7.1.1 Obligations of utilization unit
The pressure vessel utilization unit shall, in accordance with the relevant
requirements of the Special Equipment Utilization and Management Rules,
conduct safety management of the pressure vessel, establish safety
management department, allocate safety management responsible person,
safety management personnel and workers, transact utilization registration,
establish each safety management system, establish operation regulations,
AND conduct inspection.
7.1.2 Utilization registration
The utilization unit shall, in accordance with the regulation, before the pressure
vessel is put into use OR within 30 days after putting into use, make application
to the local departments responsible for special equipment utilization
registration (hereinafter referred to as the registration institute) for the Special
Equipment Utilization Registration Certificate (hereinafter referred to as the
utilization registration certificate). When applying for the utilization registration,
the safety status level and the first inspection date shall be determined as
follows.
(1) Use the new pressure vessel the manufacturing data of which is complete
as determined by the registration institute, and its safety status is level
1; the safety status level of the imported pressure vessel shall be
assessed by the special equipment inspection institute conducting the
imported pressure vessel supervision and inspection;
(2) The date of the first regular inspection of the pressure vessel is
determined in accordance with the provisions of 8.1.6 and 8.1.7 of this
regulation, unless otherwise the product standard or the utilization unit
considers it necessary to shorten the inspection period; under special
conditions when it is required to extend the first regular inspection date,
the utilization unit will make written application to state the conditions,
which will be approved by the safety management responsible person of
the utilization unit, and the extension shall not exceed 1 year.
7.1.3 Pressure vessel operating procedures
The pressure vessel utilization units shall, in the process operating procedures
and post operating procedures, clearly make requirements for the pressure
vessel safety operation. The operating procedure shall at least include the
follows.
(1) Operating process parameters (including operating pressure, maximum
or minimum operating temperature);
(2) Post operation method (including the operating procedures and
precautions of start-up and shutdown);
(3) Items and locations to be focused during operation, anomalies may occur
during operation and preventive measures, and emergency disposal and
reporting procedures.
7.1.4 Regular maintenance
The utilization unit shall establish inspection system for pressure vessel
installations, AND conduct regular maintenance of the pressure vessel body
and its safety accessories, loading & unloading accessories, safety protection
device, measurement and control devices, and auxiliary instruments and
meters. The anomalies found shall be timely disposed and recorded, in order
to ensure the pressure vessel in-service always under normal state of use.
8 Regular inspection
8.1 General requirements for regulation inspection
8.1.1 Regular inspection
The regular inspection of pressure vessel means that the special equipment
inspection institute (hereinafter referred to as the inspection institute), based on
certain time period and during the shutdown of the pressure vessel, in
accordance with provisions of this regulation, conducts the compliance
verification of the safety status of the in-service pressure vessel.
8.1.2 Regular inspection procedures
The general procedures for regular inspection include establishment of
inspection plans, preparation before inspection, implementation of inspection,
treatment of defects and problems, summary of inspection results, and issuing
of inspection reports.
8.1.3 Inspection institute and personnel
The inspection institute shall, based on the approved scope of inspection,
engage in the regular inspection of pressure vessels, AND the inspection and
testing personnel (hereinafter referred to as the inspectors) shall obtain the
corresponding special equipment inspection and testing personnel certificates.
The inspection institute shall be responsible for the authenticity, accuracy and
validity of the regular inspection reports of pressure vessels (Note 8-1).
Note 8-1.The authenticity means that the report is based on objective facts
without false evidence; the accuracy means that the accuracy of the testing
data as related to the report comply with relevant requirements; AND the validity
means that the qualification of the inspection institute and inspector complies
with requirements, the inspection basis complies with laws, AND the report
approval procedure complies with the requirements.
8.1.4 Inspection application
The utilization unit shall, before 1 month of the expiry of the regular inspection
period of the pressure vessel, apply to the inspection institute for regular
inspection. After the inspection institute receives the regular inspection
application, it shall arrange the inspection before the expiration of the regular
inspection.
8.1.5 Safety status level
The safety status of the in-service pressure vessel is divided into level 1 to level
5, which will be assessed based on the inspection results and the relevant
provisions of 8.5 and 8.6 of this regulation.
8.1.6 Inspection period
8.1.6.1 Metallic pressure vessel inspection period
The metallic pressure vessel is generally subjected to the first regular
inspection within 3 years after putting into use. AND the subsequent inspection
period will be determined by the inspection institute in accordance with the
safety status level of the pressure vessel and the following requirements.
(1) As for the pressure vessel of safety level 1 and 2, it is generally inspected
once every 6 years;
(2) As for the pressure vessel of safety level 3, it is generally inspected once
every 3 ~ 6 years;
(3) As for the pressure vessel of safety level 4, it will be used under
supervision, AND its inspection period will be determined by the
inspection institute; the accumulated time of utilization under supervision
shall not exceed 3 years, during which the utilization unit shall take
effective monitoring measures;
(4) As for the pressure vessel of safety level 5, it shall deal with the defect;
otherwise it is not allowed to use it continuously.
9.1 Safety accessories
9.1.1 General requirements
(1) The safety valve and rupture disc manufacturing unit shall hold the
corresponding special equipment manufacturing license;
(2) The safety accessories such as safety valves, rupture discs and
emergency shut-off valves which need type test shall be subjected to
type tests by the type testing institutes approved by the AQSIQ AND
obtain the type test certificate;
(3) The design and manufacturing of safety accessories shall be in
accordance with the relevant safety technical specifications;
(4) The safety accessories shall, during exit-factory, be accompanied by
product quality certification documents, AND equipped tightly with a
metallic nameplate;
(5) Safety accessories regular inspection system, the regular inspection of
safety accessories shall follow the provisions of this regulation of
relevant safety technical specifications.
...... Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Tips & Frequently Asked QuestionsQuestion 1: How long will the true-PDF of English version of TSG 21-2016 be delivered?Answer: The full copy PDF of English version of TSG 21-2016 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice. Question 2: Can I share the purchased PDF of TSG 21-2016_English with my colleagues?Answer: Yes. The purchased PDF of TSG 21-2016_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- TSG 21-2016 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.
How to buy and download a true PDF of English version of TSG 21-2016?A step-by-step guide to download PDF of TSG 21-2016_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD). Step 2: Search keyword "TSG 21-2016". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9
|