| SN/T 1843.2: Evolution and historical versions
	
		
			| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |  
			| SN/T 1843.2-2013 | English | 399 | Add to Cart | 3 days [Need to translate] | Rules for the inspection of electrical equipment for measurement, control, and laboratory use for import and export. Part 2: Alternating current static watt-hour meters | Obsolete | SN/T 1843.2-2013 |  
			| SN/T 1843.2-2006 | English | 399 | Add to Cart | 3 days [Need to translate] | Import and export instrumentation testing procedures - Part 2: Static AC power meter | Obsolete | SN/T 1843.2-2006 |  
	 
       PDF similar to SN/T 1843.2-2013 
 Basic data             | Standard ID | SN/T 1843.2-2013 (SN/T1843.2-2013) |           | Description (Translated English) | Rules for the inspection of electrical equipment for measurement, control, and laboratory use for import and export. Part 2: Alternating current static watt-hour meters |           | Sector / Industry | Commodity Inspection Standard (Recommended) |           | Classification of Chinese Standard | N22 |           | Classification of International Standard | 17.220.20 |           | Word Count Estimation | 10,175 |           | Older Standard (superseded by this standard) | SN/T 1843.2-2006 |           | Quoted Standard | GB/T 2828.1; GB/T 17215.211-2006; GB/T 17215.321-2008; GB/T 17215.322-2008; GB/T 17215.323-2008 |           | Regulation (derived from) | National quality recognition (2013) 569 |           | Issuing agency(ies) | General Administration of Customs |           | Summary | This standard specifies the sampling and export static AC power meter to determine test methods and test results. This standard applies to one or more measurement devices and counters and packed in the same case which consists of indoor and outdoor use st | SN/T 1843.2-2013: Rules for the inspection of electrical equipment for measurement, control, and laboratory use for import and export. Part 2: Alternating current static watt-hour meters---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
 Rules for the inspection of electrical equipment for measurement, control, and laboratory use for import and export Part 2. Alternating current static watt-hour meters
People's Republic of China Entry-Exit Inspection and Quarantine Standards
Instead of the SN/T 1843.2-2006
Importers measurement, control and laboratory use electrical equipment
Test procedures - Part 2. Static AC power meter
measurement, control, andlaboratoryuseforimportandexport-
Part 2. Alternatingcurrentstaticwatt-hourmeters
Issued on. 2013-11-06
2014-06-01 implementation
People's Republic of China
The State Administration of Quality Supervision, Inspection and Quarantine released
 ForewordSN/T 1843 "Importers measurement, control and laboratory testing procedures for electrical equipment" is divided into three parts.
--- Part 1. General requirements;
--- Part 2. Static AC power meter;
--- Part 3. Analog/digital multimeter.
This section SN/T 1843 Part 2.
This section drafted in accordance with GB/T 1.1-2009 given rules.
The partial replacement of SN/T 1843.2-2006 "Importers measurement, control and laboratory inspection of electrical equipment - Part 2. Static
Only AC power meter ", compared with the SN/T 1843.2-2006, the main changes are as follows.
--- National standards in Chapter 2, "normative references" new release
(GB/T 17215.211-2006/IEC 62052-11.2003, GB/T 17215.321-2008/IEC 62053-21.2003,
GB/T 17215.322-2008/IEC 62053-22.2003, GB/T 17215.323-2008/IEC 62053-23.2003)
Replace the old national standard (GB/T 17215-2002, GB/T 17882-1999, GB/T 17883-1999).
--- "5.5 Sampling Inspection. Sampling" in the Health Check program to check the level of a sample has been adjusted, and increased acceptance quality limit
(AQL value).
--- "5.5 Sampling Inspection. Inspection content" requirements and test methods, according to newly released national standards will be adjusted accordingly,
Increase substandard classification.
--- "5.5 sampling. results found" in the adjusted by acceptance quality limit (AQL value) is determined.
Please note that some of the content of this document may involve patents. Release mechanism of the present document does not assume responsibility for the identification of these patents.
This section proposed and managed by the National Certification and Accreditation Administration Committee.
This section drafted by. People's Republic of China Zhejiang Exit Inspection and Quarantine.
The main drafters of this section. Xu Yongli, Lu Yang, WeiWeired package, on behalf of help.
This part of the standard replaces the previous editions are.
--- SN/T 1843.2-2006.IntroductionThis part is the import and export static AC power meter inspection work in accordance with the import and export static AC power meter test and play a guiding
Normative role.
With China's accession to the World Trade Organization (WTO) and the "People's Republic of China Import and Export Commodity Inspection Law" and its implementing regulations amendments, out
Export Commodity Inspection work has changed greatly. To adapt to the situation and changes in the national inspection and quarantine department in charge of inspection and quarantine organizations have established standard
Registration system.
This part belongs to the standard system of inspection and quarantine fourth floor --- personality standard that specifies the requirements for import and export inspection static AC power meter.
Importers measurement, control and laboratory use electrical equipment
Test procedures - Part 2. Static AC power meter1 ScopeSN/T 1843 provisions of this part of the sampling and export static AC power meter, the determination of test methods and test results.
This section applies to both indoor and outdoor by one or more measuring elements and counters and packed in the same case which consists of using static cross
Import and Export Inspection flow meter.
Scope of this section.
--- Level 1 and 2 static AC active energy meter;
--- 0.2S and 0.5S grade level static AC active energy meter (only for indoor use);
--- Level 2 Level 3 static AC reactive power meter.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 2828.1 Sampling procedures for inspection - Part 1. by acceptance quality limit (AQL) retrieval batch inspection sampling plan
GB/T 17215.211-2006 AC measuring equipment General requirements, tests and test conditions Part 11. measuring equipment
GB/T 17215.321-2008 AC measuring equipment - Specific requirements - Part 21. Static meters for active energy (level 1 and level 2)
GB/T 17215.322-2008 AC measuring equipment - Specific requirements Part 22. Static meters for active energy (0.2S level and
Class 0.5S)
GB/T 17215.323-2008 AC measuring equipment - Specific requirements - Part 23. Static reactive energy (classes 2 and 3)3 Terms and DefinitionsGB/T 2828.1, GB/T 17215.211-2006, GB/T 17215.321-2008, GB/T 17215.322-2008,
GB/T 17215.323-2008 defined and the following terms and definitions apply to this document.
3.1
Type Test mode modeoftypetest
According to a predetermined cycle based on the mandatory requirements of national technical specifications type testing, according to on-site inspection requirements for product pumping batch inspection
Inspection, supervision and implementation of the conformity assessment activities of the enterprise quality management system.
3.2
Compliance Verification mode modeofcomplianceverification
According to the mandatory requirements of national technical specifications, inspection certificate and inspection documents, goods are consistent with the random testing can be carried out when necessary, and real
Shi conformity assessment activities supervision.
3.3
Sampling mode modeofsamplinginspection
According to the mandatory requirements of national technical specifications, batch import and export commodities or pumping grant implementation sampling, testing and inspection of conformity assessment activities.
 
 |