GB/T 31235-2024: Technical specification for fittings of ±800 kV DC overhead transmission line
Status: Valid

GB/T 31235: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 31235-2024English279 Add to Cart 3 days [Need to translate] Technical specification for fittings of ±800 kV DC overhead transmission line Valid GB/T 31235-2024
GB/T 31235-2014English259 Add to Cart 3 days [Need to translate] Technical specification for fittings of ±800kV DC overhead transmission line Valid GB/T 31235-2014

PDF similar to GB/T 31235-2024


Standard similar to GB/T 31235-2024

GB/T 37404   GB/T 2694   GB/T 31487.3   GB/T 31245   GB/T 31239   

Basic data

Standard ID GB/T 31235-2024 (GB/T31235-2024)
Description (Translated English) Technical specification for fittings of ��800 kV DC overhead transmission line
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard K47
Classification of International Standard 29.240.20
Word Count Estimation 14,196
Date of Issue 2024-12-31
Date of Implementation 2025-07-01
Older Standard (superseded by this standard) GB/T 31235-2014
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 31235-2024: Technical specification for fittings of ±800 kV DC overhead transmission line

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 29.240.20 CCSK47 National Standard of the People's Republic of China Replaces GB/T 31235-2014 ±800kV DC transmission line hardware technical specifications Released on 2024-12-31 2025-07-01 Implementation State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 2 4 General requirements 2 5 Technical Requirements 2 6 Test methods and judgment criteria 6 7 Requirements for signs and accompanying documents 6 8 Packaging requirements 6 Appendix A (Normative) Corona and radio interference test methods 8

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document replaces GB/T 31235-2014 "Technical Specification for ±800kV DC Transmission Line Fittings" and GB/T 31235-2014 Compared with the previous version, in addition to structural adjustments and editorial changes, the main technical changes are as follows. a) Added a chapter on “Terms and Definitions” (see Chapter 3); b) Added the manufacturing process and rubber requirements for spacer bars (see 5.1); c) Changed the spacer flexibility and clamp parameter requirements (see 5.1, 4.1 of the.2014 edition); d) Added the manufacturing process requirements for suspension clamps (see 5.2); e) The key dimensions and material performance requirements for tension clamps and joint fittings have been changed (see 5.3, 4.3 of the.2014 edition); f) The requirements for the manufacturing process of connection fittings such as U-shaped hanging rings and right-angle hanging plates have been changed (see 5.5, 4.5 of the.2014 edition); g) Added the recommended material and material performance requirements for connection fittings in low temperature operating environments (see 5.5); h) Added the requirements for pre-twisted wires of pre-twisted anti-vibration hammers (see 5.7); i) The material properties requirements for steel strands have been changed (see 5.7, 4.7 of the.2014 edition); j) Deleted Table 3 “Items and quantities of ±800kV DC line fittings test” (see Chapter 7 of the.2014 edition). Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed by the China Electricity Council. This standard is under the jurisdiction of the National Technical Committee for Standardization of High Voltage Direct Current Transmission Engineering (SAC/TC324). This document was drafted by. China Electric Power Research Institute Co., Ltd., State Grid Jiangsu Electric Power Co., Ltd., State Grid Corporation of China, China Power Construction Group Chengdu Electric Hardware Co., Ltd., China Energy Construction Group Nanjing Line Equipment Co., Ltd., China Power Construction Group Siping Line Road Equipment Co., Ltd., China Energy Engineering Group Anhui Electric Power Design Institute Co., Ltd., Shandong Electric Power Engineering Consulting Institute Co., Ltd., Huzhou Tailun Electric Power Equipment Co., Ltd., Jiangdong Hardware Equipment Co., Ltd., Xi'an Chuangyuan Electric Power Hardware Co., Ltd., Jiangsu Jiekai Electric Power Equipment Co., Ltd. Company, Jiangsu Tiannan Electric Power Co., Ltd., Zhejiang Taichang Industrial Co., Ltd., Shanghai Yonggu Electric Power Equipment Co., Ltd., China Southern Power Grid Nanning Branch of Ultra-high Voltage Transmission Company Limited, China Southern Power Grid Digital Grid Group Co., Ltd., Jiangsu Shuanghui Electric Power Development Co., Ltd. Co., Ltd., Pinggao Group Co., Ltd., China Power Construction Group Henan Electric Power Equipment Co., Ltd., and Liaoning Jinxing Electric Power Hardware Technology Co., Ltd. The main drafters of this document are. Zhou Lixian, Si Jiajun, Zhao Jiangtao, Liu Shengchun, Mao Yan, Cheng Shuyi, Gu Chen, Tan Li, Wang Shengqiang, Du Yijun, Zhang Jian, Su Jian, He Ning'an, Chen Haomin, Niu Haijun, Cao Maofeng, Xian Li, Wang Huiping, Wang Hong, Han Zhuping, Zhao Yutian, Chen Guohua, Mao Xinguo, Wu Caihong, Liu Zhen, Yan Jun, Zhu Xiaoqiang, Wang Enjiu, Zheng Lefei. The previous versions of this document and the documents it replaces are as follows. ---First published in.2014 as GB/T 31235-2014; ---This is the first revision. ±800kV DC transmission line hardware technical specifications

1 Scope

This document specifies the general requirements, technical requirements, judgment criteria, markings and accompanying documents for ±800kV DC overhead transmission line fittings. The requirements for parts and packaging are described, and the corresponding test methods are described. This document applies to the design, manufacture, testing, and acceptance of ±800kV DC overhead transmission line hardware.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 93 standard spring washers GB/T 95 Flat Washers Grade C GB/T 229 Charpy pendulum impact test method for metallic materials GB/T 699 High-quality carbon structural steel GB/T 700 Carbon structural steel GB/T 1173 Cast aluminum alloys GB/T 2314 General technical requirements for power fittings GB/T 2315 Nominal breaking load series and connection type dimensions of power fittings GB/T 2317.4 Test methods for electrical fittings Part 4.Acceptance rules GB/T 3190 Chemical composition of wrought aluminum and aluminum alloys GB/T 3880 (all parts) Aluminium and aluminium alloy plates and strips for general industrial use GB/T 4437.1 Aluminium and aluminium alloy hot extruded tubes Part 1.Seamless round tubes GB/T 5075 Terminology of electrical fittings DL/T 284 Hot-dip galvanized bolts and nuts for transmission line towers and power fittings DL/T 683 Model naming method for power fittings DL/T 756 Suspension Clamp DL/T 757 Strain Clamp DL/T 758 Connecting fittings DL/T 759 Connecting fittings DL/T 760.3 Voltage-equalizing rings, shielding rings and voltage-equalizing shielding rings DL/T 763 Technical requirements for pre-twisted fittings for overhead lines DL/T 764 Hexagonal head bolts with pin holes for electric power fittings DL/T 768.2 Manufacturing quality of electrical fittings Part 2.Ferrous metal forgings DL/T 768.3 Manufacturing quality of electrical fittings Part 3.Stampings DL/T 768.5 Manufacturing quality of electrical fittings Part 5.Aluminum parts DL/T 768.6 Manufacturing quality of electrical fittings Part 6.Welded parts and thermally cut parts DL/T 768.7 Hot dip galvanized coating of steel parts for manufacturing quality of electric power fittings

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 31235-2024_English be delivered?

Answer: Upon your order, we will start to translate GB/T 31235-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 31235-2024_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 31235-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 31235-2024?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 31235-2024 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.