Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 26751-2022 PDF English

US$160.00 · In stock · Download in 9 seconds
GB/T 26751-2022: Ground granulated electric furnace phosphorous slag powder used for cement and concrete
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid

GB/T 26751: Historical versions

Standard IDUSDBUY PDFDeliveryStandard Title (Description)Status
GB/T 26751-2022160 Add to Cart Auto, 9 seconds. Ground granulated electric furnace phosphorous slag powder used for cement and concrete Valid
GB/T 26751-2011135 Add to Cart Auto, 9 seconds. Ground granulated electric furnace phosphorous slag powder used for cement and concrete Obsolete

Similar standards

GB/T 27690   GB/T 23265   GB/T 26751   

GB/T 26751-2022: Ground granulated electric furnace phosphorous slag powder used for cement and concrete


---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT26751-2022
GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 91.100.10 CCS Q 12 Replacing GB/T 26751-2011 Ground Granulated Electric Furnace Phosphorous Slag Powder Used for Cement and Concrete Issued on. DECEMBER 30, 2022 Implemented on. JULY 1, 2023 Issued by. State Administration for Market Regulation; Standardization Administration of the People’s Republic of China.

Table of Contents

Foreword... 3 1 Scope... 5 2 Normative References... 5 3 Terms and Definitions... 6 4 Composition and Materials... 6 5 Technical Requirements... 6 6 Test Methods... 7 7 Inspection Rules... 7 8 Packaging, Marking, Transportation and Storage... 10 Appendix A (normative) Inspection Methods for Activity Index and Fluidity Ratio of Phosphorous Slag Powder... 11

Foreword

This document was drafted in accordance with the rules provided in GB/T 1.1-2020 Directives for Standardization - Part 1.Rules for the Structure and Drafting of Standardizing Documents. This document serves as a replacement of GB/T 26751-2011 Ground Granulated Electric Furnace Phosphorous Slag Powder Used for Cement and Concrete. In comparison with GB/T 26751-2011, apart from structural adjustments and editorial modifications, the main technical changes are as follows. a) The definition of “ground granulated electric furnace phosphorous slag powder” is modified (see 3.1; 3.1 of Version 2011); b) The provisions on the addition of gypsum in the composition are deleted, and the requirements for the sulfur trioxide content index in phosphorous slag powder are modified (see Chapter 4 and Table 1; 4.2 and Table 1 of Version 2011); c) The provisions on exit-factory inspection and type inspection are modified (see 7.2 and 7.4; 7.2 and 7.3 of Version 2011); d) The determination rules are modified (see 7.3; 7.4 of Version 2011); e) The requirements for the inspection report are modified (see 7.5; 7.4.4 of Version 2011); f) The provisions on the arbitration and inspection institutions are modified (see 7.6.2 and 7.6.3; 7.5.2 and 7.5.3 of Version 2011); g) The provisions on the packaging are modified (see 8.1; 9.1 of Version 2011); h) The requirements for reference cement for activity index testing are modified (see A.2.1; A.2.1 of Version 2011). Please be noted that certain content of this document may involve patents. The institution issuing this document does not undertake the responsibility of identifying these patents. This document was proposed by China Building Materials Federation. This document shall be under the jurisdiction of National Technical Committee 184 on Cement of Standardization Administration of China (SAC/TC 184). The drafting organizations of this document. China Building Materials Academy Co., Ltd.; China Railway 20th Bureau Group Co., Ltd.; Guizhou Building Materials Product Quality Inspection and Testing Institute; Wuhan University of Technology; Guizhou Xintianxin Chemical Co., Ltd.; China Academy of Building Research; China National Chemical Communications Construction Group Co., Ltd.; Yangjiang Dadi Environmental Protection Building Materials Co., Ltd.; Northwest Engineering Co., Ltd. of Power China; China Railway First Survey and Design Institute Group Co., Ltd.; Road & Bridge International Co., Ltd.; Fengman Dam Reconstruction Project Construction Bureau of Songhua River Hydropower Co., Ltd.; Southern Engineering Co., Ltd. of Road & Bridge International; Haiyan Shendang Southern Concrete Co., Ltd.; Shandong Expressway Engineering Inspection Co., Ltd.; Hubei Research and Design Institute of Building Science; Beijing University of Technology; Jiangsu Research Institute of Building Science Co., Ltd.; Zhongxin Construction Co., Ltd.; Changjiang River Scientific Research Institute; Guangxi Highway Inspection Co., Ltd.; China Road and Bridge Corporation; MCC Wuhan Metallurgical Construction Research Institute Co., Ltd.; Beijing BBMG Cement Energy Saving Technology Co., Ltd.; Zhejiang Xinhua Construction Group Co., Ltd.; China Railway 18th Bureau Group Co., Ltd.; Sichuan Lisen Building Materials Group Co., Ltd.; Ningxia Saima Cement Co., Ltd.; Shenzhen University; Tangshan Branch of BBMG Jidong Cement (Tangshan) Co., Ltd.; 3rd Engineering Co., Ltd. of China Railway 23rd Bureau Group Co., Ltd.; Gezhouba Xinjiang Testing and Inspection Co., Ltd.; Guizhou Construction Science Research & Design Institute Limited Company of CSCEC; China West Construction Group Co., Ltd.; China Railway Urban Construction Group The 1st Engineering Co., Ltd.; China Construction Second Engineering Bureau Co., Ltd.; China United Cement Lunan Co., Ltd.; China United Cement Qufu Co., Ltd.; China United Cement Rizhao Port Co., Ltd.; Shanghai Zhangyan Southern Cement Co., Ltd.; Jining Zhonglian Cement Co., Ltd.; Anhui Conch Design & Research Institute of Building Materials Co., Ltd.; China Railway Construction Group Southern Engineering Co., Ltd.; Kuming University of Science and Technology; Hunan University; Taian Quality and Special Equipment Inspection Institute; Mianyang Polytechnic; Shandong Junhong Environmental Protection Technology Co., Ltd.; Yunnan Shanyin Tongchuang Engineering Technology Co., Ltd.; Zhoushan Yizheng Construction Engineering Inspection Co., Ltd.; CCCC (Guangzhou) Construction Co., Ltd.; Wuhai Xishui Cement Co., Ltd.; Wuhai Saima Cement Co., Ltd.; China Railway Construction Group Co., Ltd. The main drafters of this document. Yan Bilan, Wang Xin, Liao Taichang, Liu Chen, Zhang Jinshan, Chen Yue, Xie Jiangsheng, Sun Jinbo, Yu Yi, Guo Wenkang, Chen Wei, Li Qiu, Shen Yongli, Deng Dunyi, Liang Kunyue, Liang Guoan, Lu Guannan, Xiao Xiangrong, Wei Ying, Zhang Zhifu, Miao Qiang, Lei Jian, Cui Suping, Wang Jianfeng, Zheng Xu, Du Yong, Pang Yinghui, Hao Ruijun, Du Yuewen, Shen Kaihua, Xu Chuanchang, Zhou Lei, Liu Qi, Wang Hua, Bi Yeli, Liu Jiaxing, Han Yu, Yang Bo, Zhou Zichen, Li Nan, Ye Xiaoqin, Zhou Yongxiang, Huang Yaning, Shen Xin, Wang Yongchao, Ding Xiaobo, Zhang Zuhua, Du Wei, Yin Zhiyong, Xiong Zhigang, Qin Chunshan, Wan Chaodong, Zhao Jun, Shen Huiming, Qin Xiao, Lin Xihua, Liu Xiaoyong, Liao Juan, Wang Kedong, Chen Huadong, Cao Lanying, Liu Jiahai, Zhang Weiwei, Huang Yubing, Ma Lijun, Ge Quanwei, Jiang Bin, Song Jingyi, Xia Julei, Qiao Huanhuan, Zhai Meng, Li Puzhong, Ding Zhong, Wang Xiaofu, Liu Yiquan, Zhu Xuejun, Ma Xuening, Li Bingbing. This document was firstly issued in 2011.This is the first revision. Ground Granulated Electric Furnace Phosphorous Slag Powder Used for Cement and Concrete

1 Scope

This document specifies the composition and materials, technical requirements, test methods, inspection rules, packaging, marking, transportation and storage of ground granulated electric furnace phosphorous slag powder. This document is applicable to ground granulated electric furnace phosphorous slag powder used as cement mixing material and concrete admixture (hereinafter referred to as “phosphorous slag powder”).

2 Normative References

The contents of the following documents constitute indispensable clauses of this document through the normative references in the text. In terms of references with a specified date, only versions with a specified date are applicable to this document. In terms of references without a specified date, the latest version (including all the modifications) is applicable to this document. GB 175 Common Portland Cement GB/T 208 Standard Test Method for Cement Density GB/T 2419 Test Method for Fluidity of Cement Mortar GB 6566 Limits of Radionuclides in Building Materials GB/T 6645 Granulated Electric Furnace Phosphorous Slag Used for Cement GB/T 8074 Testing Method for Specific Surface of Cement - Blaine Method GB/T 9774 Sacks for Packing Cement GB/T 12573 Sampling Method for Cement

3 Terms and Definitions

The following terms and definitions are applicable to this document.

4 Composition and Materials

4.1 Granulated Electric Furnace Phosphorous Slag Comply with the stipulations of GB/T 6645.

5 Technical Requirements

The phosphorous slag powder shall comply with the requirements of the technical indicators in Table 1.

6 Test Methods

6.1 Specific Surface Area Carry out the test in accordance with the stipulations of GB/T 8074. 6.2 Activity Index and Fluidity Ratio Carry out the test in accordance with the stipulations of Appendix A. 6.3 Density Carry out the test in accordance with the stipulations of GB/T 208. 6.7 Radioactivity Carry out the test in accordance with the stipulations of GB 6566.

7 Inspection Rules

7.1 Numbering and Sampling 7.1.1 Numbering Before exiting the factory, phosphorous slag powder is numbered and sampled in accordance with its grade. Each number is a sampling unit. The exit-factory No. of phosphorous slag powder, in accordance with the annual production capacity of a single line of phosphorous slag powder, is specified as follows. 7.2 Inspection 7.2.1 Exit-factory inspection The exit-factory inspection items mainly include density, specific surface area, 7-d and 28-d activity index, fluidity ratio, moisture content, sulfur trioxide content, phosphorous pentoxide content and alkali content. 7.3 Determination Rules 7.3.1 Exit-factory inspection If the results of the exit-factory inspection comply with the relevant technical requirements in Chapter 5, they shall be deemed as qualified products. If any one of the inspection results does not comply with the technical requirements, then, they shall be deemed as disqualified products. 7.4 Exit-factory Requirements Phosphorous slag powder can only be allowed to exit the factory after it is confirmed that the various technical indicators and packaging comply with the requirements. When exiting the factory, the manufacturer shall provide the purchaser with relevant materials proving product quality. 7.5 Inspection Report The inspection report shall include the implemented standard, code, grade, exit-factory No., exit-factory inspection results, type and dosage of grinding aids, and other technical requirements agreed in the contract. 7.6 Delivery and Acceptance 7.6.1 The quality of the phosphorous slag powder product upon delivery can be based on the inspection results of physical samples, or the manufacturer’s inspection report of the same number of phosphorous slag powder. 7.6.2 When the inspection results of physical samples are taken as the basis for acceptance, the purchaser and the seller shall jointly take samples, sign and seal before shipment or at the place of delivery. The sampling method shall comply with GB/T 12573, and the sampling size is 10 kg, divided into 2 equal parts. 7.6.3 When the inspection report of the phosphorous slag powder with the same number from the manufacturer is taken as the acceptance basis, before shipment or at the time of delivery, the purchaser (or entrusted seller) shall take specimens from the phosphorous slag powder with the same number, and after being signed and sealed by both parties, they will be kept for 3 months.

8 Packaging, Marking, Transportation and Storage

8.1 Packaging The phosphorous slag powder can be packed in bags or in bulk. The packaging form is determined through negotiation between the purchaser and the seller. The net content of each bag of bagged phosphorous slag powder shall be no less than 99% of the marked mass; the total mass of 20 randomly taken bags (including the packaging bags) shall not be less than 100% of the marked mass. 8.2 Marking The packaging bag shall be clearly marked with the serial No. of this document, the manufacturer’s name, product name, category and code, grade, packaging date and exit-factory number. When packing in bulk, a card with the same content as the bag marking shall be submitted. ......

Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Image 1     Image 2     Image 3     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of English version of GB/T 26751-2022 be delivered?Answer: The full copy PDF of English version of GB/T 26751-2022 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB/T 26751-2022_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 26751-2022_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 26751-2022 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

Question 5: Should I purchase the latest version GB/T 26751-2022?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 26751-2022 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

How to buy and download a true PDF of English version of GB/T 26751-2022?

A step-by-step guide to download PDF of GB/T 26751-2022_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB/T 26751-2022".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9