Search result: GB/T 39334.2-2020
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 39334.2-2020 | English | 279 |
Add to Cart
|
3 days [Need to translate]
|
Digital simulation of mechanical products manufacturing process - Part 2: Requirements of production line planning and layout simulation
| Valid |
GB/T 39334.2-2020
|
Standard ID | GB/T 39334.2-2020 (GB/T39334.2-2020) | Description (Translated English) | Digital simulation of mechanical products manufacturing process - Part 2: Requirements of production line planning and layout simulation | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | J04 | Classification of International Standard | 01.100.01 | Word Count Estimation | 15,136 | Date of Issue | 2020-11-19 | Date of Implementation | 2021-03-01 | Regulation (derived from) | National Standard Announcement No. 26 of 2020 | Issuing agency(ies) | State Administration for Market Regulation, National Standardization Administration |
GB/T 39334.2-2020
Digital simulation of mechanical products manufacturing process-Part 2.Requirements of production line planning and layout simulation
ICS 01.100.01
J04
National Standards of People's Republic of China
Digital simulation of mechanical product manufacturing process
Part 2.Production line planning and layout simulation requirements
2020-11-19 released
2021-03-01 implementation
State Administration for Market Regulation
Issued by the National Standardization Management Committee
Table of contents
Preface Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 General requirements 1
5 Basic process 2
6 Detailed requirements 3
6.1 Formulation of simulation plan 3
6.2 Simulation model construction 4
6.3 Simulation operation analysis 7
6.4 Optimization and evaluation of results 8
Appendix A (informative appendix) Production line planning and layout simulation example 11
Preface
GB/T 39334 "Digital Simulation of Mechanical Product Manufacturing Process" is divided into 5 parts.
---Part 1.General requirements;
---Part 2.Production line planning and layout simulation requirements;
---Part 3.Logistics simulation requirements of assembly workshop;
---Part 4.Requirements for simulation of CNC machining process;
---Part 5.Typical process simulation requirements.
This part is Part 2 of GB/T 39334.
This section was drafted in accordance with the rules given in GB/T 1.1-2009.
Please note that certain contents of this document may involve patents. The issuing agency of this document is not responsible for identifying these patents.
This part is proposed and managed by the National Technical Product Documentation Standardization Technical Committee (SAC/TC146).
Drafting organizations of this section. CRRC Zhuzhou Electric Locomotive Co., Ltd., CMC Productivity Promotion Center, CRRC Tangshan Locomotive and Rolling Stock Co., Ltd.,
Xugong Group Construction Machinery Co., Ltd., SAIC-GM-Wuling Automobile Co., Ltd., Hunan Liancheng Rail Equipment Co., Ltd., Shaanxi
Fast Gear Co., Ltd., Xidian University, Chongqing Huashu Robot Co., Ltd., Foshan Intelligent Equipment Technology Research Institute, North
Beijing Automation Control Equipment Research Institute, Xi'an Shaangu Power Co., Ltd., Anhui Ecolan Environmental Protection Co., Ltd., Shenzhen Greensun
Technology Co., Ltd.
The main drafters of this section. Liu Yi, Wang Yunfeng, Chen Jie, Luan Xiaodong, Ling Libin, Wang Liankun, Qin Qingze, Song Ruzhang, Yan Jianbo, Zhao Yanwen,
Li Shen, Wang Xuli, Gao Meng, Zhang Zhipu, Chen Haihua, Chen Yuping, Wang Linying, Liu Yi, Song Zhiliang, Cheng Xuefeng, Wang Hongmin.
Digital simulation of mechanical product manufacturing process
Part 2.Production line planning and layout simulation requirements
1 Scope
This part of GB/T 39334 specifies the general requirements and basic procedures for production line planning and layout simulation in the manufacturing process of mechanical products.
And detailed requirements for simulation plan formulation, simulation model construction, simulation operation analysis, result evaluation and optimization.
This part is applicable to the application, development, service and research related to production line planning and layout simulation in the manufacturing process of mechanical products.
2 Normative references
The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB/T 24734.1-2009 Technical Product Documentation Digital Product Definition Data General Rules Part 1.Terms and Definitions
GB/T 26099.1-2010 General Rules for 3D Modeling of Mechanical Products Part 1.General Requirements
GB/T 26099.2-2010 General Rules for 3D Modeling of Mechanical Products Part 2.Part Modeling
GB/T 39334.1 Digital Simulation of Mechanical Product Manufacturing Process Part 1.General Requirements
3 Terms and definitions
GB/T 24734.1-2009, GB/T 26099.1-2010, GB/T 26099.2-2010 and GB/T 39334.1 defined and
The following terms and definitions apply to this document.
3.1
Production line planning
In the design or transformation stage of the production line, the station, equipment, material cache, storage, etc. in the production line are pre-determined according to the process route of the product
Activities such as the type, location, number, or capacity of facilities.
3.2
Production line layout
Under the conditions of meeting the given space or performance constraints, rationally and optimally arrange various facilities such as workstations, equipment, material storage, storage, etc.
Activities in a specific space.
3.3
Production line planning and layout simulation
Establish a system model to abstract and describe the production line, and use computer simulation technology to simulate the operation process of the actual production line, and then
In different working environments, the activities of verifying, analyzing and evaluating production line operation plans and strategies.
4 General requirements
Production line planning and layout simulation should meet the following requirements.
......
|