US$449.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. CJ/T 125-2014: Steel framed polyethylene plastic pipes and fittings for supply of gaseous fuels Status: Valid CJ/T 125: Evolution and historical versions
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
CJ/T 125-2014 | English | 449 |
Add to Cart
|
3 days [Need to translate]
|
Steel framed polyethylene plastic pipes and fittings for supply of gaseous fuels
| Valid |
CJ/T 125-2014
|
CJ/T 125-2000 | English | 519 |
Add to Cart
|
4 days [Need to translate]
|
Steel framed polyethylene plastic pipes for the supply of gaseous fuels
| Obsolete |
CJ/T 125-2000
|
PDF similar to CJ/T 125-2014
Basic data Standard ID | CJ/T 125-2014 (CJ/T125-2014) | Description (Translated English) | Steel framed polyethylene plastic pipes and fittings for supply of gaseous fuels | Sector / Industry | Urban Construction Industry Standard (Recommended) | Classification of Chinese Standard | P47 | Classification of International Standard | 91.140 | Word Count Estimation | 17,114 | Date of Issue | 9/11/2014 | Date of Implementation | 2/1/2015 | Older Standard (superseded by this standard) | CJ/T 125-2000; CJ/T 126-2000 | Quoted Standard | GB/T 228.1; GB/T 709; GB/T 1033.1; GB/T 2828.1; GB/T 2918; GB/T 3681; GB/T 3682; GB/T 13021; GB 15558.1-2003; GB/T 18251; GB/T 18476; GB/T 19466.6; HG/T 3092; YB/T 5294; GB/T 6111; GB/T 6671; GB/T 8806 | Regulation (derived from) | People's Republic of China Ministry of Housing and Urban-Rural Development Notice No. 547 | Issuing agency(ies) | Ministry of Housing and Urban-Rural Development of the People's Republic of China | Summary | This Standard specifies the terms and definitions of gas steel reinforced polyethylene plastic composite pipe and steel reinforced polyethylene plastic pipe fittings, raw materials, general provisions, requirements, test methods, inspection rules, marking |
CJ/T 125-2014: Steel framed polyethylene plastic pipes and fittings for supply of gaseous fuels---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Steel framed polyethylene plastic pipes and fittings for supply of gaseous fuels
ICS 91.140
P47
People's Republic of China urban construction industry standards
Replacing CJ/T 125-2000, CJ/T 126-2000
Gas steel frame polyethylene plastic composite pipe and fittings
2014-09-11 released
2015-02-01 implementation
Ministry of Housing and Urban-Rural Development, People's Republic of China released
Directory
Foreword Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 raw materials 2
5 General Provisions 3
6 Requirements 4
7 Test Method 6
8 Inspection rules 8
9 Identification, packaging, transportation and storage 9
Appendix A (Normative) Pipe end structure and basic parameters 11
Appendix B (Normative) fused socket structure and basic parameters 13
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard replaces CJ/T 125-2000 "gas steel frame polyethylene plastic composite pipe" and CJ/T 126-2000 "gas steel
Polyethylene plastic composite pipe fittings. "
This standard is CJ/T 125-2000 "gas steel skeleton polyethylene pipe" and CJ/T 126-2000 "gas steel
Frame polyethylene plastic composite pipe ", the main technical changes compared with CJ/T 125-2000 and CJ/T 126-2000 are as follows.
--- Increased elastic seal (see 4.4);
--- Increased DN600 specifications pipe, and DN600 pipe corresponding to the various parameters (see 6.3.1.1);
--- Increased resistance of fused pipe fittings and resistance measurement requirements (see 6.6,7.9);
--- Increase the resistance of the fused tube when the storage test requirements (see 9.4.2);
--- Increased flange adapter with O-ring specifications (see Appendix A.1);
--- Modify the polyethylene material properties (see 4.1,.2000 version 4.1);
--- Modify the expression of the pipe (see 5.2, 6.3.2, Appendix B,.2000 edition of Appendix B);
--- Modify the sampling plan, using the acceptance quality limit AQL = 2.5 (see 8.3.2);
--- Remove the bending requirements (see the.2000 version of 6.5, 7.5).
This standard proposed by the Ministry of Housing and Urban Standard and Design Institute.
This standard by the Ministry of Housing and Urban Gas Standardization Technical Committee centralized.
This standard was drafted. CRE Sky Resources Development Co., Ltd., Harbin Stavi Machinery Manufacturing Co., Daqing Oilfield Kun
Lun Group Co., Ltd. Pipe Branch, Anyuan Pipeline Industrial Co., Ltd.
The main drafters of this standard. Li Peng, Tao Huafeng, Zhang Tianjun, Lin Baoqing, Liu Hong, Sun Qingjun, Lei Sun, Chen Hailiang.
This standard replaces the standards previously issued as follows.
--- CJ/T 125-2000;
--- CJ/T 126-2000.
Gas steel frame polyethylene plastic composite pipe and fittings
1 Scope
This standard specifies the gas steel skeleton polyethylene plastic composite pipe (hereinafter referred to as the pipe) and steel skeleton polyethylene plastic composite pipe (to
Hereinafter referred to as the tube) terms and definitions, raw materials, general requirements, requirements, test methods, inspection rules, labeling, packaging, transportation and storage.
This standard applies to the working temperature is -20 ℃ ~ 40 ℃, the maximum working pressure is not greater than 1.6MPa, nominal diameter 50mm ~
600mm gas steel skeleton polyethylene pipe and pipe fittings.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 228.1 Tensile testing of metallic materials - Part 1. Room temperature test method
GB/T 709 hot-rolled steel sheet and strip size, shape, weight and tolerances
GB/T 1033.1 Determination of plastic non-foam density - Part 1. Immersion, liquid pyknometer and titration
GB/T 2828.1 Sampling procedures for inspection - Part 1. Batch inspection sampling plan by acceptance quality limit (AQL)
GB/T 2918 plastic sample conditioning and testing of the standard environment
GB/T 3681 plastic natural daylight weathering, solar weathering after glass filtration and Fresnel lens to accelerate solar weathering
Exposure test method
GB/T 3682 Thermoplastics melt mass flow rate and melt volume flow rate determination
Thermoplastics pipes for the conveyance of fluids - Pressure resistance test methods
Thermoplastics pipes - Determination of longitudinal shrinkage
Plastics piping systems - Determination of dimensions of plastic parts
GB/T 13021 Polyethylene pipe and fittings carbon black content (thermal weight loss method)
Buried polyethylene (PE) piping systems for gas - Part 1. Pipes
GB/T 18251 Polyolefin pipes, fittings and mixed materials Determination of pigment and carbon black dispersion
GB/T 18475 thermoplastic pressure pipe and fittings material classification and nomenclature overall use (design) coefficient
GB/T 18476 Determination of resistance to crack propagation in polyolefin pipes for fluid transport - Test method for slow crack growth in notched pipe
(Incision test)
GB/T 19466.6 Plastics - Differential Scanning Calorimetry (DSC) Part 6. Oxidation induction time (isothermal OIT) and oxidation induction
Determination of temperature (dynamic OIT)
HG/T 3092 gas pipes and fittings rubber ring compound
YB/T 5294 general purpose low carbon steel wire
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Nominal pressure nominalpressure
Pipe and fittings at 20 ℃ under the conditions of natural gas allowable maximum working pressure, expressed in PN.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of CJ/T 125-2014_English be delivered?Answer: Upon your order, we will start to translate CJ/T 125-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of CJ/T 125-2014_English with my colleagues?Answer: Yes. The purchased PDF of CJ/T 125-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version CJ/T 125-2014?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version CJ/T 125-2014 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|