|
US$439.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 38254-2019: Automatic control device for fire alarm receiving and dispatching system Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 38254-2019 | English | 439 |
Add to Cart
|
4 days [Need to translate]
|
Automatic control device for fire alarm receiving and dispatching system
| Valid |
GB/T 38254-2019
|
PDF similar to GB/T 38254-2019
Basic data | Standard ID | GB/T 38254-2019 (GB/T38254-2019) | | Description (Translated English) | Automatic control device for fire alarm receiving and dispatching system | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | C81 | | Classification of International Standard | 13.220.10 | | Word Count Estimation | 22,229 | | Date of Issue | 2019-12-10 | | Date of Implementation | 2020-07-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 38254-2019: Automatic control device for fire alarm receiving and dispatching system---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Fire alarm acceptance linkage control device)
ICS 13.220.10
C81
National Standards of People's Republic of China
Fire alarm acceptance linkage control device
2019-12-10 release
2020-07-01 implementation
State Administration of Market Supervision and Administration
Issued by the National Standardization Management Committee
Contents
Foreword Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 Requirement 1
5 Test method 5
6 Inspection rules 9
7 Logo 10
Appendix A (Normative Appendix) Communication Protocol for Fire Alarm Acceptance Linkage Control Device
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
Please note that some content of this document may involve patents. The issuer of this document does not assume responsibility for identifying these patents.
This standard was proposed by the Ministry of Emergency Management of the People's Republic of China.
This standard is under the jurisdiction of the National Fire Standardization Technical Committee (SAC/TC113).
This standard was drafted by. Shenyang Fire Research Institute of Emergency Management Department, Tianwei Information Technology Co., Ltd.
Equipment Co., Ltd.
The main drafters of this standard. Liu Haixia, Sui Hulin, Li Zhigang, Wang Jun, Qi Baojin, Du Yang, Teng Bo, Fan Yufeng, Ma Qingbo, Gao Wenjun,
Chen Chundong, Jiang Xueyun, Liu Meng, Zhang Lei, Zhang Di, Feng Guobing, Yang Shufeng, An Zhenpeng.
Fire alarm acceptance linkage control device
1 Scope
This standard specifies the terms and definitions, requirements, test methods, inspection rules and signs of the fire alarm acceptance linkage control device.
This standard applies to the linkage control device of the fire alarm acceptance system of fire rescue agencies.
2 Normative references
The following documents are essential for the application of this document. For dated references, only the dated version applies to this article
Pieces. For the cited documents without date, the latest version (including all amendments) applies to this document.
GB/T 9969 General Instructions for Use of Industrial Products
GB 12978 Fire Electronic Product Inspection Rules
GB 16281 Fire Alarm Acceptance System
GB/T 16838 Environmental Test Method and Severity Level of Fire Electronic Products
GB/T 17626.2 Electromagnetic compatibility test and measurement technology Electrostatic discharge immunity test
GB/T 17626.3 Electromagnetic compatibility test and measurement technology RF electromagnetic field radiation immunity test
GB/T 17626.4 Electromagnetic compatibility test and measurement technology Electrical fast transient pulse group immunity test
GB/T 17626.5 EMC test and measurement technology surge (shock) immunity test
GB/T 17626.6 Electromagnetic compatibility test and measurement technology RF field induced conducted disturbance immunity
RFC0768 UPD protocol (Userdatagramprotocol)
RFC0791 IP protocol (Internetprotocol)
RFC0793 TCP protocol (Transmissioncontrolprotocol)
3 Terms and definitions
The terms and definitions defined in GB 16281 and the following apply to this document.
3.1
Fire alarm acceptance linkage control device automaticcontroldeviceforfirealarmreceivinganddispatchingsystem
In the fire communication command system, it can receive the instructions of the fire alarm acceptance system, control the police lights, bells (siren), broadcasting, lighting, garage doors, etc.
Device for starting and stopping externally connected equipment.
4 requirements
4.1 Basic functions of fire alarm acceptance linkage control device
4.1.1 The fire alarm acceptance linkage control device (hereinafter referred to as the device) shall have the function of on-off control of the AC and DC circuits. by
Control the on/off of the AC/DC loop, and realize the activation of the linked equipment such as alarm lights, bells (siren), broadcasting, lighting, garage doors, etc. connected externally of the device
Start and stop; the number of loops for linkage control should be no less than 8.
4.1.2 There should be a data communication interface that can perform data communication and clock synchronization with the fire alarm acceptance system according to the communication protocol specified in Appendix A.
4.1.3 The power, operation status, communication failure and on-off status of the linkage control circuit should be entered through the indicator or text display
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 38254-2019_English be delivered?Answer: Upon your order, we will start to translate GB/T 38254-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 38254-2019_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 38254-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|