US$1419.00 · In stock Delivery: <= 9 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 50966-2024: (Design Standards for Electric Vehicle Charging Stations (with Explanations)) Status: Valid GB/T 50966: Evolution and historical versions
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 50966-2024 | English | 1419 |
Add to Cart
|
9 days [Need to translate]
|
(Design Standards for Electric Vehicle Charging Stations (with Explanations))
| Valid |
GB/T 50966-2024
|
GB 50966-2014 | English | 85 |
Add to Cart
|
0--9 seconds. Auto-delivery
|
Code for design of electric vehicle charging station
| Valid |
GB 50966-2014
|
Standard similar to GB/T 50966-2024 GB/T 51033 GB/T 50082
Basic data Standard ID | GB/T 50966-2024 (GB/T50966-2024) | Description (Translated English) | (Design Standards for Electric Vehicle Charging Stations (with Explanations)) | Sector / Industry | National Standard (Recommended) | Word Count Estimation | 70,770 | Date of Issue | 2024-12-26 | Date of Implementation | 2025-05-01 | Issuing agency(ies) | Ministry of Housing and Urban-Rural Development of the People's Republic of China; State Administration for Market Regulation | Summary | This standard applies to the design of electric vehicle charging stations using the whole vehicle charging mode. |
GB 50966-2014: Code for design of electric vehicle charging station---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
GB
NATIONAL STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
UDC
P GB 50966-2014
Code for design of
electric vehicle charging station
Issued by. Ministry of Housing and Urban-Rural Development of the
People’s Republic of China;
General Administration of Quality Supervision, Inspection
and Quarantine of the People's Republic of China.
Issued on: JANUARY 29, 2014
Implemented on: OCTOBER 1, 2014.
Table of Contents
1 General ... 7
2 Terms and symbols ... 7
2.1 Terms ... 7
2.2 Symbols ... 8
3 Scale and site selection ... 9
3.1 Scale ... 9
3.2 Site selection ... 9
4 General plane layout ... 10
4.1 General requirement ... 10
4.2 Layout of charging equipment and buildings ... 11
4.3 Roads ... 11
5 Charging system ... 12
5.1 Off-board charger ... 12
5.2 AC charging piles ... 14
6 Power supply and distribution system ... 15
6.1 Power requirement ... 15
6.2 Power supply and distribution ... 15
7 Power quality ... 16
8 Metering... 17
9 Monitoring and communication system ... 19
9.1 System construction ... 19
9.2 Charging monitoring system ... 20
9.3 Power supply monitoring system ... 21
9.4 Security and protection monitoring system ... 21
9.5 Communication system ... 22
10 Civil engineering ... 22
10.1 Buildings ... 22
10.2 Water supply and drainage ... 23
10.3 Heating, ventilation and air conditioning ... 23
10.4 Civil electric ... 24
11 Water supply and extinguishing installation for fire fighting ... 25
12 Energy-saving and environment protection ... 26
12.1 Energy-saving of buildings, equipment and materials ... 26
12.2 Noise control ... 26
Appendix A ... 27
Monitoring system structure diagrammatic sketch of charging station ... 27
Explanation of wording in this Code ... 28
List of quoted standards ... 29
Foreword
This Code is based on the requirements of Announcement on Issuing < 2010 Code for the
Formulation and Revision Plan of the Engineering Construction Standard > (JB (2010)
No.43) issued by the Ministry of Housing and Urban-Rural Development of the People’s
Republic of China. It was jointly formulated by State Grid Corporation of China and China
Electricity Council, as well as the relevant organizations.
During the formulation of this Code, the drafting team conducts in-depth investigation,
seriously summarizes the experience of EV charging station in China, draws lessons from
the existing standards of related enterprises in China and relevant standards of foreign
developed industrial countries, takes advices extensively, discusses for many times, and
finally reviews and finalizes.
This Code is divided into 12 chapters and 1 appendix, which mainly includes the following
technical contents. General provisions, terms and symbols, scale and site selection,
general plane layout, charging system, power supply and distribution system, power
quality, metering, monitoring and communication system, civil engineering, water supply
and extinguishing installation for fire-fighting, energy saving and environment protection,
etc.
The articles in bold-face marked in this Code are mandatory, which shall be executed
strictly.
Ministry of Housing and Urban-Rural Development of the People’s Republic of China is
responsible for the management and interpretation of the mandatory provisions; the China
Electricity Council is responsible for daily management; and the State Grid Corporation of
China is responsible for the interpretation of the specific technical contents. If the
specification needs to be revised and supplemented during the enforcement, please mail
the opinions and suggestions to the State Grid Corporation of China (Address. No.86,
West Chang’an Road, Xicheng District, Beijing, Postal code. 100031) for the reference of
future revision.
Chief drafting organizations, participating drafting organizations, main drafters and main
examiners of this Code.
Chief drafting organizations.
State Grid Corporation of China
China Electricity Council
Participating drafting organizations.
Beijing Economic and Technological Institute of Electric Power
Code for design of
electric vehicle charging station
1 General
1.0.1 In order to make the design of electric vehicle charging stations implement the
relevant national policies and guidelines, unify the technical requirements, and to be safe
and reliable, technologically advanced and economic reasonable, hereby this Code is
formulated.
1.0.2 This specification applies to the design of electric vehicle charging stations using
vehicle charging mode.
1.0.3 The design of electric vehicle charging stations shall comply with the following
principles.
1 Implementing national laws and regulations, and complying with the requirements of
regional and national economy and social development planning.
2 Coordinating with the local regional master plan and the town planning.
3 Complying with the requirements of fire safety, electrical safety and environmental
protection.
4 Actively and steadily using new technology, new equipment and new materials to
promote technological innovation.
1.0.4 In addition to complying with this Code, the design of the electric vehicle charging
stations shall comply with the provisions of existing national standards.
2 Terms and symbols
2.1 Terms
2.1.1 Vehicle charging mode
The manner of directly connecting the electric vehicle to the charging equipment through
connection set for charging.
2.1.2 EV charging station
Sites where provide electric energy to electric vehicle using vehicle charging mode shall
include the charging equipment for 3 sets and more electric vehicles (at least one
off-board charger), related power supply units, monitoring equipment and other support
equipment. Hereinafter referred to as charging station.
2.1.3 Charging system
System that is consisted of all charging equipment, cables and related auxiliary equipment
within the charging stations.
2.1.4 Charging equipment
Equipment that connects to the electric vehicle or power storage battery, and supplies
power for them, including on-board charger, off-board charger, AC charging piles and
other equipment.
2.1.5 Off-board charger
Special equipment that is rigidly installed on the ground converting the grid AC power to
DC power and charging power to the electric vehicle power storage battery by use of the
conduction mode.
2.1.6 AC charging piles ...
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 50966-2024_English be delivered?Answer: Upon your order, we will start to translate GB/T 50966-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 6 ~ 9 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 50966-2024_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 50966-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 50966-2024?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 50966-2024 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|