US$219.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 26925-2025: Water saving enterprises - Fossil fired plant Status: Valid GB/T 26925: Evolution and historical versions
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 26925-2025 | English | 219 |
Add to Cart
|
3 days [Need to translate]
|
Water saving enterprises - Fossil fired plant
| Valid |
GB/T 26925-2025
|
GB/T 26925-2011 | English | 169 |
Add to Cart
|
3 days [Need to translate]
|
Water saving enterprises -- Fossil fired plant
| Valid |
GB/T 26925-2011
|
PDF Samples
Basic data Standard ID | GB/T 26925-2025 (GB/T26925-2025) | Description (Translated English) | Water saving enterprises - Fossil fired plant | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | P01 | Classification of International Standard | 03.100.50 | Word Count Estimation | 10,149 | Date of Issue | 2025-04-25 | Date of Implementation | 2025-08-01 | Older Standard (superseded by this standard) | GB/T 26925-2011 | Issuing agency(ies) | State Administration for Market Regulation, National Standardization Administration |
GB/T 26925-2025: Water saving enterprises - Fossil fired plant---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 03.100.50
CCSP01
National Standard of the People's Republic of China
Replaces GB/T 26925-2011
Water-saving enterprises Thermal power generation industry
Released on 2025-04-25
2025-08-01 Implementation
State Administration for Market Regulation
The National Standardization Administration issued
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents"
Drafting.
This document replaces GB/T 26925-2011 "Water-saving Enterprise Thermal Power Generation Industry". Compared with GB/T 26925-2011,
In addition to structural adjustments and editorial changes, the main technical changes are as follows.
a) The terms and definitions have been changed (see Chapter 3, Chapter 3 of the.2011 edition);
b) Modified some basic requirements for water-saving enterprises (see 4.2, 4.2 of the.2011 edition);
c) Modified some water-saving enterprise management indicators and requirements (see 4.3, 4.3 of the.2011 edition);
d) Modified some technical indicators and requirements for water-saving enterprises (see 4.4, 4.4 of the.2011 edition);
e) The scoring method of Appendix A has been changed (see Appendix A, Appendix A of the.2011 edition).
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document was proposed by the Ministry of Industry and Information Technology of the People's Republic of China.
This document is under the jurisdiction of the National Technical Committee on Water Conservation Standardization (SAC/TC442).
This document was drafted by. China Electricity Council, Guoneng Longyuan Environmental Protection Co., Ltd., Huadian Electric Power Research Institute Co., Ltd.,
China National Institute of Standardization, Xi'an Xire Water Service and Environmental Protection Co., Ltd., Huadian Zhengzhou Mechanical Design and Research Institute Co., Ltd., China Datang Group Science and Technology
China Electric Power Research Institute Co., Ltd., East China Electric Power Testing Institute, China Huaneng Group Co., Ltd., China Electricity Council Power Construction
Technical and Economic Consulting Center, China Datang Corporation Limited Inner Mongolia Branch, Ministry of Water Resources, Ministry of Transport, National Energy Administration, Nanjing Water Resources Science and Technology
Research Institute, Rundian Energy Science and Technology Co., Ltd., China Power Construction New Energy Group Co., Ltd., North China Electric Power Research Institute Co., Ltd.
Company, State Grid Heilongjiang Electric Power Co., Ltd. Economic and Technological Research Institute, Jiangsu Huamei Thermal Power Co., Ltd., Inner Mongolia Agricultural University, Zhejiang Zhejiang Energy
Power Co., Ltd., Guoneng Zhejiang Ninghai Power Generation Co., Ltd., Huaneng Qinbei Power Generation Co., Ltd., Shandong Haihua Group Co., Ltd.,
Pinghu Water Conservancy Engineering Co., Ltd. and China Power Engineering Group Guizhou Electric Power Design Institute Co., Ltd.
The main drafters of this document are. Liu Zhiqiang, Tang Guorui, Lao Jun, Zhang Lin, Cai Rong, Wang Jing, Wang Huixian, Zhao Baohua, Bai Yan, Gao Changzheng, Mu Xiaowei,
Wang Ye, Han Chao, Li Dongwei, Chen Jian, Xu Chun, Wang Yanzhao, Liu Jun, Zhao Mingrui, He Qian, Zhao Zhenning, Pan Wei, Wang Xiaojun, Xue Changgang, Gao Yajing,
You Liangzhou, Feng Liguo, Zhao Yiping, Wang Ying, Zhao Lin, Lu Guanfa, Liu Xiaomin, Yang Yaotian, Liu Hongfang, Yue Maowen, Sun Zhenlei, Wu Dongliang, Wen Donghong,
Leng Panpan, Yang Zhaoling.
This document was first published in.2011 and this is the first revision.
Water-saving enterprises Thermal power generation industry
1 Scope
This document specifies the index system and requirements for evaluating water-saving enterprises in the thermal power generation industry.
This document is applicable to the evaluation of water-saving enterprises in the thermal power generation industry.
2 Normative references
The contents of the following documents constitute essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to
This document.
GB/T 7119 Guidelines for the evaluation of water-saving enterprises
GB/T 12452 General rules for water balance test
GB/T 18820 General rules for the compilation of industrial water quotas
GB/T 18916.1 Water intake quota Part 1.Thermal power generation
GB/T 21534 Terminology for water conservation
GB/T 24789 General rules for configuration and management of water metering instruments in water-using units
DL/T 606.5 Guidelines for energy balance of thermal power plants Part 5.Water balance test
DL/T 2385 Technical Guidelines for the Installation and Management of Water Metering Instruments in Thermal Power Plants
DL/T 2507 Calculation method of water efficiency index for thermal power plants
3 Terms and definitions
The terms and definitions defined in GB/T 7119, GB/T 18820, GB/T 18916.1 and GB/T 21534 apply to this document.
4 Evaluation index system and requirements
4.1 The water-saving enterprise evaluation index system includes basic requirements, management indicators and technical indicators.
4.2 Water-saving enterprises should meet all basic requirements as shown in Table 1.
4.3 The management indicators and requirements for water-saving enterprises are shown in Table 2.The management indicators are calculated according to the method given in Appendix A.
4.4 Water-saving enterprises should meet all technical indicators and requirements shown in Table 3.Technical indicators are calculated in accordance with DL/T 606.5 and DL/T 2507.
Table 1 Basic requirements for water-saving enterprises
Serial number requirements
1.Domestic water and production water are metered and paid separately
Self-made steam units should recycle the steam condensate from the steam supply boiler to the boiler feed water or process water; outsourced steam units should make full use of the steam condensate to
Condensate, not discharged directly
......
|