Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 44257.1-2024 PDF English

US$575.00 · In stock · Download in 9 seconds
GB/T 44257.1-2024: Traction battery of electric earth-moving machinery - Part 1: Safety requirements
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
Standard IDUSDBUY PDFDeliveryStandard Title (Description)Status
GB/T 44257.1-2024575 Add to Cart Auto, 9 seconds. Traction battery of electric earth-moving machinery - Part 1: Safety requirements Valid

Similar standards

GB/T 44257.2   GB/T 41495   GB/T 38943.1   GB/T 44255   

GB/T 44257.1-2024: Traction battery of electric earth-moving machinery - Part 1: Safety requirements


---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT44257.1-2024
GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 53.100 CCS P 97 Traction battery of electric earth-moving machinery - Part 1.Safety requirements Issued on. JULY 24, 2024 Implemented on. JULY 24, 2024 Issued by. State Administration for Market Regulation; National Standardization Administration.

Table of Contents

Foreword... 3 Introduction... 4 1 Scope... 5 2 Normative references... 5 3 Terms and definitions... 6 4 Symbols and abbreviations... 7 5 Safety requirements... 7 6 Test conditions... 9 7 Test preparation... 11 8 Test method... 13 Appendix A (Normative) Thermal diffusion test... 32 Appendix B (Informative) Typical structure of battery pack or battery system... 39 Appendix C (Normative) Insulation resistance test method for battery pack or battery system... 41 References... 44 Traction battery of electric earth-moving machinery - Part 1.Safety requirements

1 Scope

This document specifies the safety requirements for power battery cells, battery packs or battery systems for electric earthmoving machinery; describes the relevant test methods. This document is applicable to the manufacture of power lithium-ion batteries for electric earthmoving machinery; the manufacture of other types of power batteries is implemented with reference to it.

2 Normative references

The contents of the following documents constitute essential clauses of this document through normative references in the text. Among them, for referenced documents with dates, only the version corresponding to that date applies to this document; for referenced documents without dates, the latest version (including all amendments) applies to this document. GB/T 2423.4 Environmental testing for electric and electronic products - Part 2.Test method - Test Db. Damp heat, cyclic (12 h + 12 h cycle) GB/T 2423.17 Environmental testing for electric and electronic products - Part 2. Test method - Test Ka. Salt mist GB/T 2423.43 Environmental testing for electric and electronic products - Part 2. Test methods - Mounting of specimens for vibration, impact and similar dynamic tests

4 Symbols and abbreviations

4.1 Symbols The following symbols apply to this document. I1.1 h rate discharge current (A), whose value is equal to the rated capacity value. I3.3 h rate discharge current (A), whose value is equal to 1/3 of the rated capacity value.

5 Safety requirements

5.1 Safety requirements for battery cells 5.1.1 Battery cells shall not catch fire or explode, when subjected to over-discharge test in accordance with 8.1.2. 5.1.6 The battery cell shall be subjected to extrusion test in accordance with 8.1.7 and shall not catch fire or explode. 5.2 Safety requirements for battery packs or battery systems 5.2.1 The battery pack or battery system shall be subjected to vibration test in accordance with 8.2.1 and shall not have leakage, shell rupture, fire or explosion; it shall not trigger the voltage and temperature sharp change thresholds specified by the manufacturer. The insulation resistance after the test shall not be less than 100 Ω/V. 5.2.7 The battery pack or battery system shall be subjected to the external fire test in accordance with 8.2.7 and shall not explode. 5.2.8 The battery pack or battery system shall be subjected to the temperature shock test in accordance with 8.2.8; it shall not have leakage, shell rupture, fire or explosion. The insulation resistance after the test shall not be less than 100 Ω/V. 5.2.9 The battery pack or battery system shall be subjected to salt spray test in accordance with 8.2.9; there shall be no leakage, shell rupture, fire or explosion. The insulation resistance after the test shall not be less than 100 Ω/V. 6.1.5 The battery pack or battery system shall be tested for insulation resistance before all tests and after some tests. The test location is between the two terminals and the electrical platform. It is required that the measured insulation resistance value divided by the maximum operating voltage of the battery pack or battery system is not less than 100 Ω/V. The test method shall be in accordance with the provisions of Appendix C. 6.1.6 If the battery pack or battery system is not suitable for certain tests due to some reasons (such as size or mass), the manufacturer and the testing agency may use the subsystem of the battery pack or battery system as the test object for all or part of the test after consultation; 6.1.7 Method for adjusting SOC to the test target value n. fully charge the battery pack or battery system according to the charging method provided by the manufacturer; let it stand for 1 hour; discharge it at a constant current of 1 I3. 6.1.8 The charge and discharge rate, charge and discharge method, charge and discharge cut-off conditions during the test shall be provided by the manufacturer. 6.1.9 The rated capacity of a battery cell, battery pack or battery system shall comply with the product technical conditions provided by the manufacturer. 6.2 Accuracy of measuring instruments and meters The accuracy of measuring instruments and meters shall not be less than the following requirements. 6.3 Test process error The error requirements between the control value (actual value) and the target value are as follows. 6.4 Data recording and recording interval Unless otherwise specified, the recording interval of test data (such as time, temperature, current, voltage, etc.) shall not be greater than 15 s.

7 Test preparation

7.1 Battery cell test preparation 7.1.1 Standard charging The battery cell is first discharged with a current specified by the manufacturer and not less than 1I3 to the discharge termination voltage specified in the manufacturer's technical conditions. 7.2.2.3 Unless otherwise specified in the specific test items, the test shall be started within 24 hours after the pretreatment cycle is completed and fully charged; otherwise, a standard charge shall be performed again.

8 Test method

8.1 Test method for battery cell safety 8.1.1 General requirements All safety tests are carried out under environmental conditions with sufficient safety protection. If the test object has additional active protection circuits or devices, they shall be removed. 8.1.2 Over-discharge 8.1.3 Over-charge 8.1.3.1 The test object is a battery cell. 8.1.3.4 After completing the above test steps, observe at the test environment temperature for 1 hour. 8.1.4 External short circuit 8.2.6 Dustproof and waterproof 8.2.6.1 Dustproof 8.2.6.2 Waterproof 8.2.6.2.1 The test object is a battery pack or battery system that has passed the dustproof test in 8.2.6.1. 8.2.6.2.3 Take the test object out of the water. Observe it at the test environment temperature for 2 hours. 8.2.7 External fire 8.2.7.1 The test object is a battery pack or battery system. The body structure that protects the battery pack or battery system can participate in the fire test. 8.2.7.2 The test environment temperature is above 0 °C and the wind speed is not more than 2.5 km/h. system manufacturer, until the test is completed. 8.2.12 Overcurrent protection 8.2.12.1 The test object is a battery system that can be powered by an external DC power supply. 8.2.12.2 The test conditions are as follows. 8.2.12.3 Perform overcurrent test in accordance with the battery system manufacturer's data. 8.2.12.4 The test ends when any of the following conditions are met. 8.2.12.5 After completing the above test steps, observe at the test environment temperature for 1 h. 8.2.13 External short-circuit protection 8.2.13.1 The test object is a battery system. 8.2.15 Over-discharge protection 8.2.15.1 The test object is a battery system. 8.2.15.2 The test conditions are as follows. 8.2.15.3 The discharge process is as follows. 8.2.15.4 The discharge shall continue until any of the following conditions are met, then the test is terminated. ......

Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Image 1     Image 2     Image 3     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of English version of GB/T 44257.1-2024 be delivered?Answer: The full copy PDF of English version of GB/T 44257.1-2024 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB/T 44257.1-2024_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 44257.1-2024_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 44257.1-2024 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

How to buy and download a true PDF of English version of GB/T 44257.1-2024?

A step-by-step guide to download PDF of GB/T 44257.1-2024_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB/T 44257.1-2024".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9