HOME   Cart(0)   Quotation   About-Us Tax PDFs Standard-List Powered by Google www.ChineseStandard.net Database: 189759 (1 Jun 2025)

English GB/T 39334.2-2020 PDF

Search result: GB/T 39334.2-2020
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 39334.2-2020English279 Add to Cart 3 days [Need to translate] Digital simulation of mechanical products manufacturing process - Part 2: Requirements of production line planning and layout simulation Valid GB/T 39334.2-2020


BASIC DATA
Standard ID GB/T 39334.2-2020 (GB/T39334.2-2020)
Description (Translated English) Digital simulation of mechanical products manufacturing process - Part 2: Requirements of production line planning and layout simulation
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard J04
Classification of International Standard 01.100.01
Word Count Estimation 15,136
Date of Issue 2020-11-19
Date of Implementation 2021-03-01
Regulation (derived from) National Standard Announcement No. 26 of 2020
Issuing agency(ies) State Administration for Market Regulation, National Standardization Administration


GB/T 39334.2-2020 Digital simulation of mechanical products manufacturing process-Part 2.Requirements of production line planning and layout simulation ICS 01.100.01 J04 National Standards of People's Republic of China Digital simulation of mechanical product manufacturing process Part 2.Production line planning and layout simulation requirements 2020-11-19 released 2021-03-01 implementation State Administration for Market Regulation Issued by the National Standardization Management Committee Table of contents Preface Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 General requirements 1 5 Basic process 2 6 Detailed requirements 3 6.1 Formulation of simulation plan 3 6.2 Simulation model construction 4 6.3 Simulation operation analysis 7 6.4 Optimization and evaluation of results 8 Appendix A (informative appendix) Production line planning and layout simulation example 11 Preface GB/T 39334 "Digital Simulation of Mechanical Product Manufacturing Process" is divided into 5 parts. ---Part 1.General requirements; ---Part 2.Production line planning and layout simulation requirements; ---Part 3.Logistics simulation requirements of assembly workshop; ---Part 4.Requirements for simulation of CNC machining process; ---Part 5.Typical process simulation requirements. This part is Part 2 of GB/T 39334. This section was drafted in accordance with the rules given in GB/T 1.1-2009. Please note that certain contents of this document may involve patents. The issuing agency of this document is not responsible for identifying these patents. This part is proposed and managed by the National Technical Product Documentation Standardization Technical Committee (SAC/TC146). Drafting organizations of this section. CRRC Zhuzhou Electric Locomotive Co., Ltd., CMC Productivity Promotion Center, CRRC Tangshan Locomotive and Rolling Stock Co., Ltd., Xugong Group Construction Machinery Co., Ltd., SAIC-GM-Wuling Automobile Co., Ltd., Hunan Liancheng Rail Equipment Co., Ltd., Shaanxi Fast Gear Co., Ltd., Xidian University, Chongqing Huashu Robot Co., Ltd., Foshan Intelligent Equipment Technology Research Institute, North Beijing Automation Control Equipment Research Institute, Xi'an Shaangu Power Co., Ltd., Anhui Ecolan Environmental Protection Co., Ltd., Shenzhen Greensun Technology Co., Ltd. The main drafters of this section. Liu Yi, Wang Yunfeng, Chen Jie, Luan Xiaodong, Ling Libin, Wang Liankun, Qin Qingze, Song Ruzhang, Yan Jianbo, Zhao Yanwen, Li Shen, Wang Xuli, Gao Meng, Zhang Zhipu, Chen Haihua, Chen Yuping, Wang Linying, Liu Yi, Song Zhiliang, Cheng Xuefeng, Wang Hongmin. Digital simulation of mechanical product manufacturing process Part 2.Production line planning and layout simulation requirements 1 Scope This part of GB/T 39334 specifies the general requirements and basic procedures for production line planning and layout simulation in the manufacturing process of mechanical products. And detailed requirements for simulation plan formulation, simulation model construction, simulation operation analysis, result evaluation and optimization. This part is applicable to the application, development, service and research related to production line planning and layout simulation in the manufacturing process of mechanical products. 2 Normative references The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article Pieces. For undated references, the latest version (including all amendments) applies to this document. GB/T 24734.1-2009 Technical Product Documentation Digital Product Definition Data General Rules Part 1.Terms and Definitions GB/T 26099.1-2010 General Rules for 3D Modeling of Mechanical Products Part 1.General Requirements GB/T 26099.2-2010 General Rules for 3D Modeling of Mechanical Products Part 2.Part Modeling GB/T 39334.1 Digital Simulation of Mechanical Product Manufacturing Process Part 1.General Requirements 3 Terms and definitions GB/T 24734.1-2009, GB/T 26099.1-2010, GB/T 26099.2-2010 and GB/T 39334.1 defined and The following terms and definitions apply to this document. 3.1 Production line planning In the design or transformation stage of the production line, the station, equipment, material cache, storage, etc. in the production line are pre-determined according to the process route of the product Activities such as the type, location, number, or capacity of facilities. 3.2 Production line layout Under the conditions of meeting the given space or performance constraints, rationally and optimally arrange various facilities such as workstations, equipment, material storage, storage, etc. Activities in a specific space. 3.3 Production line planning and layout simulation Establish a system model to abstract and describe the production line, and use computer simulation technology to simulate the operation process of the actual production line, and then In different working environments, the activities of verifying, analyzing and evaluating production line operation plans and strategies. 4 General requirements Production line planning and layout simulation should meet the following requirements. ......

Similar standards: GB/T 38898   GB/T 38896   GB/T 39432   GB/T 39334.4   GB/T 39334.5   GB/T 39334.3