HOME   Cart(1)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 18134.1-2000 English PDF

US$599.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 18134.1-2000: High-voltage testing techniques with very fast impulses. Part 1: Measuring systems for very fast front overvoltages generated in gas-insulated substations
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 18134.1-2000English599 Add to Cart 3 days [Need to translate] High-voltage testing techniques with very fast impulses. Part 1: Measuring systems for very fast front overvoltages generated in gas-insulated substations   GB/T 18134.1-2000

PDF similar to GB/T 18134.1-2000


Standard similar to GB/T 18134.1-2000

GB/T 19212.5   GB/T 10228   GB/T 25095   GB/T 16896.3   GB/T 34577   GB/T 16896.1   

Basic data

Standard ID GB/T 18134.1-2000 (GB/T18134.1-2000)
Description (Translated English) High-voltage testing techniques with very fast impulses. Part 1: Measuring systems for very fast front overvoltages generated in gas-insulated substations
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard K40
Classification of International Standard 19.080
Word Count Estimation 17,163
Date of Issue 2000-07-14
Date of Implementation 2000-12-01
Quoted Standard GB/T 16927.1-1997; GB/T 16027.2-1997; GB 7674-1997; IEC 61259-1994
Adopted Standard IEC 61321-1-1994, IDT
Issuing agency(ies) State Quality and Technical Supervision
Summary This standard applies to measuring gas-insulated metal-enclosed substations (GIS) due to operation or disruptive discharge overvoltage steep wave front, particularly suitable for measuring the following three steep wave front overvoltage device [1] and the entire measurement system: a) internal steep wave front overvoltage, b) transient voltage shell, c) external steep wave front overvoltages. Considered in this standard is limited in time parameters within 10��s. Estimating uncertainty of measurement procedures described in IEC 61259 applies to internal steep wave front overvoltage test level. Uncertainty estimates are based on tests specified in IEC 61259 is expected to generate an internal circuit overvoltage steep wave front in the typical waveforms.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 18134.1-2000_English be delivered?

Answer: Upon your order, we will start to translate GB/T 18134.1-2000_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 18134.1-2000_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 18134.1-2000_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.