|
US$279.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 34599-2017: Ramp control system application requirements Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 34599-2017 | English | 279 |
Add to Cart
|
3 days [Need to translate]
|
Ramp control system application requirements
| Valid |
GB/T 34599-2017
|
PDF similar to GB/T 34599-2017
Basic data | Standard ID | GB/T 34599-2017 (GB/T34599-2017) | | Description (Translated English) | Ramp control system application requirements | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | L79 | | Classification of International Standard | 35.100.01 | | Word Count Estimation | 14,139 | | Date of Issue | 2017-10-14 | | Date of Implementation | 2018-05-01 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
GB/T 34599-2017: Ramp control system application requirements---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Ramp control system application requirements
ICS 35.100.01
L79
National Standards of People's Republic of China
Ramp Control System Setup Requirements
2017-10-14 Published
2018-05-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
China National Standardization Administration released
Directory
Foreword Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 symbol 2
5 basic requirements 2
6 control conditions and strategies 3
7 system structure and function 4
8 equipment and facilities layout requirements 6
9 central control system requirements 7
Appendix A (informative) ramp regulation algorithm 9
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard is proposed and managed by the National Intelligent Transport System Standardization Technical Committee (SAC/TC268).
This standard drafting unit. Shanghai Urban Construction Design and Research Institute (Group) Co., Ltd., Ministry of Transport Road Research Institute, Beijing
China Communications Technologies Co., Ltd. Tong Tong, Tongji University, Shanghai Branch of Intelligent Systems Co., Ltd., Jiangsu Province, traffic planning
Accounting Institute Co., Ltd.
The main drafters of this standard.Police Lixia, Liu Weijie, Ji Jinzhang, Chen Hongjie, Ma Wanjing, Chen Hong, Peng Qingyan, Wang Wei Feng, Lu Xiaofang,
Zhang Jiancang, Wang Qilin, Shen Ming, Yang Gencheng, Gao Xiang, Ni Wei, Wang Baohui, Yu Hong, Wang Liang.
Ramp Control System Setup Requirements
1 Scope
This standard specifies the city expressway entrance ramp control system planning, design, implementation process and field, central control system settings
basic requirements.
This standard applies to the urban expressway ramp entrance ramp control strategy selection, system construction and equipment layout, guide the expressway control system
Planning, design, construction and management. Highway entrance ramp, bridge entrance control can refer to the implementation.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB 5768.3 Road traffic signs and marking Part 3. Road traffic marking
GB 14886 Road traffic signal setting and installation specifications
GB 14887 Road traffic lights
GB/T 19582.1 Modbus based industrial automation network specification Part 1. Modbus Application Protocol
CJJ37 Urban Road Design Code
CJJ129 urban expressway design rules
GA/T 484 LED Road Traffic Induces Variable Message Signs
GA/T 496 red light automatic recording system General technical conditions
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Expressway entrance ramp expresswayentranceramp
Into the expressway main line of the dedicated road.
3.2
Ramp control rampcontrol
By setting a dedicated signal on the ramp to control the traffic flow into the expressway, including the ramp off, ramp adjustment and other means.
3.3
Ramp closes rampclosure
Prohibit vehicles from entering the ramp into the expressway.
3.4
Ramp regulation rampmetering
Set on-ramp signal to allow vehicles to enter the expressway at timed intervals.
3.5
Timing ramp adjustment pre-timedrampmetering
According to historical traffic data, a fixed, or according to changes in the time of day and a few pre-set fixed ramp rate
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 34599-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 34599-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 34599-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 34599-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|